ML19319C027

From kanterella
Jump to navigation Jump to search
Discusses Problems W/Relative Concentration Values of Site Meteorological Data.Requests Submittal of Aug 1975-76 Data W/Recovery Greater than 90% in Form of Joint Frequency Wind Speed & Direction Distributions.Info Due within 45 Days
ML19319C027
Person / Time
Site: Davis Besse 
Issue date: 10/01/1976
From: Stolz J
Office of Nuclear Reactor Regulation
To: Roe L
TOLEDO EDISON CO.
References
NUDOCS 8001300757
Download: ML19319C027 (2)


Text

_

3

"/

Distributi [

Docket File ^

M. L. Ernst NRC POR W. P. Gammill Local PDR ELD OCT 1 33 LWR 1 File IE (3)

R. C. DeYoung AChS (16)

F. J. Williams Occket No. 50-345 e

E. Hylton Toledo Edison Company ATT3: Mr. Lowell E. Roc J. Knight, SS Vice President, Facilities R. Tedesco Development H. Denton

,dison Plaza c

V. A. Moore 300 Madison Avenue R. H. Vollmer Toledo, Ohio 43652 bec:

J. R. Buchanan, NSIC T. B. Abernathy, TIC Gentlemen:

DAVIS DESSE I:ETEOR0 LOGICAL OATA We find that the relative concentration values for the Davis Besse site as calculated in using the August 1974 through August 1975 data are 2.5 times lower than those calculated in using the Decemoer 1969 thrnugh Novem0er 1970 data. These values are also significantly lower (about a factor of 2) than those calculated for the Perry site, also along the shoreline of Lake Erie, and which would be expected to exhibit similar dispersion characterittics.

Therefore, to verify that the relative concentration values are recre-sentative and conservative for the Cavis Besse site, we request that you submit an additional year of onsite data collected since August 1975 wita data recovery greater than 90 percent.

The additional one year data (August 1973 through August 1976) should ae submitted in the form of joint frequency distributions of wind speed and wind direction measured at the vertical temperature gradient between 35-feet and 250-feet. Also, we request that you provide similar joint frequency distributions for the tuo year period, August 1974 through August 1976.

We request that you notify us within 7 days after receiDt of this letter that the information requested will be provided within 45 days or explain why you cannot meet this schedule and provide the schedule that you will meet.

W o,. c = *-

._ LWR 21 so.o u one9 Form ABC.ps (Rev, M3) m 0240 W u. s. eavsmaasen eninine orricas sen.ese see 80013007 6 7 A7

DCT 1 Lo75 j

2-Toredo Edison Company Please call us if you have any questSns regarding these matters.

Sincerely, pr.g.nl s:;n22 :7

.s.

c....

Jd E F. Stolz, Chief Light Water Reactors Branch flo. 1 Division of Project Management cc: Mr. Donald H. hauser, Esq.

Tne Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Gerald Charnoff, Esq.

Saaw, Pittman, Potts and Trowbridge 91017th Street, ii. W.

Washington, D. C.

20035 Leslic Henry, Esq.

Fuller Seney. Henry and Hodge 300.'ladison Avenue Toledo, Ohio 43604 L

1 L

.,,,.e, eva a== *

. LEr JSto -

16/_.L

-J8/ /

6

..va.

-m Forms AEC.318 (Rev. 9 53) ABCM 0240 W u. e, eovenmassw? pataviene orrices sota sea see

_