Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134K430 + (Discusses power-flow Stability Tech Specs Re Installation of BWROG Enhanced Option 1A)
- BECO-LTR-96-094, Discusses power-flow Stability Tech Specs Re Installation of BWROG Enhanced Option 1A + (Discusses power-flow Stability Tech Specs Re Installation of BWROG Enhanced Option 1A)
- ML20211Q678 + (Discusses pre-decisional Documents Re Notice Protected from Public Disclosure by Federal Law)
- ML20236P087 + (Discusses pre-decisional Enforcement Conference Held on 980618 in King of Prussia,Pennsylvania Re Radiological Controls Deficiencies Experienced During Replacement of Nuclear Instrumentation in Unit Reactor Annulus on 980409)
- ML20090J298 + (Discusses pre-exam Review of Multisite Lsro License Written Exam & Requests Concerns for Inclusion of Written Exam Grading Process by NRC)
- ML20127A384 + (Discusses re-centralization of OL Activities.Recommends That Commission Direct Staff to Perform Study of Pros & Cons of Recentralizing OL Function)
- ML19210B128 + (Discusses re-evaluation of ECCS Cooling Performance to Conform W/Acceptable Evaluation Model Under Provisions of 10CFR50.46,break Spectrum & Partial Loop Operation Boron Precipitation,Single Failure & Submerged Valves)
- ML19326C681 + (Discusses re-evaluation of ECCS Performance Using NRC Approved Model Per NRC 761207 Request.Evaluation Model Based on BAW-10104A,Revision 1.Question to Be Closed Upon Receipt of NRC Approval of B&W Revision to Model)
- ML17303A778 + (Discusses re-exam of Diesel Generator Cooling & Essential Cooling Water Sys on Plant,Per 850530 Commitment.No Evidence of Microbiologically Induced Corrosion or Stress Corrosion Cracking Observed)
- L-81-484, Discusses re-exam of Stretch Power Application Re Sections 7.2.3 Loss of All Non-Emergency AC Power Event, & 7.3.4, Seized Rotor Event, Per Request + (Discusses re-exam of Stretch Power Application Re Sections 7.2.3 Loss of All Non-Emergency AC Power Event, & 7.3.4, Seized Rotor Event, Per Request)
- ML19248D764 + (Discusses re-execution of Mainstream Analysis Extending Analysis from One to Four Seconds for 5% & 2% Damping. Determines That Structural Loading Functions Had Decayed to Insignificant Levels)
- ML20212E301 + (Discusses risk-informed Regulation Seminar Held on 971028,re Background on PRA Policy Statement,Scope of risk-informed Regulation,Staff Expectations,Staff Responsibilities & Proposed Acceptance Criteria.Viewgraphs Encl)
- ML17158A775 + (Discusses s in Response to NRC 950509 Correspondence.Informs That NRC Does Not Concur W/Stated Disagreement Re Deliberate Nature of Recipient Conduct & Only Info Concerning Personal Nature Can Be Withheld Re NOV)
- ML19296A800 + (Discusses safety-related Areas Affecting NRC Regulatory Requirement Adequacy,In Response to 790928 Request.Should Direct Resources Toward Mod Recommendations Previously Submitted.List of Specific Supportive Refs Encl)
- ML20213E174 + (Discusses safety-related Equipment Review as Result of 820426-27 Site Visit.All Equipment & Piping Provided W/Tornado Missile Protection Except Spray Trees & Diesel Generator Exhausts)
- ML20209F470 + (Discusses safety-related Incidents at B&W Reactors.Nrc 860415 Response in Conflict W/V Stello 860430 Memo Re Validating Computer Code Concerning B&W Plant Behavior.Reply to Listed Questions Requested by 870215)
- U-601075, Discusses safety-related Instrument Tubing Program,In Response to NRC .Summary of Sample Results Encl. Insp Results Indicate That Instrument Tubing Welds of Acceptable Quality + (Discusses safety-related Instrument Tubing Program,In Response to NRC .Summary of Sample Results Encl. Insp Results Indicate That Instrument Tubing Welds of Acceptable Quality)
- L-94-059, Discusses safety-related MOV Testing & Surveillance,Per Generic Ltr 89-10 + (Discusses safety-related MOV Testing & Surveillance,Per Generic Ltr 89-10)
- ML20149G806 + (Discusses safety-related MOV Testing & Surveillance Schedule Extension)
- ML20091B218 + (Discusses safety-relief Valve Tech Spec Changes)
- ML20211F635 + (Discusses self-assessment Evaluation for FY98 Including Metrics & Evaluation of Performance Using Metrics)
- ML20070W235 + (Discusses self-initiated Audits Re QA Program,Hvac,Design Control Quality Confirmation Program,Stress & Hanger Analysis for Cable Spread Room & Cable Info Sys Program. List of Proposed 1983 Audits Encl)
- ML20213D709 + (Discusses short-term Atmospheric Diffusion Analysis.Revised Relative Concentration Values Are Less Conservative than Preliminary Values)
- ML20129F132 + (Discusses steady-state Service Water Sys Hydraulic Characteristics During Design Basis Accident)
