Forwards Primary Reactor Containment Integrated Leakage Rate Test Rept, Per Tech Spec 6.9.3.0 & 10CFR50 App J,Section V.B. W/Guidance of Reg Guide 10.1
ML20039B678
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/11/1981
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20039B679 List:
References
NUDOCS 8112230388
Download: ML20039B678 (2)


Text

__ -

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 g

3 D

1881 1981 PHILADELPHI A, PA.19101 8

(215: e41-4000 lig 9

IC' b DE0

' V3c 2g i

//."bljf jrf@

December 11, 1981 Docket No. 50-278 Director Office of Nuclear Reactor Regulation l

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn:

Document Control Desk

Dear Sir:

Attached is the report of the Peach Bottom Atomic Power Station Unit 3 Reactor Containment Building Integrated Leak Rate Test which was conducted during September of 1981.

This report is submitted pursuant to Technical Specification 6.9.3.d and 10CFR50 Appendix J, Section V.S.

with the guidance of Regulatory Guide 10.1.

/ ol7 1I 8112230388 81121'1~~

PDR ADOCK 05000278 P

PDR

Page 2 You will note that the first attempted test (September-4, 1981) terminated due to high leakage at -pressure transmitter PT-3-5-12.

This matter is further addressed in response to 4

Inspection Report 278-81/21 (S.L. Daltroff PECo to R.R. Keimig, U.S.NRC,. November 13, 1981) which discusses the. facts surrounding the pressure transmitter failure.

During the refueling outage, an o-ring was inadvertently left out of place upon the repair of this instrument.

Upon isolation of this device, the test was successfully conducted with the final test results well within acceptable limits.

Subsequent to the test, this transmitter was repaired and tested satisfactorily.

Should there be any further questions, do not hesitate to contact me.

Engineer-In-Charge Nuclear Section Generation Division JCN:lrg cc:

R. C.

Haynes, Director Region I Office of Inspection & Enforcement U.S.

Nuclear. Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 C. J. Cowgill Site Inspector P.O.