Discusses Status of Technical Review Branches Round 2 Questions Re WPPSS 1 License Application to Formalize Site Relocation & Addition of WPPSS 4 Duplicate Plant
ML20198F977
Person / Time
Site: Washington Public Power Supply System
Issue date: 08/23/1974
From: Schroeder F
US ATOMIC ENERGY COMMISSION (AEC)
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
CON-WNP-0992, CON-WNP-992 NUDOCS 8605290164
Download: ML20198F977 (1)


Text

'

m um 5'O '/fC 5/3 A. Ciambusso, Deputy Director for Reactor Projects, L AMENDMENT TO WPPSS NO. 1 LICENSE APPLICATION TO FORMALIZE SITE RELOCATION AND ADDITION OF WNP-4 DUPLICATE PLANT In response to your memorandum to me, copy attached I would like to report the status of the responsible Technical Review branches regarding completion of round two questions. Branches due to complete Q-2 by August 26, 1974, plan to meet the target date. The three branches scheduled to complete Q-2 by October 10, 1974, report the followingt the Auxiliary Power and Conversion Systems Branch and the Site Analysis Branch plans to meet the target data are dependent upon the extent of change contained in the amendment received August 9, 1974; Electrical Instrumentation and Control Systems Branch will complete Q-2 by October 31, a slip of 13 work days from the target date.

/, ># S ES d D

~.

/g.. rank Schroeder, Acting Deputy

(

Director for Technical Review Directorate of Licensing Attachment (As Stated) i cc w/Att:

A. Schwencer, RP l

T. Cox, RP TR-AD's l

TR-BC's J. Pansarella, TR DISTRIBUTION:

O O

60 l

ocket Nos. 50-460/50-513 A

PDR t

L-Rdg l

JCPanzarella-Rdg FSchroeder-Rdg (2) emet >

L.gR,,,,

,,,..L.; Tl F

FSbroedcr SURNAME)

,,0....rs DATE >

..g/M y..

..g K..

Form AEC-S ta (Rev. 9-53) AECM 0340 a.e ees--as-stees-1 au-sis

N-

[51kg U.*;1TED STAT 23

/V h 'i h ATOMIC ENERGY COMMISSION L C,\\$. - J '

www:c.ros, o.c. zms Dochet Mos: 50-460 RUG 13 g.}

ani 50-513 v. Schroeder, Acting Deputy Director for Technical Review, L MIENDMENT TO UPPSS NO. 1 LICEUSE APPLICATION TO FORMALIZE SITE RELOCATION AND ADDITION OF !GP-4 DUPLICATC PLANT on August 5, 1974, the Washington Public Power Supply System (UPPSS) sub-nitted an amend =ent to their WPPSS-1 license application docketed on October 18, 1973. This amendment is to document 1) the site relocstion irom the Hanford 1 area to the Hanford 2 area, and 2) the addition of a duplicate plant, ITSP-4, to be constructed on the same site area as the relocated'tdPal which'is currently under review.

By August 8,1974, UPPSS plans to have submitted the last in a series of three PSAR cmendmants that will completely document both the site relocation and the duplicate plant addition. The duplicate plant (UNP-4) is an exact replica ot the TCP-1, with the containment center located approximately 3200 feet northwest of the WNP-1.

Beth IGP-1 and -4 are about 1 mile east of the Hanford 2 nuclear plant now under conatruction. The only systems shared hetueen the two duplicate plants vill be the ecoling towar makeup and blow-de.n systems, the off-site power cystem, and the meteorological monitoring system.

On April 29, 1974, a review schedule chango was approved which documented the revicu plan resulting from the planned site relocation. The essential element of this changa was to continue the review on a branch by branch basis as the new material was submitted by WPPSS, in each case continuing the revieu from the Q-2 stage. PSAR amendment No. 8 and a new ER, received on July 1, 1974 completed the technical information updating for the site relocation and WP-4 addition with the exception of that material accassary for the Site Analysia, Auxiliary Power and Conversion Systems and tha Electrical Instrumentation and Control Systema branches. Amended material partinent to these branch revieus is the only material expected to change significantly due to the addition of the UNP-4 plant.

This information is expected to be docketed on August 8, 1974,

, seven days ahead of the scheduled date.

O 4

e

^

-w

^

--v--

( vt Vv c_y.

V*

. Caaaidering that the addition of WI;P-4 in ccccurrent with the ongoing revleu, and that it is an entire plant duplication of ti a U:l?-1, with thu uinimum of chared systens roted above, ue believe thct the revicu

hould continue on the current cchedule.

I uculd appreciate your confirmation of thf.s approach.

(

ys.,

A. Ciambusaa, Deputy Director for Reactor Projects Directorate of Licensing ecs: IR ads /EC:4 f