ML20134E411

From kanterella
Jump to navigation Jump to search
Forwards Primary Reactor Containment Integrated Leak Rate Test Rept, Performed on 850520 Per 10CFR50,App J
ML20134E411
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 08/05/1985
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Butcher E
Office of Nuclear Reactor Regulation
Shared Package
ML20134E414 List:
References
NUDOCS 8508200202
Download: ML20134E411 (1)


Text

_ _ _ _ _ _ -

l BALTIMO RE GAS AND ELECTRIC CHARLES CENTER. P. O. BOX 1475 BALTIMORF, MARYLAND 21203 i

AntHun E. LUNDVALL Jn.

VICC PRESIDENT

$UPPLY August 5,1985 i

i 1

i I

j U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 ATTENTION:

Mr. Edward J. Butcher, Jr., Acting Chief i

Operating Reactors Branch #3 i

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1; Docket No. 50-317 Reactor Containment Building i

Integrated Leakage Rate Test Report i

REFERENCE:

(1) 10 CFR 50, Appendix J Gentlemen:

A successful periodic Reactor Containment Building integrated Leak Rate Test, in accordance with Reference (1), was performed on May 20,1985, on Unit No.1. Twelve copics of this test report are herewith forwarded for your review, as required by Section V of Reference (1).

Jery truly,yours,

fb c/

, ' [' x e / a / C 8508200202 850805 PDR ADOCK 05000317

/

'h P

PM AEL/OPB/ bat 4

Enclosures (12) cc D.A. Brune, Esquire G.F. Trowbridge, Esquire T.

Foley, NRC D.H. Jaffe, NRC Obw

'\\

- - - -- --