Forwards Rev to Q430.17 Documenting Development of Procedures for Manual Actions & Settlement Time Associated W/Filling of Diesel Fuel Oil Storage Tanks,Per SER Confirmatory Item 37.Rev Will Be Added to Next FSAR Amend
ML20202E893
Person / Time
Site: Vogtle  
Issue date: 04/03/1986
From: Bailey J
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
GN-857, NUDOCS 8604140068
Download: ML20202E893 (2)


Text

<

Georgia Power Company e

Route 2, Box 299A as~

Waynesboro, Georgia 30830 Telephone 404 554 9961 404 724-8114 Soutnern Company Services, Inc_

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 8704011 Vogtle Proj.ect April 3, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:

Mr. B. J. Youngblood Log:

GN-857 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.

20555 ERC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 37: PROCEDURES FOR ORDERING DIESEL FUEL OIL

Dear Mr. Denton:

In the Vm P FSAR Amendment 22 the response to Q430.18 was revised to document the development of procedures for ordering diesel fuel oil. Attached is a revision to Q430.17 that documents the development of procedures for manual actions and settlement time associated with the filling of the diesel fuel oil storage tanks. This revision will be incorporated in the next FSAR amendment.

If your staff requires any additional information, please do not hesitate to contact me.

Sincerely, i

}

I l

A. Bailey Project Licensing Manager JAB /sm Attachment xc:

R. E. Conway G. Bockhold, Jr.

R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. C. Teper B. W. Churchill, Esquire W. C. Ramsey M. A. Miller (2)

L. T. Cucwa B. Jones, Esquire Vogtle Project File 0415V

[DR ADOCK 05000424 -

I

' I B604140068 860403 PDR

O o

VEGP-FSAR-Q l

fuel oil transfer pump and the day tank.

These strainers and filters, combined with minimal turbulence during storage tank fill, allow realignment of the diesel engines to their respective day tanks without any need for fuel oil settling time.

The sediment and any water which has been collected in the tank can be drained using a 3-in. drain provided on the individual storage tanks.

13 The suitch.ing to a full fuel oil storage tank and the filling of a near-empty fuel oil storage tan]5,is fully described in paragraph 9.5.4.2.1.1 A 4 (Approximately 20%)

f With the above provisions for ensuring that clean fuel oil is idelivered to the diesel engines, the postulated interruption of

! diesel generator operation is not anticipated.

,In addition, plant procedures have been developed and implemented which assure that all manual actions necessary to receive fuel oil have been accomplished and that a settlement time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is provided in the filled tank.

9J O

O 3

Amend. 7 5/84 Q430.17-2 Amend. 13 1/85 5 13

.