Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19261E812 + (Forwards Proposed Repair/Replacement Program for Steam Generator Feedwater Nozzle Safe-End-To-Pipe & Pipe-To-Elbow Welds, in Response to)
- ML19261E813 + (Forwards Proposed Repair/Replacement Program for Steam Generator Feedwater Nozzle Safe-End-To-Pipe & Pipe-To-Elbow Welds, in Response to 790825 Ltr)
- ML20216J750 + (Forwards Proposed Replacement Pages to Decommissioning Plan & for Ts.Pages Are Being Submitted to Replace Similar Pages Previously Transmitted in)
- ML20216K044 + (Forwards Proposed Replacement Pages to TR-2 Ts,In Order to Provide Addl Clarifications & to Accommodate Minor Editorial Changes.Ts Amend Would Clarify Facility Boundaries)
- ML20215G356 + (Forwards Proposed Replacement Tech Spec Pages 3/4 4-29,3/4 4-30 & B 3/4 4-10,containing Figures Re Heatup & Cooldown Curves Issued as Part of Amend 55 to License NPF-8.Pages Contain Same Info,But Provide Higher Quality)
- ML20128H588 + (Forwards Proposed Replacement of ABWR App 3A, Seismic Soil- Structure Interaction Analysis Rept, as Followup to 930130 Transmittal,Supporting Accelerated ABWR Review Schedule)
- ML20128H594 + (Forwards Proposed Replacement of ABWR App 3A, Seismic Soil- Structure Interaction Analysis Rept, as Followup to 930130 Transmittal,Supporting Accelerated ABWR Review Schedule)
- ML19220B577 + (Forwards Proposed Reply Re Util Question on Staffing.W/O Encl)
- ML19221A047 + (Forwards Proposed Reply to Applicants 760831 Comments Re Reactor Vessel Support Analysis)
- ML20236T613 + (Forwards Proposed Rept Showing 1-yr Window of All NRC Review Activities,Per 871014 Meeting.Rept Will Be Updated Monthly & Will Reflect Only NRC Reviews Re Umtrap)
- ML20091D754 + (Forwards Proposed Requalification Training Program Plan for Licensed Senior Reactor Operators Limited to Fuel Handling & Requests Exemption from 10CFR55.59(a)(2) & 10CFR55.59(c)(4)(i)),in Regards to Annual Operating Tests)
- ML19260C470 + (Forwards Proposed Request for Addl Info Re Steam Generator Water Hammer to Be Sent to Licensees for Westinghouse & C-E Plants Not Equipped W/Top Discharge Devices on Steam Generator Feedwater Spargers)
- ML19260C469 + (Forwards Proposed Request for Addl Info Re Steam Generator Water Hammer to Be Sent to Licensees for Westinghouse & C-E Plants Not Equipped W/Top Discharge Devices on Steam Generator Feedwater Spargers)
- ML18057B275 + (Forwards Proposed Request for Relief from ASME Boiler & Pressure Vessel Code,Section XI to Repair Containment Air Cooler.Air Cooler Coil Manifold to Tube Connections Brazed & Difficult to Access for Repair)
- ML20128D470 + (Forwards Proposed Research Program on Fission Product Transport Program - Limerick Plant Analyses Task. Proposal Expands Existing Contract to Cover Analyses of Fission Product Release to Environ)
- ML20134G274 + (Forwards Proposed Resolution for Remaining Concerns Not Addressed in 850726 & 0802 Submittals Re App R,Section Iii.G Exemption Requests,Covering West Reactor Bldg & Northeast & Southeast Reactor Bldg Corner Rooms)
- ML20082F182 + (Forwards Proposed Resolution for Specific Equipment Environ Qualification Deficiencies,Per 831013 Meeting.Master List of safety-related Electrical Equipment & Methodology to Identify Equipment Per 10CFR50.49(b)(2) Also Encl)
- ML20073T071 + (Forwards Proposed Resolution of Containment Sys & Instrumentation & Control Sys Branches Outstanding SER Issues Re Gessar II)
- 0CAN948407, Forwards Proposed Resolution of Deficiencies Re Environ Qualification of safety-related Equipment,To Be Discussed at 840426 Meeting W/Nrc in Bethesda,Md + (Forwards Proposed Resolution of Deficiencies Re Environ Qualification of safety-related Equipment,To Be Discussed at 840426 Meeting W/Nrc in Bethesda,Md)
- ML20092P289 + (Forwards Proposed Resolution of Fire Protection Issues Re Imposition of All NFPA Codes & Training Requirements, Applicability of GDC 1 & Imposition of Surveillance Tests)
- ML20116L388 + (Forwards Proposed Resolution of ISLOCA for Abwr,Including Modified P&ID for Affected Sys.Ge Will Prepare Corresponding Mod to Subsection 19B.2.15 Re High/Low Pressure Interface Design Following NRC Review & Approval of Proposed ISLOCA)
- ML20154E299 + (Forwards Proposed Resolution of USI A-47, Safety Implications of Control Sys in LWR Nuclear Power Plants, for Review & Approval)
- ML20204G087 + (Forwards Proposed Resolution to GESSAR-II SER Outstanding Issue Re post-accident Monitoring Instrumentation)
