Text
e
- ~ENTERGY l"TM"*"=' '"*'
Dn C tr. Mb JDEO
's 00143.'?300
)
C. R. Hutchinson November 10, 1994
- [~
a m men u,,
U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555 Attention:
Document Control Desk
Subject:
Grand Gulf. Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Conversion to Technical Specifications based on NUREG 1434
" Improved Technical Specifications Revision 0" Proposed Amendment to the Operating License (PCOL-93/11 Revision 2)
Reference:
1)
GNRO-93/03109, Conversion to Technical Specifications based on NUREG 1434 " Improved Technical Specifications Revision 0" Proposed Amendment to the Operating License (PCOL-93/11), dated October 15,1993.
2)
GNRO-94/00056, Conversion to Technical Specifications based on
(
NUREG 1434 " improved Technical Specifications Revision 0" Proposed Amendment to the Operating License (PCOL-93/11 Revision 1), dated April 15,1994.
)
GNRO-94/00130 Gentlemen:
Entergy Operations, Inc. by this letter is submitting a revision to the proposed amendment to the Grand Gulf Nuclear Station (GGNS) Operating License submitted via References 1 and 2.
This submittal represents a major milestone in the conversion to the improved Technical Specifications for GGNS and for the combined BWR-6 cooperative effort. We wish to take this opportunity to recognize the Staff's efforts in meeting the joint goals set forth early in the conversion project. The BWR-6 cooperative effort represented an opportunity for both the licensees and the Staff to realize significant resource savings by combining the reviews of thase four plants. During the joint review, over eleven hundred items were identified and successfully resolved through the combined efforts of the Staff and the licensees. All of those involved worked diligently to address each of these items demonstrating both a professional attitude and a commitment to safety. of this letter provides the revised pages of the previous submittals to document the resolution of items as agreed to during the meetings with the Staff. Where
~$.I.00.QR s
9411210376 941110 I
l l
l PDR ADOCK 05000416
./
P PDR pf/./
hs}/j
(i l
November 10, 1994 g
GNRO-94/00130 J
Page 2 of 3 9
required the bases for Entergy Operations, Inc. determination that the proposed amendment involves no significant hazards conciderations based on the guidelines presented in 10CFR50.92is provided, otherwise the previous basis provided in References 1 and 2 applies. Also enclosed for your information is a complete copy of the typed proposed Technical Specifications.
Requirements relocated from the Technical Specifications to licensee control will be included in the Updated Final Safety Analysis Report (UFSAR) or Technical Specification bases, as appropriate, and as a result will be controlled by the requirements of 10 CFR 50.59. Except that the requirements currently contained in Technical Specifications 6.5 and 6.10 will be controlled by the change controls of 10 CFR 50.54 instead of 10 CFR 50.59. These change controls will be applied from the time the requirements are transferred to licensee control by implementation of this license amendment.
Entergy plans to implement the Improved Technical Specifications at GGNS approximately 30 days before our seventh refueling outage. Therefore, we request that this change receive review priority to support its approval by February 1995.
In accordance with the provisions of 10 CFR 50.4, the signed original of the requested amendment is enclosed and, in accordance with 10 CFR 50.30, an Oath or Affirmation relating to the requested changes to the Operating License is enclosed. This amendment request has been reviewed and accepted by the Plant Safety Review Committee and the Safety Review Committee.
Yours truly l
/? b
/>
~
84 Hutchinson Vice President, Operations GGNS
\\BSF
Enclosures:
- 1. Affirmation per 10CFR50.30(1 page)
- 2. GGNS PCCL-93/11 revision 2 Chapter 1 (9 pages)
Chapter 2 (8 pages)
Section 3.0 (11 pages)
Section 3.1 (47 pages)
Section 3.2 (6 pages)
Section 3.3 (154 pages)
Section 3.4 (81 pages)
Section 3.5 (11 pages)
Section 3.6 (100 pages)
Section 3.7 (16 pages)
Section 3.8 (79 pages)
J
November 10, 1994 GNRO-94/00130 Page 3 of 3
Enclosures:
- 2. (continued)
Section 3.9 (12 pages)
I Section 3.10 (18 pages)
Chapter 4 (16 pages)
Chapter 5 (44 pages)
- 3. Retyped LCOs (374 pages)
- 4. Retyped Bases (721 pages) cc:
Mr. H. W. Keiser (w/o)
Mr. R. B. McGehee (w/o)
Mr. N. S. Reynolds (w/o)
Mr. J. E. Tedrow (w/a)
Mr. H. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager (w/2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 Mr. C. S. Schulten (w/2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 11E22 Washington, D.C. 20555 Dr. Eddie F. Thompson (w/a)
State Health Officer State Board of Health P.O. Box 1700 Jackson, Mississippi 39205 s
_ _ _ _ - to GNRO-94/00130 Page 1 of 1 BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE NO. NPF-29 DOCKET NO. 50-416 IN THE MATTER OF MISSISSIPPI POWER & LIGHT COMPANY and SYSTEM ENERGY RESOURCES, INC.
and SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION and ENTERGY OPERATIONS, INC.
AFFIRMATION 1, C. R. Hutchinson, being duly sworn, state that I am Vice President, Operations GGNS of Entergy Operations, Inc.; that on behalf of Entergy Operations, Inc., System Energy Resources, Inc., and South Mississippi Electric Power Association I am authorized by Entergy Operations, Inc.
to sign and file with the Nuclear Regulatory Commission, this application for amendment of the Operating License of the Grand Gulf Nuclear Station; that I signed this application as Vice President, Operations GGNS of Entergy Operations, Inc.; and that the sta ements made and the matters set forth therein are true and correct to. he best y kn I
, information and belief.
/
e V
C. R. Hutchinson STATE OF MISSISSIPPI COUNTY OF CLAIBORNE SUBSCRIBED AND SWORN TO before rne, a Notary Public, in and for the County and State above named, this
/8
- day of av/M(
.1994.
(SEAL)
//
/
(/D~~ q,,
xhC Notary Public Es s $[Id((rIhYPUsuc brY c0MMIS$10N EXP32S JUNE 5.1973 DONDED 'DGtU 61tCML NOTMtY SERYiCE i
Chapter 1 Pags 1 GRAND GULF CHAPTER 1 ATTACHMENT 1: NOT USED ATTACHMENT 2: ITS - PSTS COMPARISON DOCUMENT
1 ATTACHMENT 2 ITS - PSTS COMPARISION DOCUMENT REVISION 2 CHAPTER 1 REVISED PAGES 2A: MARKUP OF ITS 2B: NOT USED
I ATTACHMENT 2A ITS - PSTS COMPARISION DOCUMENT REVISION 2 MARKUP OF ITS
- - _ - - -