Discusses safety-relief Valve Tech Spec Changes
ML20091B218
Person / Time
Site: Monticello 
Issue date: 09/08/1977
From: Mayer L
NORTHERN STATES POWER CO.
To: Desiree Davis
Office of Nuclear Reactor Regulation
References
NUDOCS 9105300376
Download: ML20091B218 (5)


Text

l MSE3 NORTHERN 5TATES POWER COMPANY M O N N E A POLle. MIN N E s oT A e s 4 01 l

1 "N

September 8, 1977 op, s

g v

F Mr D K Davis, Acting Chief Ip Operating Reactors Branch #2

$ig w

Division of Operating Reactors T

c/o Distribution Services Branch, DDC, Atti t' S Nucicar Regulatory Commission y

wshington, DC 20555 g

i

Dear Mr Davis:

MONTICELLO NUCLEAR GENERATING PIRIT Docket No. 50-263 License No. DPR-22 Safety-Relief Valve Technical Specification Changes Your letter dated August 3,1977 requested us to submit a License Amendment Request revising the limiting conditions for operation and surveillance re-quirements for the safety-relief valves installed at the Monticello Nuclear Generating Plant.

We were asked to base our License Amendment Request on model technical specifications enclosed with your letter and to make our sutunittal within 30 days of receipt of your letter.

We will be unable to meet your schedule for submitting a License Amendment Request. Our review of the: NRC model technical specifications has identified a number of areas which require further discussion with you and clarification before a License Amendment Request can be submitted.

These areas are sum-marized in the attached table.

We do not believe that immediate action is required on the proposed technical specification changes for Monticello since they will not significantly improve safety-relief valve reliability. The existing surveillance program provides a high degree of assurance that the.,e valves will function when required.

It should also be noted that Monticello has not experienced the large number of safety-relief valve failures noted in your letter.

During the last five years of plant operation we have experienced one failure of a safety-relief valve to open, one failure of a redundant automatic depressurization initiation logic circuit, and one instance of premature safety-relief valve actuation. None of these failures caused the safety-relief valve installation to be incapable of performing its safety related functions.

Further assurance of relief capability is provided through the installed spare safety-relief

valves, t

NSP has been cooperating with the General Electric Company in their program for 12nproving the perforance of BWR safety-relief valves. This program u.

9 05300376 770900 7

7g{

p & ADOCK OSO 6

NOFs s'HERN CTATED POWER COMPAN'/

Mr D K Iktvis Page 2 September 8, 1977 has been described in detail to the Conanission's technical staff in meetings with General Electric.

We are ready to discuss this matter with you at any time, either by telephone or through a maeting with you, other BWR utilities, and the General Electric Company. When the areas in your proposed technical specifications needing clarification have been resolved, we will submit a License Amendment Request if the requirement for revised technical specifications still exists.

In the interim period, we will continue to perfonn safety-relief valve testing and accumulate reliability data in accordance with the existing comprehensive surveillance program contained in the technical specifications. A visual inspection of safety-relief valve line restraints, including those in the torus, will be conducted during the Autumn 1977 refueling outage.

Yours very truly, L 0 Mayer, PE Manager of Nuclear Support Services a t tachmer ;

LQ1/atM/deh cc: J G Keppler G Charnoff MPCA Attn: J W Fennan i

l l

l

_~.

5 i

Attachment to L 0 Mayer letter dated September 8,1977

)

5 2

Areas of NRC Model Safety-Relief Valve Technical Specifications (dated August 3.1977) Needing Clarification Specification No.

Problem Area 3.4.2 The requirement for safety-relief valve oper-

]

ability above 212 F or with the Mode Switch in Run or Startup does not recognize the fact that operability cannot be demonstrated until the reactor is pressurized, j

]

The model does not recognize the possibility of installed spare safety-relief valves.

Spare valves are not explicitly excluded from the Action statement in the event of inoperability.