- ML19261D158 + (Discusses stem-mounted Limit Switches on Testable Check Valves in Core Spray Sys,As Previously Discussed in Utils .These Switches Are Not Needed for ECCS Function)
- ML20217D723 + (Discusses thermal-hydraulic five-yr Research)
- ML20151F136 + (Discusses three-month Ofc of Enforcement Rotational Assignment Completed on 880702)
- ML20211F643 + (Discusses three-tiered Sys to Measure Performance Against Desired Outcomes,Goals & Process Improvement)
- ML20212G250 + (Discusses through-wall Cracks Found in Main Steam Bypass Lines at Facility in Sept 1985.Mods,admittedly Compromised Because of Physical Limitations & Cost,Appear to Have Been Done W/O Going Significantly Beyond Applicable ASME Codes)
- ML17187B091 + (Discusses through-wall Cracks Identified by Util in Inlet Nozzles to Reactor Water Clean Up Nonregenerative Heat Exchangers in Both a & B Trains.Forwards SE Approving Weld Overlay Repair)
- ML20207M470 + (Discusses to Baggett Which Forwarded to Us NRC Region I Ofc Reporting Transfer of Eight Devices for Use Under Specific License to Use Under General Licenses)
- ML17262A937 + (Discusses to AR Johnson Re 911018 Meeting at King of Prussia,Pa Concerning Possiblity of Utilizing Quality Codes Utilized by Plant Process Computer Sys)
- ML20030D273 + (Discusses to All SEP Owners Re NRC Acceleration Value for Facility.Ltr Appears to Answer ASLB Questions in Recent Order.Nrc Seismic Acceleration Value Fixed)
- ML20114C599 + (Discusses to B Garde.Ofc of Inspector & Auditor Not Notified Prior to Ltr Committing to Rept in 1 Month. Attempt Will Be Made to Meet 1-month Commitment)
- ML20198N001 + (Discusses to Chairman Jackson Repeating Key Points Discussed During 971114 Meeting & Again Requesting Chairman Visit Millstone Area.Chairman Tentatively Planning Visit to Millstone Site in Early February)
- ML20138P424 + (Discusses to Commanding General Re Change in AEC License.Listed Factors May Clarify Application)
- ML20245D658 + (Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs)
- ML20216E159 + (Discusses to Former Chairman Jackson Re Role of Defense in Depth in risk-informed Regulatory Sys.Commends Committee for Thoughtful & Useful Rept on Historical Role on Defense in Depth & Need to Reshape Role on Key Issues)
- ML20211K375 + (Discusses to Former Chairman SA Jackson,Which Requested Certain Info Related to Federal Grant Funds Provided to States.Nrc Has Not Made Any Grants to State During FY97,98 & 99)
- ML19344D558 + (Discusses to HR Denton.Notifications Per Tech Specs 2.3.A.7 or 2.3.B.8 Should Include Dose Assessment Illustrating Compliance w/40CFR190)
- ML20247K307 + (Discusses to Hl Thompson Requesting Info About Safety Benefits of Adopting Quality Mgt Program & Misadministration, 10CFR35 Amend Effective on 920127. Statement of Consideration That Supports Program Encl)
- ML20045B212 + (Discusses to J Johnson Re Confidence Limits)
- ML20059C770 + (Discusses to J Taylor of Allegations Against NRC Re Early Component Removal Project.Informs Licensee of No Objection Re Removal of Four Sg,Pressurizer & Portions of Intervals from Plant & Site.W/Encl)
- ML20127J456 + (Discusses to Jn Grace Re IE Info Notice 85-01, Continuous Supervision of Irradiators. Consequences of Incident Involving Radiopharm Could Far Outweigh Cost of Trained Supervisor Attendance During Irradiator Operation)
- ML20138E515 + (Discusses to Ke Perkins Requesting That NRC Take Enforcement Action Against Arizona Public Svc Co Per 10CFR2.206)
- ML20046B177 + (Discusses to Murley Informing NRC of Computer Software Program Developed by Recipient Company to Evaluate Reliability of Substations)
- ML19310A476 + (Discusses to NRC Expressing Concern Re Arrangements for Recent Meeting at Plant.Meetings Between NRC & Licensees Are Open to Public in Most Cases.Public Announcement Was Issued on 800331,well Before Meeting Date)
- ML20154B293 + (Discusses to NRC Providing Document Entitled, Description of Closure Plan in Application for Termination of Radioactive Matl License L01634 Submitted by Conoco,Inc. Approval to Proceed W/Site Reclamation Activities Granted)
- ML19321B091 + (Discusses to NRC Stating That Figure 4 of SECY- 80-107 Is Erroneous.Thermodynamics of zirconium-steam Reaction Were,In Fact,Considered in NRC Calculations. Discussion Paper Re Thermodynamic Considerations Encl)
- ML20206G741 + (Discusses to P Lohaus Re Us Army Corps of Engineers Plan to Ship Waste Containing Source Matl & Lead from Lake City Army Ammunition Plant to RCRA-permitted Disposal Facility in Texas)
- ML20211F979 + (Discusses to T Maiman Informing of Increased Number of Allegations Received from Zion Station Personnel Re Chilled Environ at Facility for Raising Safety Concerns.Requests That Issue Be Discussed During Meeting)