Forwards Primary Reactor Containment Integrated Leakage Rate Test, Final Rept.Rept Describes & Summarizes Integrated Leak Test Activities Performed During Third Refueling Outage.Test Completed on 850303
ML20125D074
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/03/1985
From: Mcdonald R
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20125D076 List:
References
NUDOCS 8506120239
Download: ML20125D074 (1)


Text

rn-Malling Address -

Alabama Power Company '

- 600 North 18th Street -

Post Office Box 2641

~ Birmingham, Alabama 35291 Telephone 205 783-6090 R.P. Mcdonald '

Senior Vice President Flintridge Building ' AlabamaPower

"# "he'" " 5 *

Docket- No. 50-364 t

June 3, 1985 Director, Nuclear. Reactor Regulation U. S. Nuclear Regulatory Coinnission l Washington, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear. Plant - Unit 2 Reactor Containment Building Integrated Leak Rate Test 3 Gentlemen:

Pursuant to the. requirements of 10CFR50, Appendix J, Section V.B, Alabama Power Company herewith submits the Joseph M. Farley Nuclear-Plant Unit 2 first periodic Reactor Containment Building Integrated Leak Rate Test report.~ This report describes and summarizes the Integrated. Leak Rate Test (ILRT) activities performed during the Unit 2 third refueling outage. This test was completed on March 3, 1985.

Other pertinent report information, including, as applicable, test plans and schedules, test results'and reports and test methods-and procedures is available at Farley Nuclear Plant for review. If

- /there.are any questions, or if additional-information is needed, please advise.

.y Yours tru ,

/ o

'R. P. Mcdonald RPM / STB:drs/D-355 Attachment cc: Mr. L. B. Long-