ML20141N876

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leak Rate Test Final Rept, Per 10CFR50,App J.Both Measured Leak Rate Test & Supplemental Verification Test Met Tech Spec Acceptance Criteria
Date released: 06/03/2020 Download: ML20141N876


Reactor Containment Bldg Integrated Leak Rate Test Final Rept.
ML20141N881
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/30/1985
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
References
Download: ML20141N881 (17)
Forwards Reactor Containment Bldg Integrated Leak Rate Test Final Rept, Per 10CFR50,App J.Both Measured Leak Rate Test & Supplemental Verification Test Met Tech Spec Acceptance Criteria
ML20141N875
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/11/1986
From: Morgan H
SOUTHERN CALIFORNIA EDISON CO.
To:
Office of Nuclear Reactor Regulation
References
Download: ML20141N875 (1)