Forwards Primary Plant Make Up Storage Tank Seismic Upgrade Songs,Unit 2 Summary Rept to Support NRC Review of Proposed TS Change PCN 418 to Licenses NPF-10 & NPF-15 Submitted by
ML20056H270
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/07/1993
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20056H271 List:
References
TAC-M71194, TAC-M71195, NUDOCS 9309090067
Download: ML20056H270 (3)


Text

wr.w

?"bE$

Southem Califomia E'dison Company 23 PARKEH S1HEET tRVINE, CAL IFOHNIA 92718 September 7, 1993 wAuen c uAns,4 1AAteAC+L 94 DP NUCA E AH HL GLILAI DRV A8 9 AfMS (714) 454 44D3 U. S. Nuclear Regulatory Commission Attention: Do:ument Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Component Cooling Water System TAC Nos. 71194 and 71195 San Onofre Nuclear Generating Station Units 2 and 3

References:

1)

Letter from Harold B. Ray (SCE) to the Document Control Desk 3

dated December 30, 1992;

Subject:

Docket Nos. 50-361 and 50-362, Proposed Technical Specification Change No.

NPF-10/15-418, Component Cooling Water Safety Related Makeup System, San Onofre Nuclear Generating Station, Units 2 and 3.

2)

Letter from F. R. Nandy (SCE) to the Document Control Desk I

dated July 30, 1990;

Subject:

Docket Nos. 50-361 and 50-362 i

Component Cooling Water System, TAC Nos. 71194 and 71195, San Onofre Nuclear Generating Station, Units 2 and 3.

This letter provides the analysis summary of the Primary Plant Hake-up Storage (PPMS) tank upgrade to support the NRC review of Proposed Technical Specification Change No. NPF-10/15-418 (PCN 418) submitted by Reference 1.

9 DISCUSSION In Reference 2 Southern California Edison (SCE) committed to provide a dedicated Seismic Category I source of emergency make-up water to the Component Cooling Water (CCW) system by the end of the Cycle 7 refueling outage for each Unit. To provide this make-up water source SCE upgraded the PPMS tank, T-056 for Unit 2 during the recently completed Unit 2 Cycle 7 refueling outage, and will complete the upgrade of T-055 for Unit 3 during the upcoming Unit 3 Cycle 7 refueling outage.

t These tanks were originally designed to American Petroleum Institute (API)

-620 Standard, 5th Edition, constructed and tested to API-650 Standard, 5th Edition, and were classified as Quality Class III and Seismic Category II components.

" 'fofo90067 930907 f

9-PDR ADDCK 05000361 t d '@1 4

p PDR j

-=

i

)

Document Control Desk ;

t These tanks are being upgraded with physical modifications to meet the requirements of Quality Class II, Seismic Category I, and American Society of l

Mechanical Engineers (ASME)Section III Class 3 Code with the exception of l

N-stamp and Code inspection. Materials, design, fabrication, installation, j

examination, testing, overpressure protection, and welding requirements of the API codes were reconciled with the requirements of the ASME Code (1989 Edition with no Addenda).

j i

As part of the upgrade effort of the Unit 2 PPMS tank, SCE conducted a survey of the original shell plate seam welds to satisfy the ASME Code requirement i

for the extent of spot radiographic examinations. The radiographic i

examination results revealed welding defects in excess of the code allowables.

The survey was expanded, and more defects were discovered. A list of these i

defects is provided in the enclosed report.

j i

Because the welding on the Unit 2 PPMS tank shells did not meet the ASME Code requirements, it was necessary to demonstrate these welds are capable of l

withstanding a Design Basis Earthquake plus other simultaneous loads. Based on the examination results, a statistical analysis was perfonned to establish the maximum flaw size with a high confidence level. The statistical analysis was followed by a fracture mechanics evaluation to show that the existing l

flaws are acceptable with a substantial factor of safety.

Calculation number M-DSC-280 documents the seismic upgrade analyses and code reconciliation, l

including a detailed explanation of the statistical and fracture mechanics l

analyses, for the Unit 2 tank. Calculation M-DSC-269 documents the seismic upgrade analysis for the Unit 3 tank. When the rariiographic survey results become available, a code reconciliation analysis similar to the Unit 2 tank i

analysis will be performed for the Unit 3 tank, if necessary.

Included in the l

enclosure to this letter are summaries of the seismic upgrade analysis and i

ASME Code reconciliation.

r Consistent with this upgrade, both PPMS tanks will be added to the San Onofre Section XI testing program.

i i

INTERIM ADMINISTRATIVE CONTROLS j

i Pending completion of the NRC review of PCN 418, the following administrative controls have been implemented to address Seismic Category I make-up to the CCW system 1)

The new Seismic Category I make-up system, which uses the PPMS tanks, will 6

be maintained consistent with PCN 418 and the Design Basis of the system.

f

2) The Seismic Category I firewater tankers will be maintained in place to i

provide make-up to the CCW system.

(The Seismic Category I tankers are qualified for CCW system leak rates up to 6 gpm.)

l 3)

If the CCW system leak rate exceeds 6 gpm or if the Seismic Category I f

firewater tankers are inoperable, SCE will take credit for the availability of the new Seismic Category I make-up system, which uses the PPMS tanks, provided the leak rate is within the capability of the new l

l l

Document Control Desk l t

system. Actions will be taken to reduce the leak rate as soon as i

practical.

l 4)

If required make-up is not available from either the Seismic Category I tankers or the PPMS tanks, SCE will declare the appropriate train (s) of j

CCW inoperable and enter Technical Specification 3/4.7.3, " Component i

Cooling Water System."

SCE intends to follow the same implementation plan for Unit. 3.

Please let ce know if you have any questions or would like additional informction.

Very truly yours, h0 hf Enclosure I

cc:

B. H. Faulkenberry, Regional Administrator, NRC Regica V i

J. J. Russell, Acting NRC Senior Resident Inspector, San Onofre Units 1, 2&3 3

M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 l

i