Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350D111 + (Forwards Primary Containment Leakage Rate Testing,1980.)
- GO2-80-283, Forwards Primary Containment Vessel Design Diagrams,In Response to NRC .Drawings Detail Containment Geometry,Shell Reinforcement,Plate Thickness & Penetration Sizes.Aperture Cards Available in Centrl Files Only + (Forwards Primary Containment Vessel Design Diagrams,In Response to NRC .Drawings Detail Containment Geometry,Shell Reinforcement,Plate Thickness & Penetration Sizes.Aperture Cards Available in Centrl Files Only)
- ML19220C513 + (Forwards Primary Coolant Sample Analysis Info Developed by Bland & F Kantor)
- ML20207L658 + (Forwards Primary Coolant Sources Outside Containment, Initial Exam Summary Rept, Per TMI Item III.D.1.1. Presently,No Fuel Stored in Fuel Pool)
- B10597, Forwards Primary Features of Physical Security Plan.Features Withheld (Ref 10CFR2.790) + (Forwards Primary Features of Physical Security Plan.Features Withheld (Ref 10CFR2.790))
- ML20205J288 + (Forwards Primary Inventory Trend Sys Design/Operational Analysis, Per NUREG-0737,Item II.F.2.Rept Provides Analysis Necessary to Demonstrate Adequacy of Sys)
- ML20056H270 + (Forwards Primary Plant Make Up Storage Tank Seismic Upgrade Songs,Unit 2 Summary Rept to Support NRC Review of Proposed TS Change PCN 418 to Licenses NPF-10 & NPF-15 Submitted by)
- PY-CEI-NRR-1664, Forwards Primary Reactor Containment ILRT Rept. Rept Summarizes Results of Periodic Test Conducted on 930222-0304,during Mid-Cycle 4 Maint Outage + (Forwards Primary Reactor Containment ILRT Rept. Rept Summarizes Results of Periodic Test Conducted on 930222-0304,during Mid-Cycle 4 Maint Outage)
- ML20125D074 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept.Rept Describes & Summarizes Integrated Leak Test Activities Performed During Third Refueling Outage.Test Completed on 850303)
- ML20039B678 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept, Per Tech Spec 6.9.3.0 & 10CFR50 App J, Section V.B. W/Guidance of Reg Guide 10.1)
- 2CAN108101, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Per Tech Spec 4.6 & 10CFR50,App J,Part 5B + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Per Tech Spec 4.6 & 10CFR50,App J,Part 5B)
- 2CAN078810, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept,Per Tech Spec 4.6.1.2 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept,Per Tech Spec 4.6.1.2)
- ML20134E411 + (Forwards Primary Reactor Containment Integrated Leak Rate Test Rept, Performed on 850520 Per 10CFR50,App J)
- ML20134E414 + (Forwards Primary Reactor Containment Integrated Leak Rate Test Rept, Performed on 850520 Per 10CFR50,App J)
- ML20101U366 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept)
- ML20100G047 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept)
- ML20137F534 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept)
- 1CAN038913, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept)
- 2CAN088508, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept)
- 1CAN038507, Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept)
- PM-82-868, Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept, Per 10CFR50,App J,Section VB Requirements + (Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept, Per 10CFR50,App J,Section VB Requirements)
- ML20154L664 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept, of 851124 Periodic Test)
- ML20024H640 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test Final Rept,Per 10CFR50,App J.Test Completed on 910116)
- ML20024H641 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test Final Rept,Per 10CFR50,App J.Test Completed on 910116)
- ML19337B628 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept. Containment Vessel Has Been Assessed as Fully Capable of Performing Intended Function in Plant Operation)
- ML19337B629 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept. Containment Vessel Has Been Assessed as Fully Capable of Performing Intended Function in Plant Operation)
- ML20126H817 + (Forwards Primary Reactor Containment Integrated Leak Rate Test)
- ML20062K240 + (Forwards Primary Reactor Containment Integrated Leak Rate Test)
