Gn,ma Power Compary -
333 Pirsirr mtA<crue AtWt.s. Georgu 30308 Telephar m 404 526 6526 Myhrg Ad fre n-Post 0"ce Ucr 4545 gA At'anta. Georg.a 30302 Georgia Power ino toer m Owire whvo Power Generation Gepartment NED-83-026 January 18, ES3 Director of Nuclear Reactor Regulation Attention: Mr. John Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory CJmission Washington, D. C.
20555 NBC DOCKEIS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HA'ICH NCELEILR PIANr UNITS 1, 2 I&E BULIETIN NO. 81-03: FIIM BIOCKAGE OF COOLING WATER 'IO SAFETY SYSTFM COMPCtENTS BY CORBICUIA SP. (ASIATIC CIAM)
AND MYTILUS SP. (MUSSEL)
Gentlemen:
The NRC's letter dated December 10, 1982 request.e6 Georgia Power Company to provide information which was not addressed in our initial response to I&E Bulletin 81-03.
We hereby request an extension to the schedule for response specified in your letter until the end of the upcoming refueling outage at Plant Hatch Unit 2, currently scheduled for spring 1983. Failure to receive thi.3 extension would require an additional plant outage, resulting in lost generation during the inspection of some heat exchangers which are inaccessible during plant operations.
Our operating 1.istory, as reflected in our May 22, 1981 response to I&E Bulletin 81-03, supports our request for extension.
If you should require additional information regarding this request, please contact this office.
Very truly yours, A/
L. T. Gucwa Chief Nuclear Engineer Cr/mb Enclosure xc: