Text
_ -
. ~ - - -
v i
l HM l
Tentess(e Viky Authority, Post Office Box 2000. Sexkt/-Daisy, Terressre 37379 2000 Ken Powers Vcc Puukn d, Seqtrayah Nucioar Phrt August 10, 1994 U.S.
Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C.
20555 Gentlemen In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR. PLANT (SQN) - INSPECTION REPORT NOS. 50-327, 328/94 EXTEND CORRECTIVE ACTION DUE DATE
Reference:
Letter from Ken Powers to NRC dated April 8, 1994, "Sequoyah Nuclear Plant (SQN) - NRC Inspection Report Nos. 50-327, 328/94 Reply to Notice of Violation (NOV) 50-327, 328/94-06-01" This letter provides details concerning an extension to the due date for the corrective action to be taken in response to the referenced violation. The corrective action being extended involves revision to the environmental qualification (EQ) binders associated with cables in the steam generator enclosures. Since the time of the response to the violation, it has been determined that additional EQ binders are required to be revised.
Additionally, many of these same EQ binders are scheduled to be revised to address other unrelated issues. Multiple revisions to the same binders will not be as cost effective as revising the binders in a single revision. Therefore, it is prudent to extend the commitment schedule.
The enclosure includes the commitment and revised due date.
If you have any questions concerning this submittal, please telephone J.
W. Proffitt at (615) 843-6651.
Sincerely l
Ken Powers 1
160072 cc See page 2 9408180190 940810 PDR.ADOCK 05000327 if/
G PDR i
s s
U.S.
Nuclear Regulatory Commission Page 2 August 10, 1994 cc Mr.
D. E.
LaBarge, Project Manager U.S.
Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l
+.
ENCLOSURE COMMITMENTS INSPECTION REPORT 94-06 The EQ binders will be revised to reflect the correct environmental conditions and to establish the new qualified life for the affected components. This action will be completed by February 10, 1995.
-..,