Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Operational QA Program,Rev 2". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19208A782  + (Operational QA Program,Revision 7)
  • ML19323G345  + (Operational QA Program,Revision 8)
  • ML20008F405  + (Operational QA Program,Revision 9,re Duties & Responsibilities of Personnel Involved in Establishing & Executing Operational QA Program)
  • ML030380536  + (Operational Quality Assurance Plan)
  • ML20134E658  + (Operational Quality Assurance Plan Interpretation 96-001)
  • ML17355A658  + (Operational Quality Assurance Program Description (EN-QA-004), Rev. 52)
  • ML042300620  + (Operational Quality Assurance Program Inspection Program Changes and Clarifications, Withdrawal of Change Request)
  • ML20072M740  + (Operational Radiological Environ Monitoring for Davis-Besse Nuclear Power Station Unit 1,Annual Rept - Part I,1982)
  • ML20212K396  + (Operational Radiological Environ Monitoring for Davis Besse Nuclear Power Station Unit 1:Part I Summary & Interpretation,Jan-Dec 1984)
  • ML18142A335  + (Operational Radiological Environ Monitoring Program Annual Rept,1983)
  • ML17303B089  + (Operational Radiological Environ Monitoring Program Rept for 1987)
  • ML19309A609  + (Operational Radwaste Mgt Plan for Nv Test Site, Revision 1)
  • IR 05000278/1985041  + (Operational Readiness Assessment Insp Rept 50-278/85-41 on 851026-1206.No Violations Noted.Major Areas Inspected:Mgt Oversight & Corrective Action Tracking,Preoperational Testing & RHR Pump Insps & Repairs)
  • ML17348B233  + (Operational Readiness Assessment Team Insp Repts 50-250/91-38 & 50-251/91-38 on 910909-13.Violations Noted. Major Areas Inspected:Licensee Overall Operational Readiness Following Recent Outage)
  • IR 05000341/1985043  + (Operational Readiness Assessment Team Insp Rept 50-341/85-43 on 850818-20 & 0916-20.No Violations,Deviations or Safety Concerns Noted.Major Areas Inspected:Conduct of Operations & Corrective Actions Associated W/Recent Events)
  • ML15127A578  + (Operational Readiness Assessment Team Inspection Prerequisites)
  • ML062980431  + (Operational Readiness Assessment Team Inspection Prerequisites)
  • ML20150E970  + (Operational Readiness Insp Rept 50-457/88-07 on 880216-0307. Violations Noted.Major Areas Inspected:Operations, Surveillance & Testing,Maint,Radiation Controls,Chemistry Controls,Nuclear Engineering Activities & Training)
  • ML20202B119  + (Operational Readiness Plan, Rev 5)
  • ML20245G065  + (Operational Readiness Review Interim Rept,Browns Ferry Unit 2)
  • ML20033F256  + (Operational Readiness Review Phase Two Rept Browns Ferry Unit Two)
  • ML20094G699  + (Operational Readiness Review Plan for Resumption of Irts Operations,Hlw Treatment Phase II - Sludge Wash)
  • ML20072R240  + (Operational Readiness Review Rept,Final Phase)
  • IR 05000410/1987016  + (Operational Readiness Team Insp Rept 50-410/87-16 on 870601- 12.Violation Noted.Major Areas Inspected:Testing,Training & Maint & Assessed Licensee Readiness for Full Power Operations.Unresolved Item Identified)
  • IR 05000352/1987019  + (Operational Readings Team Insp Rept 50-352/87-19 on 870817- 21.Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance Testing,Plant Mods & Readiness for Plant to Resume Operations Following Outage)