_5 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 11, 2004
- ~
I i
' i U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.:
NL&OSIMM Docket Nos.:
License Nos.:
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION 'UNITS I AND 2 -
NORTH ANNA POWER STATION' UNITS' 'AND 2-. !I;.
OPEIATIONAL-QUALITYASSURANCE PROGRAM l
INSPECTION PROGRAM CHANGES AND CLARIFICATIONS WITHDRAWAL OF CHANGE REQUEST 04-475 50-280/281 50-338/339 DPR-32/37-NPF-4/7 I,.
I I
In a letter (Serial No.02-735) dated February 27, 2003, Virginia Electric and Power Company (Dominion) submitted a revision to the Operational Quality Assurance Program (Topical lReportJr NRC-viewand.approvaLThsWas supplemented in a egt Serial No.03-574) dated January 9, 2004, in response to a request for additional information. Subsequently, in a telephone conversation on May 18, 2004, the NRC identified concerns with the proposed change. Specifically, the NRC stated the issue of reduced holdpoints was a complicated review and that there was presently insufficient information to reach a determination of reasonable assurance using a deterministic approach.
Given the NRC-concems. and Dominion's intention to transition the Topical Report to ANSI/ASME NQA-1.994 in the'nea'rermit is not prudent to continue activities in support of this proposed change. Therefore, Dominion hereby withdraws the proposed change request.
Should you have any questions, please contact Mr. Dave Sommers at (804) 273-2823.'
very truly yours,
!,.'I, I'.
.E. S. Grecheck Vice President - Nuclear Support Services i
Commitments made in this letter None aff-
SN 04-475 Docket Nos. 50-280/281 50-338/339 Withdrawal of Change Request Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St. SW, Suite 23T85 Atlanta, Georgia 30303-8931 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. N. P. Garrett NRC Senior Resident Inspector Suny Power Station Mr. M. T. Widmann NRC Senior Resident Inspector North-Anna Power Station-Mr. Jackson E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Boulevard Suite 300 Glen Allen, VA 23060