Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20012B114 + (Forwards Rev to Previous Guidance Re Procedures Generation Package Sers,Changing Terminology)
- ML20236D728 + (Forwards Rev to Proposed Amend 12 to DUKE-1-A, Topical Rept:Qa Program. Rev Clarifies Response Timeframe to Audit Repts.Rev Also Reflect Position Titles for QA Organization at Operating Stations)
- ML20078J617 + (Forwards Rev to Proposed Amend to License NPF-29 Re Conversion to TS Based on NUREG-1434,per NRC Request)
- ML20147B725 + (Forwards Rev to Proposed Append a to Lic SNM-960 & Rev Addendum a of Safety Demonstration Which Reflects Personnel Changes)
- NLS8900045, Forwards Rev to Proposed Change 31 to Tech Specs Containment Purge & Vent Valves.Proposed Change Incorporates All Amends to License DPR-46 Through Amend 126 + (Forwards Rev to Proposed Change 31 to Tech Specs Containment Purge & Vent Valves.Proposed Change Incorporates All Amends to License DPR-46 Through Amend 126)
- ML20237C076 + (Forwards Rev to Proposed Change for FSAR Page 15.4.7 & Listing of FSAR Chapter 15 Accidents to Suppl Util 870722 Tech Spec Changes to Support Deletion of Resistance Temp Detector Bypass Manifold Sys)
- ML20086K430 + (Forwards Rev to Proposed Change to Plant TSs Re DG Enhancements.Rev Moves TS in More Conservative Direction)
- IA-84-942, Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl + (Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl)
- ML20126E065 + (Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl)
- ML20028F769 + (Forwards Rev to Proposed Draft Policy Statement Re Camera Coverage,Incorporating Comments on 771212 Draft Statement. Presence of Representative from Ofc of Public Affairs During Coverage Recommended)
- ML20059H947 + (Forwards Rev to Proposed Physical Security Plan,Per .Encl Withheld (Ref 10CFR73.21))
- ML20100C479 + (Forwards Rev to Proposed Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- NRC-94-0055, Forwards Rev to Proposed QA Program Change for Audit Program,Per 930913 Application for Amend to License NPF-43, Relocating Audit Program Frequency Requirements from TS Into QA Program + (Forwards Rev to Proposed QA Program Change for Audit Program,Per 930913 Application for Amend to License NPF-43, Relocating Audit Program Frequency Requirements from TS Into QA Program)
- ML20236V183 + (Forwards Rev to Proposed Rules 10CFR30,40 & 70 for Publication.Action Extends to Region II Ofc Licensing Authority to Include Us Navy Licensing Activities.Rule Takes Effect on 871201)
- ML20235J016 + (Forwards Rev to Proposed Tech Spec 3.7.A.4.6 of 861029 Application for Amend to License DPR-44,expediting Testing of drywell-suppression Pool Vacuum Breaker Following Not Fully Seated Indication,Per NRC 870428 Request)
- ML18052A957 + (Forwards Rev to Proposed Tech Specs Re Containment Air Cooler Design,Per NRC Determination That Spec Did Not Reflect Ongoing Evaluation That All Critical Svc Water Components Can Perform Functions w/80 F Svc Water Temp)
- ML18052A959 + (Forwards Rev to Proposed Tech Specs Re Containment Air Cooler Design,Per NRC Determination That Spec Did Not Reflect Ongoing Evaluation That All Critical Svc Water Components Can Perform Functions w/80 F Svc Water Temp)
- ML19256A293 + (Forwards Rev to Pump & Valve Testing Prog Which Suppl .Rev Are Based on Further Review of ASME Section XI Requirements)
- ML20202E893 + (Forwards Rev to Q430.17 Documenting Development of Procedures for Manual Actions & Settlement Time Associated W/Filling of Diesel Fuel Oil Storage Tanks,Per SER Confirmatory Item 37.Rev Will Be Added to Next FSAR Amend)
- ML20117K884 + (Forwards Rev to QA Program Re Use of Qualified Reviewer to Perform Certain Functions Proeviously Performed by Plant Review Board)
- ML20117K808 + (Forwards Rev to QA Program Requirements Operation)
- PY-CEI-NRR-0320, Forwards Rev to Question 430.11 & Proposed SER Change Reflecting Current Design for Emergency Lighting.Preliminary Detailed Listing of Emergency 8 H Battery Pack Locations to Be Incorporated Into FSAR Also Encl + (Forwards Rev to Question 430.11 & Proposed SER Change Reflecting Current Design for Emergency Lighting.Preliminary Detailed Listing of Emergency 8 H Battery Pack Locations to Be Incorporated Into FSAR Also Encl)
- ML20059B057 + (Forwards Rev to RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers,Per 10CFR50.54(f) for Plant)
- ML20214V895 + (Forwards Rev to RO 50-20/1986-2,correcting Typos)
- ML20198J114 + (Forwards Rev to Radioactive Effluent Release Data for 1984, Per 860422 Request for Review.Rept Data Only Covers Last Half 1984)
