Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards 10CFR71 QA Program". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20069D137  + (Forwards 10CFR50.59 Safety Evaluation Summary Rept for Callaway Nuclear Plant of Changes,Tests & Experiments Since 920612 Submittal & Through 931130)
  • ML20086Q320  + (Forwards 10CFR50.59 Safety Evaluation of Changes to Existing Fire Protection Program Plan Made During Development of Decommissioning Fire Protection Plan)
  • ML20212H252  + (Forwards 10CFR50.59 Safety Evaluations Quarterly Rept, 861017-1231, Per Reporting Requirements Outlined in Util)
  • ML20237H302  + (Forwards 10CFR50.59 Safety Evaluations Quarterly Rept for Apr-June 1987)
  • ML20235V460  + (Forwards 10CFR50.59 Safety Evaluations Quarterly Rept, Oct-Dec 1988)
  • ML20135E671  + (Forwards 10CFR50.59 Summary Rept Facility Changes,Tests & Experiments for Davis-Besse Nuclear Power Station,Unit 1, 941116-960602)
  • ML20135E673  + (Forwards 10CFR50.59 Summary Rept Facility Changes,Tests & Experiments for Davis-Besse Nuclear Power Station,Unit 1, 941116-960602.)
  • 1CAN109502, Forwards 10CFR50.59 Summary Rept for 1994,containing Brief Description of Changes in Procedures & in Facility as Described in SAR  + (Forwards 10CFR50.59 Summary Rept for 1994,containing Brief Description of Changes in Procedures & in Facility as Described in SAR)
  • ML20132D022  + (Forwards 10CFR50.59 Summary Rept for Period from 940619-960618 Which Consists of Descriptions & SE Summarizes for Changes to Facility & Procedures as Described in SAR)
  • ML20132D027  + (Forwards 10CFR50.59 Summary Rept for Period from 940619-960618 Which Consists of Descriptions & SE Summarizes for Changes to Facility & Procedures as Described in SAR)
  • ML20196B513  + (Forwards 10CFR50.59 Summary Rept of Facility Changes,Tests & Experiments for Dbnps,Unit 1 for 960602-980523. SEs Did Not Involve Unreviewed Safety Question)
  • ML20154Q966  + (Forwards 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2, Reflecting Changes Through 980420,which Consistent with Current Rev 8 of Vogtle Generating Plant FSAR)
  • ML20065L472  + (Forwards 10CFR50.59(b) Rept of Facility Changes,Tests & Experiments 920601-931022 Vogtle Electric Generating Plant Units 1 & 2, Reflecting Consistency W/Rev 4 of UFSAR)
  • 3F1296-09, Forwards 10CFR50.59(b)(2) Rept of Evaluations Which Have Resulted in No Unreviewed Safety Questions for Mods or Procedure Changes  + (Forwards 10CFR50.59(b)(2) Rept of Evaluations Which Have Resulted in No Unreviewed Safety Questions for Mods or Procedure Changes)
  • L-96-112, Forwards 10CFR50.61 Evaluation of PTS of Rv Beltline Matls, Completing Commitment in .Proprietary & Nonproprietary Versions of CEOG Rept, Application of Rv Surveillance Data... Also Encl.Proprietary Rept Withheld  + (Forwards 10CFR50.61 Evaluation of PTS of Rv Beltline Matls, Completing Commitment in .Proprietary & Nonproprietary Versions of CEOG Rept, Application of Rv Surveillance Data... Also Encl.Proprietary Rept Withheld)
  • ML17228B498  + (Forwards 10CFR50.61 Evaluation of PTS of Rv Beltline Matls, Completing Commitment in 951124 Ltr.Proprietary & Nonproprietary Versions of CEOG Rept, Application of Rv Surveillance Data... Also Encl.Proprietary Rept Withheld)
  • ML17223A501  + (Forwards 10CFR50.62 Implementation Status for Plant ATWS Mods,Per 890301 Meeting W/Nrc.Production of Auxiliary Feedwater Actuation Sys Matrix Relay Cards by C-E Complete & Cards Delivered to Plant Site)
  • ML20065H378  + (Forwards 10CFR50.9 LAR Root Cause Analysis Rept Results for Inaccurate Info Supplied in 930401 LAR Re Onsite Power Distribution Sys,Ac Distribution - Operating)
  • ML20063H309  + (Forwards 10CFR50.9 Notification Re Erroneous Info Supplied in Lar,Dtd 930401,revising TS 3.8.2.1, Onsite Power Distribution Sys,Ac Distribution - Operating)
  • ML20055D269  + (Forwards 10CFR61 on Licensing Requirements for Land Disposal of Radwaste & Background Info on Agreement State Program)
  • ML20011D779  + (Forwards 10CFR61, NRC Regulations Governing Disposal of Low Level Radwaste & Part 61 Guide.W/O Encls)
  • ML20205G486  + (Forwards 10CFR70 License & Ser.Incorporation of Conditions, Including Listed Util Commitments,Re Fresh Fuel Storage Into 10CFR50 License Suggested.Nrr Should Revise Any Util Request to Deviate from Listed Commitments.W/O Encls)
  • ML20205G665  + (Forwards 10CFR70 License & Ser.Incorporation of Conditions, Including Condition 11,limiting Use of Spent Fuel Racks for Dry Storage of Fresh Fuel Assemblies to Alternate Rows,Into 10CFR50 License Suggested.W/O Encls)
