ML20211R054
| ML20211R054 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/18/1986 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Muller D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20211R058 | List: |
| References | |
| 2809N, IEIN-85-071, IEIN-85-71, SL-947, NUDOCS 8607280087 | |
| Download: ML20211R054 (2) | |
Text
,
Georgia Fower Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526-6526 Mailing Address:
Pbst Office Box 4545 Atlanta, Georgia 30302 GeorgiaPower L T. Gucwa IN soutwo eac'nc system Manager Nuclear Safety and Licensing SL-947 2809N July 18,1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST REPORT - HATCH UNIT 1 FALL 1985 MAINTENANCE / REFUELING OUTAGE Gentlemen:
Pursuant to the requirements of 10 CFR 50, Appendix J, Section V.B.1, Georgia Power Company is submitting to the NRC a summary technical report entitled
" Reactor Containment Building Integrated Leak Rate Test" (Enclosure 1) for the "as left" integrated leak rate test which was conducted at Plant Hatch Unit 1 during the Fall 1985 maintenance / refueling outage.
Pursuant to the requirements of 10 CFR 50, Appendix J, Section V.B.3, leakage test results derived from Type A, B, and C tests are reported in the enclosed report.
The enclosed report contains an analysis and interpretation of the Type A tests results and a summary analysis of periodic Type B and Type C tests that were performed since the last Type A test which was conducted during the Fall 1982 maintenance / refueling outage.
Al so, enclosed for your information is a separate report entitled
" Reactor Containment Building
'As Found' Condition" (Enclosure 2), as addressed in NRC I&E Notice 85-71, " Containment Integrated Leak Rate Tests,"
issued on August 22, 1985.
8607280007 860718 h
7
==**g1 g
i il t
d GeorgiaPower d Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 July 18,1986 Page Two Ten copies of each of the reports are enclosed for your convenience.
If you have any questions in this regard, please contact this office at anytime.
Sincerely, Wf &
L. T. Gucwa JAE/mb Enclosure c(w): Georc ia Power Company U. S. Nuclear Regulatory Commission Mr. i. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr.
Senior Resident Inspector Mr. H. C. Nix, Jr.
GO-NORMS 2809N l
700775
- - ~
__,