ML20196B513
| ML20196B513 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/23/1998 |
| From: | Jeffery Wood CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20196B517 | List: |
| References | |
| 2573, NUDOCS 9812010120 | |
| Download: ML20196B513 (1) | |
Text
.
i E"
- nB" Davis Besse Nuclear Power Statoon EE 5501 North State Route 2 l
m Oak Harbor Ohro 43449-9760 John K. Wood 419-249-2300 Vice President - Nuclear Fax: 419 321-8337 Docket Number 50-346 License Number NPF-3 Serial Number'2573 i
. November 23, 1998 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
]
l
Subject:
10 CFR 50.59 Report of Facility Changes, Tests and Experirnents Ladies and Gentlemen:
The Toledo Edison (TE) Company hereby submits, pursuant to 10 CFR 50.59 (b)(2), the attached 10 CFR 50.59 Summary Report of Facility Changes, Tests and Experiments for the Davis-Besse Nuclear Power Station, Unit No.1 (DBNPS).
The DBNPS 10 CFR 50.59 changes, tests and experiments identified via the safety evaluation process during the reporting period of June 2,1996 through May 23,1998 are included in the report. This reporting period includes operating fuel Cycle 11 and the Eleventh Refueling Outage, which concluded on May 23,1998. These safety evaluations did not involve an unreviewed safety question.
If you have any further questions concerning this matter, please contact Mr. J. L. Freels, Manager - Regulatory Affairs at (419) 321-8466.
Very truly yours,
/
C
)
/
J M/laj Attachment
' cc: J. L. Caldwell, Acting Regional Administrator, NRC Region III I
S. J. Campbell, DB-1 NRC Senior Resident Inspector t
A. G. Hansen, DB-1 NRC/NRR Project Manager Utility Radiological Safep Board
[S
- ,. u l
e 9812010120 981123 1
i PDR ADOCK 05000346 R
):::
l