Forwards 10CFR50.59 Summary Rept for Period from 940619-960618 Which Consists of Descriptions & SE Summarizes for Changes to Facility & Procedures as Described in SAR
ML20132D022
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/12/1996
From: Tulon T
COMMONWEALTH EDISON CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132D027 List:
References
BW-96-0096, BW-96-96, TAC-M86432, TAC-M86457, TAC-M86458, TAC-M86459, TAC-M86460, TAC-M86461, TAC-M86462, TAC-M86463, TAC-M86464, TAC-M86465, TAC-M86466, TAC-M86467, NUDOCS 9612190118
Download: ML20132D022 (2)


Text

.

. _...__ _ =___ -.. - -..-. _.-___. _.

Commonwealth lithon Company firaidwood Generating Station Houte al, flox H I l

liraces ille, li. 9)io7-9619 Tel Hlkl58 2801 t

f December 12,1996 l

BW/96-0096 l

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Document Control Desk

't

Subject:

Braidwood Stations Units 1 and 2 i

10 CFR 50.59 Summary Report,

NRC Docket Nos. 50-456 and 50-457

Reference:

June 15,1993 letter, J. B. Hickman (NRC) to D. L. Farrar (Comed),

Commonwealth Edison Proposal for Updated Final Safety Analysis Report Revision Submittal Frequency (TAC Nos. M86432, M86457, M86458, M86459, M86460, M86461, M86462, M86463, M86464, J

M86465, M86466, and M86467) j Pursuant to the requirements of 10 CFR 50.59 (b)(2), Braidwood Station is submitting the enclosed report. This report covers the period from 6/19/94 through 6/18/96, and consists of descriptions and safety evaluation summaries for changes to'the facility and procedures as described in the safety analysis report. No tests or experiments foyerned by paragraph (a) of 10 CFR 50.59 were performed. Also included as part of this report are changes made to features of the Fire Protection Program not previously presented to the NRC Staff.

The subject report is being submitted to coincide with the UFSAR and Fire Protection Report updates consistent with the provisions of 10 CFR 50.59 (b)(2). Updates to the lf UFSAR and Fire Protection Report will be submitted under separate cover. Note that the UFSAR and Fire Protection Report updates are currently submitted every 24 p

months in accordance with the provisions of 10 CFR 50.71(e)(4). In the referenced 16k I letter, the Staff agreed with Comed's proposal to provide updates to the NRC no later than 24 months from the submittal date of the previous revision.

55612190118 961212 PDR ADOCK 05000456 R

PDR g [L M

[^

L4L i

i w

W unicom o,mn.my

L 1

r Document Control Desk December 12,1996 l

Page 2 Please direct any questions regarding this submittal to Wallace Kuk at Braidwood Site Engineering Department, (815) 458-2801, extension 2656.

Very truly yours,

~

/

l

,/ /

/

fp/g

~

'" 9 1

ff T. J. Tulon Station Manager Braidwood Nuclear Station TJT/WWK/gtv Enclosure cc:

C. Phillips, Senior Resident Inspector - Braidwood R. R. Assa, Braidwood Project Manager - NRR A. B. Beach, Regional Administrator - Region III H. D. Pontious - NLA, OPUS T. W. Simpkin - Regulatory Assurance Supervisor, Braidwood E. W. O'Donnell - Site Engineering L. A. Lahti - Regulatory Assurance, Byron l

i