Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Discusses Problems with Monitor Well". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19241B893  + (Discusses Problems Experienced W/Pipe Support Baseline Design,As Outlined in IE Bulletin 79-02 & Transmitted to ASLB on 781207.Criteria for Design of Steel Embedments Prevents Problems Occurring)
  • ML19221A238  + (Discusses Problems Identified at B&W Facilities Re TMI Occurrence.Identified Problems Include Pressurizer Level Instrumentation,Integrated Control Sys & Lack of Hydrogen)
  • ML20132G840  + (Discusses Problems Re Annual Matl Fee Invoice for NRC Registry of Radioactive Sealed Sources & Devices NR-109-D-104-G & NR-109-D-110-B)
  • ML20002B697  + (Discusses Problems Re BWR Scram Sys.Item 2 of Ltr to BWR Licensees Should Be Revised)
  • ML20010E856  + (Discusses Problems Re Facility Staffing,Atmospheric Dispension,Hydrogen & Sys Interactions)
  • ML20032B207  + (Discusses Problems Re NRC Document Request Directed to CA Governor Brown.Substantial Progress Must Be Made Soon to Avoid ASLB Intervention)
  • ML16340C368  + (Discusses Problems Re Rl Cloud & PG&E Seismic Reverification Program.Proposes Meetings to Discuss Subj.Info Re Auxiliary Bldg Weight Reconciliation Encl)
  • ML20114E794  + (Discusses Problems Relating to QC of Welding,Defective Welds Experienced at Facility in CR Drive Hydraulic Sys Penetrations Through Dry Well & in Some Reactor Pressure Vessel Internals)
  • ML20101U086  + (Discusses Problems Requiring Resolution Before Submittal of License Amend Request Re Setpoint Reevaluation Program.Tech Spec Amend Request Will Be Submitted by 850308)
  • ML20211C815  + (Discusses Problems W/Enforcement of Reg Guides,Per Kewaunee Situation Re Security Insp Indicating Reg Guide 1.17 Not Met.Suggested Actions Listed)
  • ML20198P353  + (Discusses Problems W/Environ Part of package.Nine-page Environ Assessment Must Be Issued at Same Time as Finding of No Significant Impact.Related Info Encl)
  • ML19305D956  + (Discusses Problems W/Implementation of Lessons Learned Task Force Recommendation Re Automatic Initiation of Auxiliary Feedwaters Sys.Requests NRC Concurrence W/Plan for Implementing Requirement During 1980 Refueling Outage)
  • ML20136C584  + (Discusses Problems W/Monitor Well)
  • ML20128G498  + (Discusses Problems W/Northeast Util Nuclear Reactors in Connecticut)
  • ML20024C796  + (Discusses Problems W/Operator Licensing Exams of ltr- Designated Individual Vv)
  • ML20083M935  + (Discusses Problems W/Pcrv Prestressing Sys & Resultant Insp Test Results.Liftoff Tests Show Tendon Sys Operable.Nrc Permission to Return to Power Operation from Present Refueling Outage Requested by 840418)
  • ML20234B636  + (Discusses Problems W/Pg&E Proposed Reactor on Bodega Head, Including Putting Site on Fault Line & Devaluating Property. Suggests to Put Plant Along Peninsula Ocean Shore)
  • ML20076E143  + (Discusses Problems W/Recent Evacuation Training & Emergency Plan Workability)
  • ML18051B327  + (Discusses Problems W/Recent Exxon Nuclear LOCA-ECCS Analysis on Westinghouse Plants.Neither Problem Affects Plant LOCA-ECCS Analysis.Questions Resolved)
  • ML19319C027  + (Discusses Problems W/Relative Concentration Values of Site Meteorological Data.Requests Submittal of Aug 1975-76 Data W/Recovery Greater than 90% in Form of Joint Frequency Wind Speed & Direction Distributions.Info Due within 45 Days)
  • ML19249A156  + (Discusses Problems W/Transfer of Us Nuclear,Inc Records to American Nuclear Insurers)
  • ML19241B339  + (Discusses Problems in Jt Long 780613 Memo Re Alleged Thefts or Diversions of Strategic Snm.Majority of Relevant Threat Info,Compiled by Jh Coran,Was Not Used)
  • ML20024A940  + (Discusses Problems in Preparation of Jcp&L Proposal.Jcp&L Proposal Should Be Strictly Their Own W/Min Cross Ref to Met Ed)
  • ML20069F925  + (Discusses Problems of Augmenting Operating Staff W/ Previously Licensed Reactor Operators.Resumes of Five Individuals Encl)
  • ML20072G413  + (Discusses Problems w/post-accident Sampling Sys (PASS) microprocessor,on-line Ph Meter Sample Flow & Ion Chromatograph.Proposed PASS Completion Per NUREG-0737,Item II.B.3,scheduled for 830930)