- ML20077B679 + (Forwards Proposed Resolution to SER Open Item 10, Lockout of Manual Control by Load Sequencer. Appropriate Procedures Will Be Revised to Provide Operator W/Specific Guidance as to When & How Action Should Be Taken)
- ML19332C840 + (Forwards Proposed Resolutions for Generic Issue 70, PORV Reliability & Generic Issue 94, Addl Low-Temp Overpressure Protection for Lwr)
- ML20073J894 + (Forwards Proposed Resolutions to Selected Outstanding Issues)
- ML19329B351 + (Forwards Proposed Response Re Facility Electrical Problems & Summary of 750519-22 Insp Findings)
- NOC-AE-000118, Forwards Proposed Response to 980305 RA Re Proposed Conversion to Improved Std Ts.Util Would Like to Use Proposed Response as Basis for Telcon to Be Conducted Wk of 980330 + (Forwards Proposed Response to 980305 RA Re Proposed Conversion to Improved Std Ts.Util Would Like to Use Proposed Response as Basis for Telcon to Be Conducted Wk of 980330)
- ML20091G807 + (Forwards Proposed Response to B Garde .Control Ticket Indicates That Response Should Be Prepared for Signature.Requests Opportunity to Respond,As Comments Appear to Be Directed at Region III Ofc)
- ML20091F441 + (Forwards Proposed Response to B Garde Re Approval of S&W to Conduct Third Party Const Implementation Overview. Response W/Author Signature Requested)
- ML20209C660 + (Forwards Proposed Response to Commissioner Gilinsky 831213 Memo Re Facility Operator Qualifications.Proposed Response Received Concurrence of NRR & Oeld)
- ML20207D072 + (Forwards Proposed Response to Congressmen Udall & Markey Re Hartman Allegations.Response Concurred in by All Appropriate Ofcs Except for Ofc of Inspector & Auditor Which Does Not Concur in Answer to Question 3)
- ML19318A007 + (Forwards Proposed Response to Encl Ja Stewart Re Harrisburg,Pa City Council Resolution on Emergency Planning)
- ML20197E830 + (Forwards Proposed Response to First Issue Posed by House Committee on Appropriations Re Interrelationship of Ofc of Investigation & IE)
- ML19289F947 + (Forwards Proposed Response to G Hart Re State & Local Capabilities to Cope W/Civilian Nuclear Accident)
- ML19317H343 + (Forwards Proposed Response to Ja Stuart to President Carter Re City Council Resolution on Emergency Planning)
- ML18150A052 + (Forwards Proposed Response to K Liu 870320 Request for Info to R Vollmer Re Util Screening Criteria in Selecting Sys That May Be Susceptible to Single Phase Erosion/Corrosion Phenomenon)
- ML20237J782 + (Forwards Proposed Response to Licensee Accepting Rev 5 to Physical Security Plan,Per H Bernard 820827 Technical Assistance Request)
- ML20137U003 + (Forwards Proposed Response to Ltr from H Myers & Informs of No Need for Further Commission Review)
- ML20126J606 + (Forwards Proposed Response to M Lewis Re Safe Operation of Repaired Steam Generators)
- ML19344A289 + (Forwards Proposed Response to Mm Cherry 730703 Request for Info & Documents.Requests Response Re Ltr Accuracy & Completeness)
- ML20209B904 + (Forwards Proposed Response to Second Item in Ucs Re Environ Qualification of safety-related Equipment Per 830111 Request)
- ML20245C449 + (Forwards Proposed Response to Senator Kennedy Questions on 880308 Re Historical Scram Rate for Pilgrim)
- ML20235B070 + (Forwards Proposed Response to TB Carvey Re Const of Nuclear Power Plant at Bodega Bay)
- ML20198F864 + (Forwards Proposed Response to Util 780222 Inquiry Re Use of BTP Meb 3-1 & Reg Guide 1.46)
- ML20037A337 + (Forwards Proposed Response to Util Re Qualification of Onsite Radiation Protection Manager)
- ML19329A436 + (Forwards Proposed Response to Util Re Qualifications of Radiation Protection Managers)
- ML20210L476 + (Forwards Proposed Responses to Baggett Ltr,Dtd 970324,re Model 60-01-DR)
- ST-HL-AE-1720, Forwards Proposed Responses to Assist NRC in Responding to Doi & Jf Doherty Comments on Des,Per Np Kadambi Request.Most Doi Comments Addressed in CP Review + (Forwards Proposed Responses to Assist NRC in Responding to Doi & Jf Doherty Comments on Des,Per Np Kadambi Request.Most Doi Comments Addressed in CP Review)
- ML20154P822 + (Forwards Proposed Responses to Congressional Requests for NRC Views on Bills HR 5923,HR 6116 & HR 6212.Responses Incorporate Staff Comments Consistent with Chairman Recent Testimony.Comments Apprecited by 800404)
- ML20128C445 + (Forwards Proposed Responses to Correspondence Re Facilities for Discussion at Info Meeting)