ML20035H025
| ML20035H025 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 04/24/1993 |
| From: | Spedl G COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20035H026 | List: |
| References | |
| NUDOCS 9304300370 | |
| Download: ML20035H025 (1) | |
Text
.
O, 2601 is.21st. Rd.
Commonwesith Edison '
LaSa"g County Nuc> ear Station Marseilles. Illinois 61341 April 24, 1993 Telephone 815/357-6761 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn:
Document Control Desk
SUBJECT:
Reactor Containment Building Integrated Leak Rate Test LaSalle County Nuclear Power Station Docket No.
50-373, NPF-11, Unit 1 Enclosed please find the report ** Reactor Containment Building Integrated Leak Rate Test, LaSalle County Nuclear Power Station, Unit 1, January 14, 1993 and related appendices describing the Type A test.
This report is submitted to you in cecordance with the requirements of 10CFR50, Appendix J, Section V.B.I.
The information contained in Appendix A of this report is intended to comply with requirements of 10CFR50, Appendix J, Section V.B.3.
According to 10CFR50, Appendix J, Section III.D., the next Type A test is presently scheduled to be performed at the next refueling outage (Spring 1994), which happens to be the 10 year outage. Additional Correspondence with regards to the schedule of Type A testing will be provided under separate cover.
Very truly yours, L. ~
.Shedl e,,.
Station Manager LaSalle County Station WJS/MJO/cas
- Attach, cc: w/ attachment:
A.
B. Davis (U.S. NRC Region III)
F. Maura (U.S. NRC Region III)
D. Hills (LaSalle Senior NRC Inspector)
B. Siegel (NRC NRR Project Manager)
M. Wallace T. Hammerich M. B.
Depuydt J.
Glover File / Integrated Leak Test Station Managers:
Zion Dresden Byron Braidwood Qua Cities 300013 h (I 1
ZCADTS/468 9304300370 930424 PDR ADOCK 05000373 I j P
C
, ~ ' ~.. __
o
/
l
~._._'~
~ ~.
1 C
l
(
' ~~
C t
[
~..-
S$llga