1CAN058109, Forwards Primary Reactor Containment Integrated Leakage Rate Test

From kanterella
Jump to navigation Jump to search
Forwards Primary Reactor Containment Integrated Leakage Rate Test
ML20126K966
Person / Time
Site: Arkansas Nuclear 
Issue date: 05/22/1981
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20126K968 List:
References
1CAN058109, 1CAN58109, NUDOCS 8105270106
Download: ML20126K966 (2)


Text

_

a e,

yp j

'c e

(

j i\\

$\\

99 h

L h

,;, [ O es 1

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARdNSAS'72203 (501)371-f 4 4 May 22, 1981 g

(

1CAN058109 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comm.

Washington, D.C.

20555

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 i

Reactor Containment Building Integrated Leak Rate Test (File: 0520.2)

Gentlemen:

In accordance with the requirements of technical specification 4.4, Appendix J of 10 CFR 50, and the submittal guidance of Regulatory Guide 10.1, attached are fifteen (15) copies of the subject report.

Very truly yours, Lk4 e. '74 David C. Trimble Manager, Licensing' DCT:DVH:1p Attachments cc: Mr. Norman M. Haller, Director (2 copies) Office of Management & Program Analysis U. S. Nuclear Regulatory Comm. Washington, D.C. 20555 THIS DOCUMENT CONTAlt1S POOR QUALITY PAGES 0 } 8195270106 MEMBEA MiOOLE SOUTM UTIUTIES SYSTEM

I &c go, JCMdT81WT Form 301 F 1 Revised 2-15-79 o Regulatory Report Review Plant: e /Caca] //qc[eu 8m Unit: / Report

Title:

Irae/m Co.,S,*,. .mY /1//e// 2d dl had dd IM 7 p Report Number: [eSymaev A f, / Y/ Report Type: Routine: f;xl} Non-Routine: () Special: () Reportable Occurrence: 14 day ( ) 30 day ( ) S/!// Prepared By: C.A. [$ de-Date: !: A I/O' '/ ~ bb # [/A/ / Reviewed By: ( Date: General Manager or Cognizant Manager / Supervisor (Signature, reference or NA) Reviewed By: W Date: A / Cognizant Licensing Rdviewer Reviewed and I[2t[r/ Approved By-Date: Manager, Licensing Review Required: PSC YES () NO SRC YES ( NO ) . Reviewed By: k Date: Plant Safety 'Cj5mmittee (Signature or reference) Reviewed By: h Date: _ Safety Review CAmmittee -n-. --}}