ML20128H588

From kanterella
Jump to navigation Jump to search
Forwards Proposed Replacement of ABWR App 3A, Seismic Soil- Structure Interaction Analysis Rept, as Followup to 930130 Transmittal,Supporting Accelerated ABWR Review Schedule
ML20128H588
Person / Time
Site: 05200001
Issue date: 02/10/1993
From: Fox J
GENERAL ELECTRIC CO.
To: Poslusny C
Office of Nuclear Reactor Regulation
Shared Package
ML20128H594 List:
References
NUDOCS 9302170090
Download: ML20128H588 (2)


Text

ar~~"*~

. +;

"h GE &c!:r Energy t's t u rn to u s t

February 10,1993 Docket No. STN 52-001 Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation

Subject:

Submittal Supporting Accelerated AllWR Review Schedule

Dear Chet:

Enclosed is a proposed replacement of Appendix 3A, Seismic Soil-Structure Interaction Analysis, as a follow-up to the Januuary ? J,1993 (JF93-17) transmittal.

Please provide copies of this transmittal to Tom Cheng and Gautam Bagchi.

S!ncerel, ifck Fox Advanced Reactor Programs cc: Gary Ehlert (GE) w/o Enclosure Marman Fletcher (DOE) w/o Enclosure Ting Yu Lo (LLNL) w/ Enclosure J1 % 26 9302170090 930210 PDR ADOCK 0S200001 A

-PDR

, i,. 4 DOCKET: 52-001 DATE:-

J//L[93-NOTE T0: Document Control Desk FROM: Chester Poslusny, PM, NRR

SUBJECT:

DOCKETING OF-ABWR INTORMATION RELATED'TO DESIGN CERT REVIEW Document Date: 2/9/9}

Subject:

JO// J74-Nt4%

M d

Author ~[for 6f Distribution: 1 copy to REG FILE (v/)

(-

ACRS 15

)

NRR/ADAR/PDST f1

()

NRR/ DORS /01SB 1

(f)

NRR/DE/ECGB R

()

NRR/DE/EELB 1

()

NRR/DSSA/SPLB 1

()

NRR/DSSA/SRXB 1

(-- )

NRR/DSSA/SCSB 1

()

NRR/DSSA/SPSB 1

()

NRR/DRIL/RPEB 1

()

NRR/DRCH/HICB 1

( --)

NRR/DRCH/HHfB 1

' ()

NRR/DRSS/PEPB 1

(.)

NRR/DRSS/PRPB 1

()

NRR/DRSS/PSGB 1

(r)

NRC PDR 1

(v)

PNL-Stegbauer, E 1

(y)

NRR/ILPB/Suh,-G.

I 4

120030

,l c

-i y gl b

gd',

q

.