Forwards Rev to Requested Change to Plant FSAR QA Program Description,For NRC Review & Approval
ML20203F717
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/23/1998
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9803020029
Download: ML20203F717 (3)


Text

- - _ . _ _ _ _ _ _ - _ - _ _ _ _ _ - _ - _ - _ _ _______ - -_

  • A

'. Dave Morey Vee hesident

' S;uthern Nuclear Operating Company f arley Project PO Eox1295

  • _ Birmingham. Alabama 35201 Tel 205 932.5131 February 23, 1998 SOUTHERN h COMPANY Energy to Sme Your World" Docket Nos.: 50 348 10 CFR 50.54(a)(3) 50 364 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Final Safety Analysis Report Revision to Quality Assurance Program Changes

-Ingrumentatig.n. Calibration Labeli.n.g Ladies and Gentlemen:

By letter dated November 18,1997, SNC submitted a request for a change to the Quality Assurance Pro;am pursuant to 10CFR50.54(a). On January 12,1998, the staffinformed Farley personnel sia telephone (Zinunerman to Carmack) that changes to the Final Safety Analysis Report (FSAR) mark-up '

page would be needed prior to approval and that the 60 day review period was to be extended to allow the changes to be submitted. A letter dated Janua > 16,1998 (Zimmerman to Morey) extended the .

initial 60 day NRC review period.

Attached is a revision to the requested change to the Farley Nuclear Plant (FNP) FSAR Quality Assurance (QA) Program Description for your review and approval. 'Ihe 50.54 (a)(3) evaluation has not been changed from the original transmitted by letter dated November 18,1997, therefore, it is not resubmitted.

If there are any questions, please advise.

Respectfully submitted,

!0 ])}

Dave Morey $

EWC/maf:calstktl. doc Attachments: 1. Mark-Up FSAR page Oh !]

cc: Mr. L. A. Reyes, Region 11 Administrator Mr. J.1. Zimm nnan, NRR Project Manager Mr. T. M. Ross, Plant Sr. Resident inspector 9803020029 900223 lk..lll.'ll ' llll PDR ADOCK 05000348 - * *t ,.

P PDR I

l ATI'ACllMENT I FSAR Mark-Up Page

~

FNP-FSAR-17 Results of safety-related tests will identify the test bita, data recorder, acceptability, and/or any deficiencios noted. Any noted deficiencies will be resolved with such actions documented and included with original test results.

operations activities involved with the installation, inspection, and testing of instrumentation, electrical equipment, mechanical equipment, and systems will be accomplished in accordance with Regulatory Guide 1.30, dated August 11, 1 9'< 2 , Quality Assurance Requirements Instrumentationforand the Electrical Installation,ipmentInspection, Equ (endorses andANSI Testing of N45.2.4-1972),

and with. ANSI N45.2.8 (1974), Supplementary Quality assurance a Requirements or Installation, Inspection and Testing of Mechanical Equipment and Systems for the Construction Phase of Nuclear Power Plants. With the exceptions listed below, Southern Nuclear Operating Company complies with Regulatory Guide 1.30 as addressed in FSAR, section 17.2. Exception is taken to ANSI N45.2.4 (1972)

" Installation, Inspection, and Testing Requirements for lustrumentation and Electric Equipment During the Construction Phase of Nuclear Power GeLerating Stations", section 6.2.1, which states, in part: " Items requiring calibration shall be tagged or labeled on completion indicating date of calibration and identity of person that performed the calibration." Installed process instruments at Plant Farley are identified by unique instrument numbers which are readable at the instrumont. These instrument numbers are traceable to calibration schedules and records. These calibration schedules or

records contain the same information as required by ANSI N45.2.4 (1972). These schedules or records are readily accessible to personnel who are required to check calibration status as required by governing procedures. These instruments are not tagged or labeled with calibration data. Listed below is a cross-reference between sections of these standards and ti.e FSAR subsections thaP discuss compliance with thesc requirements:

ANSI N45.2.4 Section FSAR Subsection 1.1 NA 1.2 NA 1.3 13.5.3, 17.2.1 (APC PGS Department) 1.4 NA 1.5 NA 2.1 13.5.3 2.2 17.2.2, 17.2.3 2.3 17.2.13, 17.2.1 (APC PGS Department) 2.4 17.2.10, 17.2.11 2.5 17.2.12 2.6 17.2.16 3 17.2.7, 17.2.S, 17.2.10, 17.2.13 4 17.2.10, 17.2.11 5.1 13.5.3, 17.2.10, 17.2.13 5.2 17.2.11 17.2-27 REV i