Text

.

~

~

c.

Interoffice Correspondence Georgia Power A June 16, 1983 GM-83-573 PLANT E. I. HATCH Primary Containment Integrated Leak Rate Test Report Mr. Harold R. Denton Director of Nuclear Reactor Regulation.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Transmitted herewith are 3 copies of the E. I. Hatch Plant, Unit 1, Reactor Containment Building Integrated Leak Rate Test Report completed in February, 1983. Included in this report as Appendix H is a summary of the Local Leakage Rate Testing completed prior to the ILRT.

The report is written in accordance with 10CFR50, Appendix J, bection V.B. requirements.

If there are any questions, please call Jack Robertson at extension 2869.

C. Nix General Manager ffL WBK/hh xc: J. T. Beckham, Jr.

J. R. Jordan T. V. Greene L. T. Gucwa C. McWhorter J. W. Robertson Document Control: M58 0

i o 8307070069 830616 PDR ADOCK 05000321 p PDR b\MsM