Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035G591 + (Discusses Status of Staff Implementation of Oia Recommendations Re NRC Backfit Procedures in Response to 910829 Memo)
- ML20084M019 + (Discusses Status of Steam Generator Tube Rupture Guidelines & Procedures Review.Matl Presented During 830428 Site Visit Preliminary W/Consistencies & Handwritten Corrections. Overall Strategy & Options Must Be Clarified)
- ML20028A138 + (Discusses Status of Stenographic Reporting Contract.Div of Contracts Proposes Negotiated Procurement So Technical Approach,Personnel & Mgt of Proposing Firms Will Be Primary)
- ML19322C593 + (Discusses Status of TMI Incident Re Discussion W/Governor of Pa,H Denton,Secy of Hew & D Costle,Rept 2)
- ML19305F533 + (Discusses Status of TMI-1 Restart Hearings.By Wk of 810427, Mgt Issues Will Be Closed & First Phase of Hearing on Emergency Planning Contentions Will Be Completed.By mid- June,Record on Emergency Planning Will Be Completed)
- ML19291C067 + (Discusses Status of Task A-17)
- ML20126M362 + (Discusses Status of Technical Assistance Effort for Ofc of General Counsel Re Mill Tailings Regulations.Reply Briefs Filed & Oral Arguments Heard.Nrc Awaiting Court Ruling)
- ML20126M280 + (Discusses Status of Technical Assistance Effort for Ofc of General Counsel Re Mill Tailings Litigation)
- ML20198F977 + (Discusses Status of Technical Review Branches Round 2 Questions Re WPPSS 1 License Application to Formalize Site Relocation & Addition of WPPSS 4 Duplicate Plant)
- ML20134L786 + (Discusses Status of Technical Review of Qa/Qc Area & Requests Program Plan Addressing Concerns.Independent Qa/Qc Consultant Should Address Each Technical Review Team Finding & Submit Program & Schedule for Each Issue)
- ML20199D931 + (Discusses Status of Terminated non-power Reactor Site Based on Results of Orau Review.Radiation Field Survey of Former Facility & Radiation Field & Contamination Survey of Upper Walls May Be Warranted)
- ML19319C802 + (Discusses Status of Testing Per Insp Rept 50-302/74-09. Preoperational Test Program Not Started.Fuel Loading Estimated for Jul 1975)
- ML19326E219 + (Discusses Status of Testing Re Degraded Grid Voltage & Adequacy of Station Electric Distribution Sys Voltages, Per 790823 & 800219 Commitments.Testing Complete.Evaluation of Data in Progress.Responses to Open Items Forthcoming)
- ML20248K183 + (Discusses Status of Transfer of Am-241 Source & Informs That Source Scheduled to Be Tranferred from West Liberty on March 11)
- ML20147D365 + (Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting)
- ML19253B652 + (Discusses Status of Trial Insp Program at Facility.Lists Changes & Clarifications to Program Resulting from 760120-21 Evaluation by Region I.Full Insp of Refueling Activity to Be Conducted During Refueling Outage)
- ML19221A531 + (Discusses Status of Two Eberline 219 Monitors)
- ML20032E085 + (Discusses Status of Two Items Discussed at 791102 Prehearing Conference.No Action Required Re Bolted Connections Since Piping Analysis Would Not Be Reviewed Until Final Design Stage.Ltr of 781012 Does Not Present Any New Issue)
- ML19262A149 + (Discusses Status of Two Petitions Re Cps,In Response to 790911 Request)
- ML19256D814 + (Discusses Status of Two Reactor Projects.Forwards ACRS Repts Re Projects.W/O Encl)
- ML20234D312 + (Discusses Status of USGS Geological Rept on Proposed Bodega Bay Reactor.Baker of USGS Insisted That Geological Rept Be Sent to AEC Without Waiting for Study of Seismology)
- ML20234E769 + (Discusses Status of USGS Rept on Bodega Head,Per 630614 Telcon W/A Baker.Rept Will Be Reviewed by Doi Prior to Transmittal to AEC in Approx 2 Wks)
- ML20234D789 + (Discusses Status of USGS Studies at Bodega Head,Per 630603 Conversion W/A Clebsch.Util Expects Excavation of Sediments & Top Layers of Rock,Necessary for Firm Conclusion on Geology of Site,To Be Completed by 631101)
- ML20138E791 + (Discusses Status of USI A-46/IPEEE Activities)
- ML20212N761 + (Discusses Status of Umtrap Vicinity Property Activities for Jul-Dec 1986.Chart of Cumulative Status of Vicinity Property Sites as of 861231 Encl)
- ST-HL-AE-4685, Discusses Status of Upgrades to STP Employee Concerns Program + (Discusses Status of Upgrades to STP Employee Concerns Program)
- AECM-86-0012, Discusses Status of Util Activities in Response to NRC 850611 Request for Addl Info Re Review of Possible Condensation Oscillation Loads from Chugging. Dedicated Lines from RHR HX Noncondensible Vents Preferred Resolution + (Discusses Status of Util Activities in Response to NRC 850611 Request for Addl Info Re Review of Possible Condensation Oscillation Loads from Chugging. Dedicated Lines from RHR HX Noncondensible Vents Preferred Resolution)
