ML20135E671
| ML20135E671 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/02/1996 |
| From: | Jeffery Wood CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20135E673 | List: |
| References | |
| 2419, NUDOCS 9612110413 | |
| Download: ML20135E671 (1) | |
Text
I CENTEREOR ENERGY M01 N. State Route 2 419-249-2300 John K. Wood Oak Harbor,OH 43449 FAX: 419-321-8337 Vce Presdent - Nuclear Davis-Besse Docket Number 50-346 b
License Number NPF-3 Serial Number 2419 December 2, 1996 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
Subject:
10 CFR 50.59 Report of Facility Changes, Tests and Experiments The Toledo Edison (TE) Company hereby submits, pursuant to 10 CFR 50.59 (b)(2), the attached 10 CFR 50.59 Summary Report of Facility Changes, Tests and Experiments for Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS).
4 The DBNPS 10 CFR 50.59 changes, tests and experiments identified via the l
safety evaluation process during the reporting period of November 16, 1994 l
through June 2, 1996 are included in the report. This report includes facility changes that occurred during operating fuel Cycle 10 and the Tenth Refueling Outage which concluded on June 2, 1996. This report contains a summary listing of the changes, tests.and experiments included in the report. These safety evaluations did not involve an unreviewed safety question.
If you have any further questions concerning this matter, please contact Mr. J. L. Freels, Manager - Regulatory Affairs at (419) 321-8466.
Very truly yoars, f
1 J /laj
,f
{
Attachment cc:
A. B. Beach, Regional Administrator, NRC Region III A. G. Hansen, DB-1 NRC/NRR Project Manager (I,/
S.
Stasek, DB-1 NRC Senior Resident Inspector
(
}
Utility Radiological Safety Board j
9612110413 961202 PDR ADOCK 05000346 R