D ALTIMORE GAS AND ELECTRIC CHARLES CENTER e P.O. BOX 1475
- BALTIMORE. MARYLAND 21203-1475 1
GroRot C CREEL viet F ais e t~,
Nsc6c w Estaov
()M aec 4 4 u May 29,1991 U. S. Nuclear Rcgulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant l
Unit No. 2 ; Docket No. 50-317 Reactor Containment Buildine Intecrated Leak Rate Test Report l
Gentlemen:
As required by 10 CFR 50, Appendix J, a successful Unit 2 Containment Building Integrated Leak l
Rate Test was completed on January 16,1991. The associated test report is attact.d.
10 CFR 50 Appendix 3 requires a separate accompanying summary report if the combined Local Leak Rate Tests (LLRT) fail to meet their acceptance criteria. As the combined LLRTs did not meet the as-found test acceptance criteria, a separate accompanying report is attached as Appendix IL Should you have any questions regarding this report, we will be pleased to discuss them with you.
t Very truly yours, 1
66 1
GCC/PSFirej/ dim l
Attachment 9
I ',d
- y.frsorm a 920 m smcx mooom.
E.
i Document Control Desk hby 29,.'991 Page 2 cc:
(W th Attachment)
L E. Nicholson, NRC T. T. Martin, NRC (With( ut Attachment)
D. A. h.une. Esquire J. E. Sill.:rg Esquire R. A. Cai.ra, NRC D. G. MeDonald, Jr., NRC R.1. Melsin, DNR J. II. Walte.i PSC i
1 l
't t
.\\
l
\\
l
\\
\\
t
\\s