Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Rev to Radiological Contingency Plan". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20197D802  + (Forwards Rev to Radiological Contingency Plan)
  • ML20202J690  + (Forwards Rev to Radiological Er Plan & Revised Implementing Procedures.Attachment 1 Provides Summary of Changes to EP & Attachment 2 Provides List of Procedures Which Were Revised or Deleted)
  • ML20005D814  + (Forwards Rev to Reactor Security Plan,Reflecting Previously Approved Change in Status of License to Possession Only & Amend Submittal of 880727,requesting Approval for Reduction in Reactor Facility Boundary.Encl Withheld)
  • ML20085F702  + (Forwards Rev to Reed Reactor Facility Emergency Plan & Eip,In Response to NRC Comments on Rev Licensee Submitted Last Yr)
  • ML20073J364  + (Forwards Rev to Reed Reactor Facility Emergency Plan & Emergency Implementation Procedures)
  • ML20134K432  + (Forwards Rev to Reed Reactor Facility Requalification Plan Which Explains Change,Paragraph by Paragraph.Rev Changes Requalification Cycle from One Yr Cycle to Two Yr Cycle IAW 10CFR55.59)
  • ML20134K434  + (Forwards Rev to Reed Reactor Facility Requalification Plan Which Explains Change,Paragraph by Paragraph.Rev Changes Requalification Cycle from One Yr Cycle to Two Yr Cycle IAW 10CFR55.59)
  • ML20134M271  + (Forwards Rev to Reed Reactor Security Plan Including Physical Changes to Facility,Adding Restroom & Stairs to Temporary Controlled Access & Changing Sequence of Calling in Response to Alarm.Encl Withheld)
  • ML20237J228  + (Forwards Rev to Refueling Info Page of Monthly Operating Rept for June 1987,correcting Error in Stated Discharge Capacity Availability of Spent Fuel Pool.Discharge Will Be Available Until 1994,not 1990)
  • ML20211K800  + (Forwards Rev to Region I Instruction 1200.10, Processing Allegations & Complaints & Interim EDO Guidance on Allegations.Salient Points of Instruction Highlighted)
  • ML20236X939  + (Forwards Rev to Regional Procedure 0514A, Plant-Specific Backfit, in Response to Inquiry Re How Region III Implemented Reporting Requirements in V Stello 870224 Memo on Safety Goal Implementation.Rev Issued on 870624)
  • ML20059E276  + (Forwards Rev to Regulatory Agenda for Procedures & Criteria for On-site Storage of LLW, in Response to Knapp 931222 Memo)
  • ML20065D374  + (Forwards Rev to Relief Request 10-VRR-2 Re RHR stay-fill Supply Check Valves,Per)
  • ML17313A903  + (Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection)
  • ML20101M900  + (Forwards Rev to Relief Request 40-VRR-2 for Plant First Ten Yr Interval Pump & Value IST Program)
  • ML20117J385  + (Forwards Rev to Relief Request EN-02 of Rev 15 of Callaway Plant Pump & Valve Inservice Test Program)
  • 2CAN059507, Forwards Rev to Relief Request PR-5 Re Second Interval IST Program for ANO-2  + (Forwards Rev to Relief Request PR-5 Re Second Interval IST Program for ANO-2)
  • ML20116L554  + (Forwards Rev to Relief Request from Requirements of ASME Boiler & Pressure Vessel Section 11 Code)
  • ML20236W392  + (Forwards Rev to Rept Submitted Under 10CFR50.46, Acceptance Criteria for ECCS for Light-Water Nuclear Power Reactors. Total Peaking Factor & Nuclear Enthalpy Rise Hot Channel Corrected.Encl Page Replaces Page 8 of 980423 Submittal)
  • ML20148N969  + (Forwards Rev to Rept in Which an Estimate of Pub Exposure Reduction Assoc W/Permanent Entombment as Compared W/Immediate Dismantling Was in Error)
  • ML20134E593  + (Forwards Rev to Request for Relief 29 & Request for Relief 66 from ASME Boiler & Pressure Vessel Code,Section XI Re Inservice Insp for First 10-yr Interval.Review Requested Prior to 10-yr Outage Scheduled for 850905.Fee Paid)
  • ML20154S096  + (Forwards Rev to Request for Relief Re Inservice Insp 8.Rev Includes List of Unit 2 Piping Welds W/Limitation on Ultrasonic Volumetric Exam & Examined for ASME Section XI Credit During First 10-yr Interval)
  • ML20202F721  + (Forwards Rev to Request for Update of TS Which Was Submitted on 971222.Rev Is Result of Several Telcons W/T Michaels & Is Submitted for Approval)
  • ML20203F717  + (Forwards Rev to Requested Change to Plant FSAR QA Program Description,For NRC Review & Approval)
  • ML20116N485  + (Forwards Rev to Response to Deviations Noted in Insp Rept 50-354/92-80 Re EDG Fuel Oil Storage Tank Capacity & Fuel Oil Transfer Pump Start Level.Requests Relief from SRP Section 9.5.4 Per Updated FSAR)
  • LIC-89-1206, Forwards Rev to Response to Deviations Noted in Insp Rept 50-285/89-09.Corrective Action:Water Curtains Currently Installed to Protect Doorway Opening from Fan Room Into Turbine Bldg  + (Forwards Rev to Response to Deviations Noted in Insp Rept 50-285/89-09.Corrective Action:Water Curtains Currently Installed to Protect Doorway Opening from Fan Room Into Turbine Bldg)