Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3P83-2399, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept + (Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept)
- ML18139B806 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Types A,B & C)
- ML20211H104 + (Forwards Reactor Containment Bldg Integrated Leakage Rate Test for Byron Unit 2,Preoperational Test on 860702-18. Rept Describes Initial Type a Containment Leakage Rate Test & Related Activities)
- JAFP-82-0546, Forwards Reactor Containment Bldg Integrated Leak Rate Test Type A,B & C Periodic Tests for May 1980-Feb 1982 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Type A,B & C Periodic Tests for May 1980-Feb 1982)
- ML17213B092 + (Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept,Per App J Requirements)
- L-83-116, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept,Per App J Requirements + (Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept,Per App J Requirements)
- ML20011E713 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Quad Cities Nuclear Power Station,Unit 1,891114-15. Next Type a Test Scheduled for Fall 1990)
- ML20011E714 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Quad Cities Nuclear Power Station,Unit 1,891114-15. Next Type a Test Scheduled for Fall 1990)
- ML20100F592 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Types A,B & C, Per 10CFR50,App J)
- ML20196J799 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test. Next Type a Test for Unit Scheduled for Summer 1989)
- ML20084F691 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, Dtd 840209-10,submitted Per 10CFR50,App J,Section V.B.3 Requirements)
- ML20092H218 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test (910912-1116))
- ML20081H872 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Browns Ferry Nuclear Plant Unit 2 Conducted on 910317-18. Test Performed to Demonstrate Continuing leak-tight Integrity of Reactor Bldg Primary Containment)
- ML20112F088 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Oyster Creek,1984. Rept Contains Methodology Used to Perform Primary Containment Type a Test of 24 H Duration. Type B & C Local Leak Rate Test Results Also Encl)
- ML18057A922 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Feb 1991 Special Rept. Conditions Met Containment Leakage Requirements)
- ML18057A923 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Feb 1991 Special Rept. Conditions Met Containment Leakage Requirements)
- ML18141A055 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Type A,B & C Periodic Test, Per 10CFR50,App J)
- ML18141A056 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Type A,B & C Periodic Test, Per 10CFR50,App J)
- ML20207J461 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, Performed on 860503-05.Test Witnessed by NRC & Discussed in 860520 Insp Rept 50-324/86-14)
- ML20128C696 + (Forwards Reactor Containment Bldg Integrated Leakage Test, Types A,B & C Periodic Test.)
- ML20211R054 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, Final Rept & Reactor Containment Bldg as Found Condition. Test Repts Contain Analysis & Interpretation of Type a Test Results)
- ML18139B579 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Type A,B & C Surveillance Test)
- ML17342A594 + (Forwards Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test,Turkey Point Plant Unit 4.)
- ML20141N875 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Final Rept, Per 10CFR50,App J.Both Measured Leak Rate Test & Supplemental Verification Test Met Tech Spec Acceptance Criteria)
- ML20141N876 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Final Rept, Per 10CFR50,App J.Both Measured Leak Rate Test & Supplemental Verification Test Met Tech Spec Acceptance Criteria)
- ML17324A572 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2)
- ML17324A575 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2)
- ML20236H723 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, Per 10CFR50,Appendix J.Finding Discussed in Insp Repts 50-324/87-15 & 50-325/87-15.Proposed Schedule for Future Integrated Leak Rate Test to Be Submitted Separately)
- ML20002C893 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, Performed in Sept 1980)
- ML20099H113 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test)
- ML20064E234 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test)
- ML20035H025 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test)
- ML19338G612 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test)
- ML19339B124 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test)
- ML19257A907 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test)
- L-79-214, Forwards Reactor Containment Bldg Integrated Leak Rate Test + (Forwards Reactor Containment Bldg Integrated Leak Rate Test)
- ML17305B697 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test)
- L-79-171, Forwards Reactor Containment Bldg Integrated Leak Rate Test Rept + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Rept)
- ML17338A781 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Rept.)
- ML19341C546 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Suppl 1)
- ML19341C547 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test Suppl 1.)
- ML19207A605 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test for May 1979)
- ML17319B046 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, 810430-0504)
- ML17319B047 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, 810430-0504)
- ML20078H224 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test, Jul 1983)
- ML20125A945 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,790425-0501)
- ML17334A413 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,810713-30)
- ML17326A954 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,810713-30.)
- ML20091M401 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,831223-25)
- ML20074A822 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Jan 1983)
- ML20004E135 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Mar 1981)
- ML20004E136 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Mar 1981.)
- ML20028B534 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Suppl 2)
- ML20028B535 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Suppl 2.)
- ML19246C015 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test,Type A,B & C)
- ML17305B698 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test.)
- ML17206A953 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test.)
- ML19257A908 + (Forwards Reactor Containment Bldg Integrated Leak Rate Test.)