- ML20054L485 + (Discusses Status of Util Application for Substitution of Chlorination for Backflushing to Control Biological Flushing of Intake Tunnels.Draft NPDES Permit Will Be Issued & Comments Solicited)
- ML20155D596 + (Discusses Status of Util Efforts & Provides Schedule for Final Resolution of High Energy Line Break Issue.Corrective Actions Will Include Increased Component Thermal Protection, Addl Testing & Component Replacement)
- B12650, Discusses Status of Util Program to Correct Concern Noted in IE Insp Rept 50-423/86-12 Re Unnecessary Annunciator Windows in Control Room.Majority of Plant Mods & Design Improvements Will Be Completed by 1987 Refueling Outage + (Discusses Status of Util Program to Correct Concern Noted in IE Insp Rept 50-423/86-12 Re Unnecessary Annunciator Windows in Control Room.Majority of Plant Mods & Design Improvements Will Be Completed by 1987 Refueling Outage)
- ML19256D325 + (Discusses Status of Util Review Re Aircraft Crash Analysis. Brief Summary of 680307 ACRS Meeting Given in Text)
- ML18114A727 + (Discusses Status of Util Study of Plant Feedwater Sys Water Hammer Potential)
- ML17328A508 + (Discusses Status of Util Thimble Tube Testing Program Initially Committed to in Util)
- ML19275G549 + (Discusses Status of Venting Krypton from Containment Bldg in Response to Re a Donley Concerns.Public Comments Are Being Solicited on Environ Assessment.Krypton Gas Venting Not Permitted Pending Final Decision)
- ML20247M305 + (Discusses Status of Work Re Resolution of USI A-46)
- ML19256F526 + (Discusses Status of Zion Station Units 1 & 2 Re Operating Power Limits)
- ML19256F529 + (Discusses Status of Zion Station Units 1 & 2 Re Request to Increase Max Reactor Power)
- ML19256F527 + (Discusses Status of Zion Station Units 1 & 2 Re Proposal to Increase Power Level)
- ML19309B580 + (Discusses Status of mini-decay Heat Removal Sys Filter & Technical Basis of Conclusion That Changeout of One Shot Filter Not required.Long-term Operating Velocities to Be Low,Preventing Particulate Entrainment in Fluid Stream)
- ML19322A519 + (Discusses Status of once-through Steam Generator Secondary Side Sampling Valve CAV-4A.Valve Motor May Be Partially Submerged or Close to It)
- W3P88-0003, Discusses Status of post-accident Sampling Sys (Pass). Solenoid Valves Selected for Design Showing Failure to Seat Properly,Causing Disruption of RCS Degasification Portion of Pass.Valves Will Be Maintained in Interim + (Discusses Status of post-accident Sampling Sys (Pass). Solenoid Valves Selected for Design Showing Failure to Seat Properly,Causing Disruption of RCS Degasification Portion of Pass.Valves Will Be Maintained in Interim)
- ML19257A127 + (Discusses Status on Corrective Actions Re IE Bulletin 78-18, Audibility Problems Encountered on Evacuation of Personnel from High Noise Areas. Completion of Mods Will Require Addl 90 Days)
- ML19323F582 + (Discusses Status on Open Items Re Fire Protection SER & Amends to OL in Response to 800519.Outage Related Work to Be Completed During Next Refueling Outages in Coordination W/ TMI Installations.Expresses Concerns W/Length of Review)
- ML20134C887 + (Discusses Std Distribution for Advanced Medical Sys (AMS) Documents.Distribution List for AMS Documents Encl)
- ML20125D839 + (Discusses Std Distribution for Externally Generated Documents)
- ML20215J260 + (Discusses Stds for Stabilization of Residual Radioactive Matl at NRC Licensed U Mills.Compliance W/Epa Stds Will Satisfy Stabilization,Control & Radon Attenuation Stds for Remedial Action at Inactive Sites)
- ML20246C433 + (Discusses Steam & Feedwater Rupture Control Sys Mods. Pneumatic Relays in Control Circuit of MSIV to Be Deleted)
- ML20083L745 + (Discusses Steam Generator Corrosion Which Makes Thiosulphate Theory Suspect & Makes Explosion Repair Both Suspect & Dangerous.Facts Suggest Cause of Corrosion Not Thiosulphate. Requests NRC Not Approve Steam Generator Repair)
- ML19332C780 + (Discusses Steam Generator Girth Weld Insp.All Ultrasonic Surface Indications Confirmed by Magnetic Particle Testing Removed by Grinding & Blending)
- ML20042C705 + (Discusses Steam Generator Insp & Repair.Insp to Be Performed at Next Refueling Outage Confirmed.Reporting Program Re Status of Steam Generator Tube Leakage Described)
- ML13330B353 + (Discusses Steam Generator Insp Tech Spec Reporting Requirements in Response to NRC 880415 Request.Util Proposed Change 176 Requiring Rept & NRC Approval Per Tech Spec 6.9.2 Acceptable)