_

Commonwealth Edison 1400 Opus Piace Oi .

v Downers Grove, Illinois 60515 l February 14,1992 Dr. Thomas E. Murley, Director Office Of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk

Subject:

Braldwood Station Unit 2 Reactor Containment Building Integrated Leak Rate Test NBG_RockeLNoJi0:457

Reference:

(a) December 7,1987 letter from S.C. Hunsader to T.E. Murley

Dear Dr. Murley:

Reference (a) provided the ter,hnical report of the Braidwood Unit 2 areoperational reactor containment building integrated leak rate test conducted 3etween September 6 and September 11,1987. Enclosed is the technical report of the k-Braldwood Unit 2 reactor containment building integrated leak rate test conducted between September 12 and Novembei 16,1991. This is being submitted pursuant to the requirements of 10 CFR 50, Apperdix J.Section V.

The enclosed report describes the type A containment leakage rate test conducted in accordance with the requirements of Aopendix J and through the 3erformance of 2BwVS 6.1.2.s.-1, " Unit 2 Primary Containment Type A Integrated

_eakage Rate Test (ILRT)".

Please direct any questions you muy have regarding this matter to this office.

Very truly yours,

~)d. D T.W. Simpkin Nuclear Licensing Administrator Attachment 1: Reactor Containment Building Integrated Leak Rate Test for Braldwood Unit 2 cc: R.M. Pulsifer-Project Manager, NRR S. Dupont-Senior Resident Inspector, BWD B. Clayton-Branch Chief, Rill 9202210062 PDR 920214 P ADOCK 05000457 ppg ARC /scl:lD767:32 Il1