ML090960671

From kanterella
Jump to navigation Jump to search
Operational Program Considerations
ML090960671
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/26/2009
From: Jha K, Reimnitz M
Bechtel Power Corp, Florida Power & Light Co
To:
Office of New Reactors
Nguyen C NRO/DNRL 301-415-1177
References
Download: ML090960671 (9)


Text

Turkey Point Units 6 & 7 Operational Program Considerations Mark Reimnitz - Bechtel Power Corporation Ken Jha - Bechtel Power Corporation March 26, 2009

2 The information provided in the following presentation is of a preliminary nature and is considered DRAFT Turkey Point Units 6 & 7 Operational Considerations

3 Reclaimed Water

- 100% Capacity - approximately 41,000 gpm

- Provide Cooling Water for other FPL use - approximately 10,000 gpm Saltwater

- 100% Capacity - approximately 86,000 gpm Mixed

- Up to full capacity Turkey Point Units 6 & 7 Operational Considerations Cooling Water Supply

4 Turkey Point Units 6 & 7 Operational Considerations

5

  • Method

- Underground Injection Control (UIC) Program Class I well injection to the Boulder Zone, a saline confined aquifer

- Authorized under Subpart K to 10 CFR 20 and 40 CFR 146.5

- Principal Criteria Hazardous waste prohibited Hydrologic confinement Hydraulic containment (materials selection)

Injection velocity Turkey Point Units 6 & 7 Operational Considerations Liquid Effluent Disposal

6

  • Sources

- Non-radioactive Blowdown Sump effluent

~12,500 gpm Reclaimed Water

~58,000 gpm Saltwater

- Radioactive LRW System Monitor Tank releases to Blowdown Sump effluent DCD Table 11.2-7 PWR-GALE code effluent source term

- 2020 Ci/yr for tritium (both units)

- 0.52 Ci/yr for other isotopes (both units), including 0.32 Ci/yr adjustment for anticipated operational occurrences Expect ~3 gpm average (both units) varying with unit operations Blowdown sump effluent is the dilution supply Turkey Point Units 6 & 7 Operational Considerations Liquid Effluent Description

7

  • 5.4.1 Exposure Pathways

- The nearest present and known future locations from which an individual can be exposed to effluents

  • 5.4.2 Doses to Members of the Public

- Maximum individual & 80 km collective

  • 5.4.3 Impacts to Members of the Public

- Compare doses to 10 CFR 50, Appendix I design objectives

- Compare all-pathway doses to 10 CFR 20, Subpart D

- Evaluate collective dose for the 80 km population Turkey Point Units 6 & 7 Operational Considerations ESRP Considerations

8

  • Effluent Concentration (10 CFR 20 Compliance)

- FPL anticipates concentrations within DCD Table 11.2-8, which conform to effluent concentration limits (ECLs) in 10 CFR 20, Appendix B

- Demonstrate ECL compliance onsite before well injection Turkey Point Units 6 & 7 Operational Considerations Liquid Effluent Constraints

9

- No existing or reasonably foreseeable exposure pathways affected by Monitor Tank releases have been identified by FPL

- Accordingly, FPL anticipates an Appendix I evaluation on the basis of zero dose deliverable to individuals and population would be appropriate Turkey Point Units 6 & 7 Operational Considerations Liquid Effluent Constraints