ML20091M401
| ML20091M401 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/31/1984 |
| From: | Counsil W NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20091M403 | List: |
| References | |
| B11113, NUDOCS 8406110284 | |
| Download: ML20091M401 (1) | |
Text
I O
General Offices e Selden Street, Berhn, Connecticut
"* co'***c* d"' "* " """
q P.O. BOX 270
[,'[
j 'j " ""
HARTFORD, CONNECTICUT 06141-0270 (203) 666-6911 May 31,1984 Docket No. 50-336 Billl3 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Millstone Nuclear Power Station, Unit No. 2 Reactor Containment Building Integrated Leak Rate Test During the period of December 23 to 25,1983, an Integrated Leak Rate Test (ILRT) was performed on the Millstone Unit No. 2 Containment Building in fulfil (lrpent of Technical Specification 4.6.1.2.11, Northeast Nuclear Energy Comp By letter dated October 26, 1982 the 40+10 month surveillance interval for Technical Specification 4.6.1.2 may be exceeded and that unless contacted to the contrary NNECO intended to proceed with scheduling the ILRT for the end of the 1983 refueling outage. As NNECO had not been contacted to the contrary the ILRT was performed just prior to startup on the dates indicated above.
Mcnce, pursuant to the provisions of Section V.B of Appendix 3 of 10CFR50, NNECO hereby submits a summary technical report of the subject test.
We trust you will find the attached report sufficient to fulfill the requirement of Appendix 3.
Very truly yours, NORTHEST NUCLEAR ENERGY COMPANY
/
l.
W. G. Counsil Senior Vice President 8406110284 840531 PDR ADOCK 05000336 p
PDR (1)
W. G. Counsil letter to R. C. Haynes, dated October 26,1982.
40