ML20236H723

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leak Rate Test, Per 10CFR50,Appendix J.Finding Discussed in Insp Repts 50-324/87-15 & 50-325/87-15.Proposed Schedule for Future Integrated Leak Rate Test to Be Submitted Separately
ML20236H723
Person / Time
Site: Brunswick 
Issue date: 07/29/1987
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236H726 List:
References
NLS-87-147, NUDOCS 8708050312
Download: ML20236H723 (1)


Text

,

Cp&L Carolina Power & Light Company i

)

SERIAL: NLS-87-147 1

50, Appendix 3 JUL 2 91987 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO.1 DOCKET NO. 50-325 LICENSE NO. DPR-71.-

. INTEGRATED LEAK' RATE TEST RESULTS Gentlemen:

In accordance with the provisions of 10CFR50, Appendix 3, paragraphs V.B.1 and V.B.3, Carolina Power & Light Company hereby submits the results of the Brunswick Steam Electric Plant, Unit No.1 Integrated Leak Rate Test performed May 18 through May 19,1987. Representatives from the NRC witnessed the test; their findings are discussed in Inspection Report Nos. 50-325/324/87-15, dated July 9,1987. A proposed schedule'for future Integrated Leak Rate Tests will be submitted separately.

Please refer any questions regarding this matter to Mr. Stephen D. Floyd at (919) 836-6901.

Yours very truly,

.R imm 'rman er Nuclear Licensing Section BAT /lah (5238 BAT)

Attachment I

cc:

Dr. 3. Nelson Grace (NRC-RII) W/A i

. Mr. W. H. Ruland (NRC-BNP) W/A Mr. E. Sylvester (NRC) W/A i

(P P

/

-(

411 Fayetteville Street

  • P. O. Box 1551
  • Raleigh, N C. 27602

%G1257j3

)