4 The action statement requires going to cold l

shutdown if operability is not restored within 15 minutes even if the inoperable component is made operable in the course of shutdown and cooldown.

3.5.2 The model requires Automatic Depressurization System (ADS) operability above 212 F or with the Mode Switch in Run or Startup.

The system-j is not required to be functional below 150 peig or if irradiated fuel is not in the reactor vessel.

Action statament (a) requires going to cold shutdown if operability is not restored within l

14 days even if operability is restored in the i

course of shutdown and cooldown.

I 4.4.2.1 Increasing surveillance frequency in accordance with Table 4.4-10 may lead to increased valve failure.

Emperience has shown that increased i

valve cycles may reduce reliability.

Table 4.4-10 states a surveillance frequency l

which depends on number of failures in the past.

No recognition is given of dhe fact that the i

cause of failure may have been found and corrected.

j Valve failure from unknown causes results in the same surveillance frequency adjustment that a failure accompanied by a positive correction results in.

l Testing at nominal operating pressure is specified.

Valve design suggests that low pressure testing is more demanding.

Furthermore, we believe that i

Areas of NRC Model Safety-Relief Valve Technical Specifications (dated August 3.1977) Needing Clarification (Continued) l Specification No.

Problem Area 4.4.2.1 (continued) valve operability should be verified as soon as possi-bic af ter r.eaching plant conditions requiring oper-ability. Current technical specifications require operc ability prior to reaching 110 psig when temperature is above 345 r.

Operability is verified when pressure is sufficient to allow proper functioning of the reactor pressure control system (about 170 psig).

Testing at or below five percent rated power is specified. We believe that this restriction should be removed.

This power level lies in an ill defined region between the intermediate and power ranges and is difficult to determit.e with precision. Testing at higher power leve?.o should be permitted to alleviate this probicm ard to permit more flexibility in scheduling testing.

4.4.2.2 The applicable ASME Code and Addenda are referenced.

This should be replaced with a general reference to 10 CFR 50, Section 50.55a(g) to eliminate the requirement for a technical specification revision each time the program of inservice inspection and testing is revised.

4.5.2 See comments above on Section 4.4.2.1 and 4.4.2.2.

DISTRg10N AFTER XS5UAXE VQUFt.fiXIIW Lac...ac.

u s. nucle Am mtovLATony c uusssicN occatTNuusem 1C romu 195

$D - 2 63 No.C DISTRIBUTION con PART 50 DOCKET MATERIAL oATsorcoCUutNT I

tr. D. E. Davis F ROM: ggp 09/08/77 Minneapolis, Minnesota 55401 DAT8 *ECE8vC D L.

D. Mayer 09/13/77 ONoTom:2ao P mon iNPv7PomM Nvusta or ccaits escrivto

.aTT n ConiciNAL QuNcLAssir es o 7conv G or b-3-7 7 M4 I 00 sNcLowmt

$CatPTioN Advising that NSP is unabic to meet NRC's schedule for submitting a License Amend Request revising the limiting conditions for operption and surveillance requirements for the safety-relief valves installed at Monticello due to lack of clarification in NRC's model tech specs, w/att list of areas needing clari fication...

1 2p + 2p

'h

' 'LANT NMfE:

MONTICELLO Jcm 09/14/77 VD EMcL Y I

SAFETY FOR ACTION /lNFORMATION 1 I BRANCH CHTEF: (7)

,%d t 5 i

i I

I i

INTERNAL DISTRIBUTION G M ILD 3 NRu vut<

ICE (2) l OELD iHANAUER CHECK STELLO EISENHUT SHA0 I

BAER BUTLER GRIMES J. COLLINS 60$$/0L EXTERNAL DISTRIBUTION CONTROL NUMBER l

lLPDR: MjMNEAMLIS M/N' pp-'

1 C

16 CYS ACRS SENT CATEGOF;Y J l

'