  • SNRC-1226, Discusses Procedural Change Re Technical Support Ctr Plant Process Historical Data Log.Printing of SPDS Data on Demand Only Allowed Upon Receipt of External Event Signal  + (Discusses Procedural Change Re Technical Support Ctr Plant Process Historical Data Log.Printing of SPDS Data on Demand Only Allowed Upon Receipt of External Event Signal)
  • ML19326D454  + (Discusses Procedural Changes in Initial CP or OL Applications & Amends.Changes Adopted & Incorporated as Amends to 10CFR2,10CFR51,effective 760517.FR Notice & Updated Svc Lists Encl)
  • 1CAN038905, Discusses Procedural Guidance for Conducting Gross Leak Testing of Valves in HPI Sys Discharge Piping.Util Proposes to Amend Procedure to Instruct Operator to Observe Gauge Pressure Reading for 1 Minute While Conducting Test  + (Discusses Procedural Guidance for Conducting Gross Leak Testing of Valves in HPI Sys Discharge Piping.Util Proposes to Amend Procedure to Instruct Operator to Observe Gauge Pressure Reading for 1 Minute While Conducting Test)
  • ML20140B788  + (Discusses Procedural Mechanisms for Backfitting.Survey of Mechanisms,Used as Input to Tables I,Ii & III of Attachment to CRGR Charter Encl)
  • ML20126G877  + (Discusses Procedural Requirements for Restart.Licensee Request for Restart Should Be Processed as License Amend. Forwards Notation Paper.W/O Paper.Related Info Encl)
  • ML20094R135  + (Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D))
  • ML19269C244  + (Discusses Procedure for 2-year Extension of Preliminary Design approval-5 for Turbine Island Application & Associated Fee Calculation.Requests Evaluations by 790315 for Specific Items Identified in Encl)
  • ML19289F832  + (Discusses Procedure for Coordinating DOT Safety Insp of Vehicles Transporting TMI Radwaste.Info Partially Withheld:Home Telephone Numbers (Ref FOIA Exemption 6))
  • ML19347C900  + (Discusses Procedure for Fee Determination.Upon Completion of Review of 810218 Request for Route Approval,Nrc Will Notify Licensee Re Fee Due)
  • ML19322C446  + (Discusses Procedure for Feedback of Info & Data from Div of Operating Reactors to Licensing Reviews)
  • ML19253A366  + (Discusses Procedure for Info Requests from Util)
  • ML20005A164  + (Discusses Procedure for Intervention in OL Application,In Response to)
  • ML19319C645  + (Discusses Procedure for Issuing Facility OL in Response to 770418 Request)
  • ML20197G991  + (Discusses Procedure to Be Used That Allows Util to Receive License Extension to 40 Yrs from Date of Ol.Environ Assessment Should Be Prepared Following Guidelines of Encl Licensee Review)
  • ML19319B201  + (Discusses Procedure to re-extend 720301 Approved CP Completion Date from 720228 to 730228)
  • ML19242D206  + (Discusses Procedures & Plans Re Cycle 8 Startup Expected to Commence 791102.Results of Startup Physics Rod Worth Measurements Will Be Submitted within 45 Days Following Verification of Shutdown Margin)
  • TXX-4729, Discusses Procedures Implemented Per 821203 Commitment to IE Bulletin 79-14,requiring Insps of safety-related Piping Sys to Verify That Drawings for Seismic Analysis Accurately Reflect as-built Condition  + (Discusses Procedures Implemented Per 821203 Commitment to IE Bulletin 79-14,requiring Insps of safety-related Piping Sys to Verify That Drawings for Seismic Analysis Accurately Reflect as-built Condition)
  • ML20134L494  + (Discusses Procedures Re Official & Private Travel to Peoples Republic of China by AEC Personnel & Dependents)
  • ML20063D070  + (Discusses Procedures Re Svc of Relevant Documents & Changes & Clarifications to Present Svc List.Updated Svc List Encl)
  • ML20091L271  + (Discusses Procedures for ALAB-106,Conditions 2,3 & 4)
  • ML19254B419  + (Discusses Procedures for Analyzing Reactivity Limitations for GE BWR Fuel Stored in Spent Fuel Rack.Supporting Correspondence Encl)
  • ML20244B915  + (Discusses Procedures for Citing Safeguards Violations Against 10CFR73.55 & Approved Physical Security Plans. Citations Should Be Made Against Plan,Not Against Rule, Citing License Amend Approving Plan)
  • ML20045G575  + (Discusses Procedures for Compiling Regulatory History Re 48CFR20 on Organizational Conflicts of Interest)
  • ML20045F965  + (Discusses Procedures for Compiling Regulatory History Re Acquisition Regulation Final Rule)
  • ML19326D395  + (Discusses Procedures for FSAR Review.Based on Acceptance Review of 770829 Fsar,Addl Info Required in Electrical Area to Complete Technical Review.Response Requested within Five Wks of Docketing Date)