ML20117K884

From kanterella
Jump to navigation Jump to search
Forwards Rev to QA Program Re Use of Qualified Reviewer to Perform Certain Functions Proeviously Performed by Plant Review Board
ML20117K884
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/04/1996
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117K890 List:
References
HL-5233, NUDOCS 9609120216
Download: ML20117K884 (2)


Text

l l

(

Georgia Power Company e'

40 lnverness Center Parkway

,j i

Post Office Box 1295 Dirrnirigham, Alabama 35201 Telephone 205 877 7279 hice"hresdenIbcfear 0%OM Hatch Project te souvem enctnc systern l

September 4, 1996 I

Docket Nos. 50-321 HL-5233 50-366 5

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk i

Washington, D.C. 20555 i

Edwin I. Hatch Nuclear Plant Revision to Ouality Assurance Program l

Gentlemen:

By letter dated June 12,1996, Georgia Power Company (GPC) submitted to the NRC a proposal for revision to the Plant Hatch Quality Assurance (QA) Program which l

incorporated the use of a Qualified Reviewer (QR) to perform certain functions previously -

6 performed by the Plant Review Board (PRB). Specifically, the requested change would allow the QR to review and disposition screening evaluations for 10 CFR 50.59 l

applicability for which a subsequent 10 CFR 50.59 evaluation was not required. Such a review and disposition by the QR would be done in lieu of the previous practice of PRB review of such documents.

In response to GPC's submittal, the NRC, by letter dated August 5,1996, provided several comments to the proposal and indicated that GPC must submit a revised QA Program change submittal addressing said comments prior to further NRC review. The

~

GPC response to the staffs comments are provided in Enclosure 1. As requested, a justification for the proposed change and a revised QA Program change submittal are included in Enclosures 2 and 3, respectively.

Should you have any questions in this regard, please contact this oflice.

Sincerely, th>

. ) (ll_ _&-

J. T. Beckham, Jr.' 4 i-SMS/eb bO

!/

Enclosures:

(See next page.)

9609120216 960904 G

PDR ADOCK 05000321 P

PDR

'GeorgiaPower d

(

U. S. Nuclear Regulatory Commission Page 2 September 4, 1996

Enclosures:

1. Response to NRC Comments Concerning the E. I. Hatch Quality Assurance Program Change Submittal
2. Description of and Justification for Proposed Changes to QA Program
3. Revised Quality Assurance Program Change Submittal with Corresponding Marked-Up FSAR Pages l

cc:

Georeia Power Company l

Mr. H. L. Sumner, Nuclear Plant General Manager NORMS U.S. Nuclear Reentatory Commission. Washineton. D.C.

Mr. K. Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Reentatorv Commission. Region 11 Mr. S. D. Ebneter, Regional Administrator Mr. B. L. Holbrook, Senior Resident Inspector - Hatch I

l 1

HL-5233 l