Text
-.
kw :ob L
- 6..M t. i%
c wu
(
UNITED STATI5' l
h ATOMIC ENERGY COMMISSION si G l." 1 l
nevisecos or consPksasecs
- r. E c2
?*
i gesences lll l
7es nocesysky no4o l
GLsN E4.LYM. II.LINoss 60137 atsaess-aseo 8
April 10, 1974 E. D. Thornburg, Chief, Field Support and Inforcement Branch Directorate of Regulatory Operations, Headquarters 1
I RS&EB ACTION REQUI3T NO. III/74-14 MIDLAND - ALAB 106, CONDITIONS 2, 3 AND 4 Consistent with our recent discussion regarding this matter, we are j
proceeding in the following manner:
ALAB 106. Conditions No. 2 and No. 3 Each quarterly report received will be evaluated in tezas of the scope 1
l Evaluation menos will be and qualifications of QA/QC personnel.
forwarded to you with reference to each quarterly report subsequent l
to the last quarter of CT 1973.
l s
M Mt 106. Condition No. 4 Review nonconformance and audit reports submitted by Consumers power l
Company on a monthly schedule. Approximately one-half of the reports are to be selected for detailed review (on the basis of indicated J
(1) control of noncon-significance) to determine the adequacy of:
formance procedures, -(2) proper and adequate corrective action, (3) i generic QA/QC program implementation considerations, and (4) identi-
{
fication of violations to applicable requirements.
Any potential problems, identified during the detailed review discussed in the preceding paragraph, are to be "checklisted" and are to be i
d reviewed during routine site inspections, which are currently on a three-week schedule.
The results c' the review of nonconformance and audit reports in the Regional office (disposition) will be maintained in the inspector's l
files, whereas the results of site review of selected matters (preceding paragraph) will be reported by attachment to inspection i
reports.
e
.....eo.r. Cual Reactor Construction Branch I
cc: J. 4. Keppler e406070404 840517 PDR FOIA RICE 94-96 PDR 4
^~~~"~~#"~'
...... =... =.... -
-=