ML20141N875

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leak Rate Test Final Rept, Per 10CFR50,App J.Both Measured Leak Rate Test & Supplemental Verification Test Met Tech Spec Acceptance Criteria
ML20141N875
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/11/1986
From: Morgan H
SOUTHERN CALIFORNIA EDISON CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20141N876 List:
References
NUDOCS 8603180233
Download: ML20141N875 (1)


Text

7._

a u.

f$5 Southem Califomia Edison Company SAN ONOFRE NUCLEAR GENERATING STATION P. O BOXt28 SAN CLEMENTE, CAUFORNIA 92672 c,"e's "i,, ^o"o, March 11, 1986 M.'U.Y.Ei Director of Nuclear Reactor Regulation U. S. Nuclear. Regulatory Commission Washington, D.C.

20555

Dear Sir:

Subject:

Docket No. 50-362 Reactor Containment Building Integrated Leak Rate Test San Onofre Nuclear Generating Station, Unit 3 An Integrated Leak Rate Test (ILRT) was performed at San Onofre Unit 3 during November 1985. The test was performed in accordance with the requirements of the Technical Specifications. Both the measured leak rate test and supplemental verification test met the acceptance criteria set forth in the

-Technical Specifications.

The enclosed ILRT report for San Onofre Unit 3 is being submitted pursuant to 10 CFR 50, Appendix J.

Should you have any questions concerning this report, please so advise.

Sincerely, MbM Enclosure cc:

F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3) e6j31eo g g h 2

p P

Y@