- 1CAN058109, Forwards Primary Reactor Containment Integrated Leakage Rate Test + (Forwards Primary Reactor Containment Integrated Leakage Rate Test)
- ML20076J932 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept)
- ML20066G518 + (Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept,Per 10CFR50,App J,Section V,Paragraph B.Rept Performed as Scheduled in Nov 1990)
- ML20088A517 + (Forwards Primary Reactor Containment Structural Integrity Test & Integrated Leakage Rate Test, Jan 1984 Final Rept)
- AECM-82-140, Forwards Primary Reactor Containment Structural Integrity Test & Primary Reactor Containment Integrated Leakage Rate Test, Final Repts.Fsar Section 3.8 Will Be Revised to Include Results of Containment Structural Integrity Test + (Forwards Primary Reactor Containment Structural Integrity Test & Primary Reactor Containment Integrated Leakage Rate Test, Final Repts.Fsar Section 3.8 Will Be Revised to Include Results of Containment Structural Integrity Test)
- ML20236B597 + (Forwards Princeton Gamma Tech QA Program.Fee Paid)
- ML20196E405 + (Forwards Principal Documents Re Rev of NRC Radiation Protection Stds in 10CFR20)
- ML19309G630 + (Forwards Principal Parameters for Radiological Assessment, Conceptual Operational Sequences for Single Cell & three- Cell Tailings Disposal,List of Emission Sources & Controls, Annual Meteorological Summary & Perimeter Map)
- ML20206C367 + (Forwards Principal Response to Ucs 870406 Petition Under 10CFR2.206,for Immediate Action to Relieve Undue Risks Posed by Nuclear Power Plants Designed by B&W)
- ML20043C110 + (Forwards Principles for Exemption of Radiation Sources & Practices from Regulatory Control, to Replace Copy Received at 880729 Meeting)
- ML20202C374 + (Forwards Print Info for 906 Cover & Info on 100B Ion Chamber.Also Included Hard Copy of Info Previously Faxed on 980120)
- ML20069L014 + (Forwards Printer Proof of Public Info Booklet to Be Distributed to General Public as Part of Offsite Emergency Preparedness Plan.Color Sketch Indicating Color Coding for Protective Action Section Encl.W/O Encl)
- ML20245B332 + (Forwards Printout Indicating Implementation Status of NUREG-0737 Items at Facility,Per 890414 Request)
- U-601432, Forwards Printout Indicating Status of Implementation of TMI Action Plan Items at Facility.All Actions Required by Plan Completed + (Forwards Printout Indicating Status of Implementation of TMI Action Plan Items at Facility.All Actions Required by Plan Completed)
- ML20147C618 + (Forwards Printout Reflecting Current Status & Schedule of Plant Restart Review.Approx 74% of 135 Reviews,Insps & Restart Tech Specs Completed.Restart Sser Will Be Issued by 880115.Addl Sser Will Be Issued Before Startup)
- ML16341D064 + (Forwards Printout from Allegation File Sys Directed to Util for Evaluation,Investigation & Response.Responses Will Be Evaluated for Clarity,Comprehensiveness & Substance.Response Requested within 30 Days of Ltr Receipt)
- ML20197J565 + (Forwards Printout from Detailed Licensing Action Data Base Created to Eliminate Discrepancies Re Open TMI Action Items. Printout Should Be Reviewed & Corrections Given to R Scholl within 2 Wks)
- ML20125B573 + (Forwards Printout from Which Most Probable Cumulative Dose Was Derived.Input TLD Data for Upper & Lower Bound Calculations Encl)
- ML20245D185 + (Forwards Printout of All Publicly Available Records Re Plant from 840101 to Present.W/O Encl.Related Correspondence)
- ML19322D178 + (Forwards Printout of B&W Facility Failure Data for 1973-1978)
- ML20197J612 + (Forwards Printout of Detailed Data Base Re TMI Action Items for Review.Data Base Displays Task Completion Info & Data Base Used in Forming Conclusions.Data Base Designed for Response to Congressional & Commission Inquiries)
- ML20236D473 + (Forwards Printout of Earthquake Data File Re Earthquakes Which Occurred Near Plant from 1968-1974,per Request.Nrc Now Considering Data in Analysis.Earthquake Data File Code Explanation Also Encl.W/O Printout)
- ML20245B498 + (Forwards Printout of Status of Implementation of TMI Action Items,Per NRC 890414 Request)
- ML20244E162 + (Forwards Printout of TMI Action Plan Items,Annotated by Util to Denote Implementation Status of Each Item,In Response to)