ML20128H588
| ML20128H588 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 02/10/1993 |
| From: | Fox J GENERAL ELECTRIC CO. |
| To: | Poslusny C Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20128H594 | List: |
| References | |
| NUDOCS 9302170090 | |
| Download: ML20128H588 (2) | |
Text
ar~~"*~
. +;
"h GE &c!:r Energy t's t u rn to u s t
February 10,1993 Docket No. STN 52-001 Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated AllWR Review Schedule
Dear Chet:
Enclosed is a proposed replacement of Appendix 3A, Seismic Soil-Structure Interaction Analysis, as a follow-up to the Januuary ? J,1993 (JF93-17) transmittal.
Please provide copies of this transmittal to Tom Cheng and Gautam Bagchi.
S!ncerel, ifck Fox Advanced Reactor Programs cc: Gary Ehlert (GE) w/o Enclosure Marman Fletcher (DOE) w/o Enclosure Ting Yu Lo (LLNL) w/ Enclosure J1 % 26 9302170090 930210 PDR ADOCK 0S200001 A
-PDR
, i,. 4 DOCKET: 52-001 DATE:-
J//L[93-NOTE T0: Document Control Desk FROM: Chester Poslusny, PM, NRR
SUBJECT:
DOCKETING OF-ABWR INTORMATION RELATED'TO DESIGN CERT REVIEW Document Date: 2/9/9}
Subject:
JO// J74-Nt4%
M d
Author ~[for 6f Distribution: 1 copy to REG FILE (v/)
(-
ACRS 15
)
NRR/ADAR/PDST f1
()
NRR/ DORS /01SB 1
(f)
NRR/DE/ECGB R
()
NRR/DE/EELB 1
()
NRR/DSSA/SPLB 1
()
NRR/DSSA/SRXB 1
(-- )
NRR/DSSA/SCSB 1
()
NRR/DSSA/SPSB 1
()
NRR/DRIL/RPEB 1
()
NRR/DRCH/HICB 1
( --)
NRR/DRCH/HHfB 1
' ()
NRR/DRSS/PEPB 1
(.)
NRR/DRSS/PRPB 1
()
NRR/DRSS/PSGB 1
(r)
NRC PDR 1
(v)
PNL-Stegbauer, E 1
(y)
NRR/ILPB/Suh,-G.
I 4
120030
,l c
-i y gl b
gd',
q
.