  • ML20205G553  + (Forwards 10CFR70 License,Amends & Sers.Incorporation of 10CFR50 License Suggested Conditions Into Condition 25, Issued on 860723,authorized Dry Storage of Fresh Fuel Assemblies in Containment Fuel Storage Pool.W/O Encls)
  • ML20054F379  + (Forwards 10CFR71 App E-Acceptance Criteria-Transportation Packages for Normal/Special Form Radioactive Matl. Document Acceptable for Establishing QA Programs for Normal/Special Form Matl.W/O Encl)
  • ML20214M319  + (Forwards 10CFR71 QA Program for Evaluation.Fee Paid)
  • ML20057B909  + (Forwards 10CFR71 QA Program for Industrial Radiography & Sealed Sources for Review & Approval)
  • ML19332F058  + (Forwards 10CFR71 QA Program for Industrial Radiography. Vendor Intends to Transport Radioactive,Byproduct Matl to Other NRC Region V States to Perform Radiography at Temporary Job Sites.Fee Paid)
  • ML19263B299  + (Forwards 10CFR71 QA Program for License 35-13735-01)
  • RA-98-024, Forwards 10CFR71 QA Program for Shipment of 239 Plutonium- Beryllium Neutron Sources, for Review & Approval  + (Forwards 10CFR71 QA Program for Shipment of 239 Plutonium- Beryllium Neutron Sources, for Review & Approval)
  • ML20217E510  + (Forwards 10CFR71 QA Program for Shipment of 239 Plutonium- Beryllium Neutron Sources)
  • ML19319C851  + (Forwards 10CFR73, Requirements for Physical Protection of Nuclear Power Plants & NRC 770930 Position on Personnel Search Requirements)
  • ML19260D022  + (Forwards 10CFR73.Indicates Licensee Responsibility to Meet All Rules Applicable to Facility.W/O Encl)
  • ML20215L199  + (Forwards 10CFR74 Fundamental Nuclear Matl Control Plan for License SNM-1107.Part 74 of Plan Should Be Made Effective on 870401.Plan Withheld (Ref 10CFR2.790(d)))
  • ML20070E066  + (Forwards 10th Edition of Integrated Implementation Schedule (Iis) for Songs,Units 2 & 3.Preliminary Cycle 9 Scope of Work Still Being Developed & Should Be Included in 11th Edition of IIs)
  • ML13317B261  + (Forwards 10th Edition of Integrated Implementation Schedule.Design Basis Precipitation Mods to Rooftop Drainage & Scuppers Completed)
  • ML20147C702  + (Forwards 10th Monthly Rept for Jun-Jul 78 for Nrc/Rsr Re Progress of Core Meltdown Research Project in GE)
  • ML20147B980  + (Forwards 10th Monthly Rept for Nrc/Rsr Re Progress on Project Kernschmelzen(Core Meltdown Research Project))
  • ML20147B985  + (Forwards 10th Monthly Rept for Nrc/Rsr Re Progress on Project Kernschmelzen(Core Meltdown Research Project))
  • ML20236C097  + (Forwards 10th Update to Sequoyah Activities List (Sal),Per 860717 Submittal of Performance Plan.Sal Status Info in Encl 1 & Table 1.SAL Items W/Program Area Changes Listed in Encl 2.Update Includes Info Through 870921)
  • ML17297A438  + (Forwards 11 Drawings Describing Location & Distribution of Bulk Hydrogen Storage Facility,In Response to NRC Round One Question 430.43.Aperture Cards Are Available in PDR)
  • ML20199J856  + (Forwards 11 Drs Identified During Review Activities for ICAVP & 9 Drs Which Nu Resolutions Have Been Reviewed & Accepted by S&L)
  • ML19207B151  + (Forwards 11 Letters of Comment Re 10CFR30,petition That NRC Be Divided Into Two Separate Entities,One Responsible for Fissile Matls & Another for Byproduct Matls.W/O Encl)
  • ML20050B402  + (Forwards 11 Oversize Drawings & Associated Info Re Seismic Trip Sys,In Response to Commitment in Util . Drawings Will Be Incorporated Into Amend 29 to Fsar.Aperture Cards Are Available in PDR)
  • ML18142A139  + (Forwards 11 Oversize Figures & Tables Inadvertently Omitted from Distribution List for Rev 2 to Updated FSAR Re Evaporator & Neutralization Sys)
  • ML19329A545  + (Forwards 11 Pages of FSAR Re Containment Peak Pressure & Internal Pressure Differential in Response to Rc Deyoung 721020 Technical Assistance Request.Addl Info to Be Submitted by 721120)
  • ML20126D533  + (Forwards 11 Petitions to Intervene & Requests for Hearing, Notice of J Mcphillips Appearance & Motion for Extension of Time to File Petitions to Intervene.Certificate of Svc Encl)
  • ST-HL-AE-1165, Forwards 110 Oversize Electrical & Instrumentation & Control Drawings,Per Section 1.7 of Reg Guide 1.70 & NRC Question 032.01.Aperture Cards Available in PDR  + (Forwards 110 Oversize Electrical & Instrumentation & Control Drawings,Per Section 1.7 of Reg Guide 1.70 & NRC Question 032.01.Aperture Cards Available in PDR)
  • ML20244B771  + (Forwards 115-kV Capacitor Bank Design Rept. Util Position Re Enhancements to Plant Offsite Power Sys Clarified. Capacitor Bank Fully Operational)
  • ML13324A936  + (Forwards 11th Edition of Description of Progress on Selected Regulatory Projects.No Changes Reported)