ML20245C449

From kanterella
Jump to navigation Jump to search
Forwards Proposed Response to Senator Kennedy Questions on 880308 Re Historical Scram Rate for Pilgrim
ML20245C449
Person / Time
Site: Pilgrim
Issue date: 03/22/1988
From: Novak T
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML20244D847 List:
References
FOIA-88-198 NUDOCS 8904270158
Download: ML20245C449 (7)


Text

_ - _ _ _ _ __ - . _ - . __ .-

%:n.

l . .

  1. " 'o

~,,

- UNITED STATES

!" o NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

%...../

March 2~. 1988 MEMORANDUM FOR: Frank Miraglia, Associate Director

~for Projects, NRR FROM: Thomas M. Novak, Director Division of Safety Programs, AEOD

SUBJECT:

RESPONSE TO KENNEDY QUESTION 9 ON PILGRIM Enclosed is our proposed response to Senator Kennedy's question of March 3,1988 concerr.ing the historical scram rate for Pilgrim. Our input was.

requestad by Dan McDonaid on March 15, 1988. If vou have any questions, please contact Bob Dennig (x24490) or Jack Crooks (x?4425) of my staff.

Thnmas M. Novak, Director Division of Safety Programs Office for Analysis and Evaluation of Operational Data

Enclosure:

As stated cc: E. Jordan C. J. Heltemes D. Mcdonald L. Bell 8904270158 890419 r//50 PDR FDIA JOHNSONBB-198 PDR

y

.l X '. .

MEMORANDUM FOR: Frank Miraglia, Associate Director for Projects, NRR FROM: Thomas M. Novak; Director-Division of. Safety Programs, AE00

SUBJECT:

RESPONSE TO KENNEDY 00ESTION 9 ON PILGRIM Enclosed is our proposed response.to Senator Kennedy's question of March 8,1988 concerning the historical scram rate for Pilgrim.- Our input was requested by Dan Mcdonald on March 15, 1988. If you have any questions, please contact Bob Dennig (x24490) or . lack Crooks (x?4425) of my staff.

Thomas M. Novek, Director Division of Safety Programs Office for Analysis'and Evaluation

.of Operational Data

Enclosure:

As stated cci E. Jorden C. J. Heltenes D. Mcdonald j L. Bell DISTRIBUTION DCS

.DSP RF TPAB RF/CF RDennig L

JCrooks 1:

DSP:TPAR DSP:TPAB DSP:DIR RDennig:aj MWilliams TNovak 3/ /88 3/ /88 3/ /88

_-_=____ _
i .

-t

/4 .

Table 1 Unplanned Scrams Per Critical for Pilgrim and Industry 1984 - 1987 19R4*' 19R5 1986 1987**

Pilgrim -

' Automatic 0 4 4 0 Manual. 0 0 0 0 j Industry Average Automatic 5.4 5.0 4.0 3.2 Manual 0.6 0.5 0.5 0.6

  • Pilarim critical hours for 1984 = 170.
    • Pilgrim critical hours for'1987 = -

0.

.1 1

r. .- i 1

i J

OVEST10N 9. How many automatic and manual scrams have. occurred at Pilarim since the plant became operational? What is the annual industry-wide average?

i i

ANSWER.

Table 1 provides counts of unplanned automatic and manual scrams during critical operation for Pilgrim from 1984 through 1987 compiled from licensee event reports per 10 CFR 50.72 and 10 CFR 50.73. The comparable industry average rates are also provided in Table 1.

Prior to 1984, reactor scrams were not directiv reportable to the NRC (Pilgrim entered commercial service December 1, 1972). As a result, an accurate r

4 i etM b+ ripsM listiri L.- -

. unn vue

,. h ._ u__ s_. % & g of re.acter listinghasnogbeencompiledforprecedingyears%

- vo-iine si.e., usuady,

.. E. a,v, 2 m.

-abe v e 10 pc. cerit ei iull puwer) can oe cimisiled fre- the = nth 1 N s Sunnary Keport - Licer ed Operating Deectors. H" REC-00?0,-if you d: Mre. )

Enclosure:

W T J A ,; 0 4 - A f % 6  ;

C- pp gx Kennedv/AEOD 3/21/88

j;l . [' c

];;

n l ..;

DIRECTOR'S HIGHLIG4TS'

.PDI-3 MARCH 22, 1988-i

+

9 i

I j

4 y a

,i h Aft /th

& Y Pilgrim-Activ$ Update NRR, with the assistance of the residents, reviewed the Direct Torus Vent (DTV) installation and supporting documentation on March 2-3, 1988. The hard pipe DTV has been installed and capped off with blank flange pending review and resolution of operability requirements. Staff review indicates the ,

i licensee's modification, made pursuant to 10 CFR 50.59, is acceptable.

The Restart Assessment Panel met at the site on March 9. A pro,iected schedule for .'ilgrim restart was developed. The schedule is tentative and in based on successful completion of integrated activities by both the licensee and staff.

The licensee is aware of the schedule and generally agrees, but would like to shorten the pro,iected restart date currently estimated to be August 1,1988.

- The licensee's self assessment effort is scheduled to be completed by May 16 and is a prerequisite to the staff's Integrated Assessment Team Inspection.

A team inspection was conducted the week of March 14 to review the Procedure Generator Package (PGP) program and implementation of the E0Ps including operator training in the use of the E0Ps. An SE will be written closing out the PGP review and an Inspection Report with four unresolved items in the E0P implementation which will requ',re folltvup by the Region.

The following is tN status of the strifs activities related to Controlled Correspondence:

the Chairman have beer, provided, j

  • The Massachusetts 2.206 Petition responses have been completed and provided to OGC for concurrence.

I

l j

3/w/s ?

11de: 5?fm "

%'.Dw SJfeA '. PqeuJ ? & \(y ~ sl.Q 9 pW c u L ? m cc ~wu C ys/wg b

3/x 4y &h-w 2 vA g (% u& RJ.Rg 9  %'r7 @. %

d 4dd.YL,Ih p L pu d 1LJ 0 %udl Q & y4& ad ya2 9 c,fTh -s Q o-w auA.\ w ~ A I. ng w= 4 BJ

  • v qa i s
7. M k.- t C~4e 'ad 'rNO 8Boysc.LQ 3r SEE I' 'l 4, M @h/ N 'N $ DE 61 %
s. E  ? La - va,j -
c. SQj Odd L sRSJJm (JL D

%W L ed M JL2 M l

& pc wm m . oh & e t

b Ly pa Ah V 4W sDc'