- ML20197D802 + (Forwards Rev to Radiological Contingency Plan)
- ML20202J690 + (Forwards Rev to Radiological Er Plan & Revised Implementing Procedures.Attachment 1 Provides Summary of Changes to EP & Attachment 2 Provides List of Procedures Which Were Revised or Deleted)
- ML20005D814 + (Forwards Rev to Reactor Security Plan,Reflecting Previously Approved Change in Status of License to Possession Only & Amend Submittal of 880727,requesting Approval for Reduction in Reactor Facility Boundary.Encl Withheld)
- ML20085F702 + (Forwards Rev to Reed Reactor Facility Emergency Plan & Eip,In Response to NRC Comments on Rev Licensee Submitted Last Yr)
- ML20073J364 + (Forwards Rev to Reed Reactor Facility Emergency Plan & Emergency Implementation Procedures)
- ML20134K432 + (Forwards Rev to Reed Reactor Facility Requalification Plan Which Explains Change,Paragraph by Paragraph.Rev Changes Requalification Cycle from One Yr Cycle to Two Yr Cycle IAW 10CFR55.59)
- ML20134K434 + (Forwards Rev to Reed Reactor Facility Requalification Plan Which Explains Change,Paragraph by Paragraph.Rev Changes Requalification Cycle from One Yr Cycle to Two Yr Cycle IAW 10CFR55.59)
- ML20134M271 + (Forwards Rev to Reed Reactor Security Plan Including Physical Changes to Facility,Adding Restroom & Stairs to Temporary Controlled Access & Changing Sequence of Calling in Response to Alarm.Encl Withheld)
- ML20237J228 + (Forwards Rev to Refueling Info Page of Monthly Operating Rept for June 1987,correcting Error in Stated Discharge Capacity Availability of Spent Fuel Pool.Discharge Will Be Available Until 1994,not 1990)
- ML20211K800 + (Forwards Rev to Region I Instruction 1200.10, Processing Allegations & Complaints & Interim EDO Guidance on Allegations.Salient Points of Instruction Highlighted)
- ML20236X939 + (Forwards Rev to Regional Procedure 0514A, Plant-Specific Backfit, in Response to Inquiry Re How Region III Implemented Reporting Requirements in V Stello 870224 Memo on Safety Goal Implementation.Rev Issued on 870624)
- ML20059E276 + (Forwards Rev to Regulatory Agenda for Procedures & Criteria for On-site Storage of LLW, in Response to Knapp 931222 Memo)
- ML20065D374 + (Forwards Rev to Relief Request 10-VRR-2 Re RHR stay-fill Supply Check Valves,Per)
- ML17313A903 + (Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection)
- ML20101M900 + (Forwards Rev to Relief Request 40-VRR-2 for Plant First Ten Yr Interval Pump & Value IST Program)
- ML20117J385 + (Forwards Rev to Relief Request EN-02 of Rev 15 of Callaway Plant Pump & Valve Inservice Test Program)
- 2CAN059507, Forwards Rev to Relief Request PR-5 Re Second Interval IST Program for ANO-2 + (Forwards Rev to Relief Request PR-5 Re Second Interval IST Program for ANO-2)
- ML20116L554 + (Forwards Rev to Relief Request from Requirements of ASME Boiler & Pressure Vessel Section 11 Code)
- ML20236W392 + (Forwards Rev to Rept Submitted Under 10CFR50.46, Acceptance Criteria for ECCS for Light-Water Nuclear Power Reactors. Total Peaking Factor & Nuclear Enthalpy Rise Hot Channel Corrected.Encl Page Replaces Page 8 of 980423 Submittal)
- ML20148N969 + (Forwards Rev to Rept in Which an Estimate of Pub Exposure Reduction Assoc W/Permanent Entombment as Compared W/Immediate Dismantling Was in Error)
- ML20134E593 + (Forwards Rev to Request for Relief 29 & Request for Relief 66 from ASME Boiler & Pressure Vessel Code,Section XI Re Inservice Insp for First 10-yr Interval.Review Requested Prior to 10-yr Outage Scheduled for 850905.Fee Paid)
- ML20154S096 + (Forwards Rev to Request for Relief Re Inservice Insp 8.Rev Includes List of Unit 2 Piping Welds W/Limitation on Ultrasonic Volumetric Exam & Examined for ASME Section XI Credit During First 10-yr Interval)
- ML20202F721 + (Forwards Rev to Request for Update of TS Which Was Submitted on 971222.Rev Is Result of Several Telcons W/T Michaels & Is Submitted for Approval)
- ML20203F717 + (Forwards Rev to Requested Change to Plant FSAR QA Program Description,For NRC Review & Approval)
- ML20116N485 + (Forwards Rev to Response to Deviations Noted in Insp Rept 50-354/92-80 Re EDG Fuel Oil Storage Tank Capacity & Fuel Oil Transfer Pump Start Level.Requests Relief from SRP Section 9.5.4 Per Updated FSAR)
- LIC-89-1206, Forwards Rev to Response to Deviations Noted in Insp Rept 50-285/89-09.Corrective Action:Water Curtains Currently Installed to Protect Doorway Opening from Fan Room Into Turbine Bldg + (Forwards Rev to Response to Deviations Noted in Insp Rept 50-285/89-09.Corrective Action:Water Curtains Currently Installed to Protect Doorway Opening from Fan Room Into Turbine Bldg)