Discusses Problems Requiring Resolution Before Submittal of License Amend Request Re Setpoint Reevaluation Program.Tech Spec Amend Request Will Be Submitted by 850308
ML20101U086
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/25/1985
From: Brey H
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-85025, NUDOCS 8502060578
Download: ML20101U086 (2)


Text

'

e- "

public Service Company ff Odendo ,

P.O. BOX 840 DENVER. COLORADO 80201 2420 W. 26th Avenue, Suite 1000, Denver, CO 80211 January 25, 1985 Fort St. Vrain Unit No. 1 P-85025 Regional Administrator 3' g @ @ % @

Region IV .

Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 FEB - 1 E Arlington, Texas 76011 J; Attn: Mr. Eric H. Johnson [ ~~"~~~~

DOCKET NO. 50-267

SUBJECT:

Setpoint Reevaluation Program

Dear Mr. Johnson:

Public Service Company of Colorado (PSC) has proceeded to reevaluate Plant Protective System (PPS) setpoints as committed to in a letter dated March 9, 1984, from Warembourg to Collins (P-84078). The Setpoint Reevaluation Program has used the methodology described in PSC's March 9, 1984 letter as recommended by the NRC both in an NRC letter from Madsen to Lee, dated July 11, 1983 (G-83255) and in a meeting between PSC and the NRC on October 27, 1983.

Although the program is near completion, PSC has encountered a number l of last minute problems whicn require resolution prior to submittal of this proposed amendment to the FSV Facility Operating License.

These problems are:

l 1. Definifig reactor modes consistently with the Technical Specification Upgrade Program.

2. Finalizing the inclus^on of PPS setpoints and curves not previously in the Technical Specifications.
3. Developing action statements consistent with the Standard l Technical Specifications and applicable to Fort St. Vrain.

l I

850206057D 850125 PDR ADOCK 05000267 P PDR $$00S- L cronG

~n 0 , o

r-

  • J

/ P-85025 Pag 2

4. The consultant performing the setpoint calculations used two surveillance intervals to determine drift allowance. PSC has requested that the sample size be expanded to 24 surveillances, and that all affected Trip Setpoints be recalculated.
5. Upon completion of items 1 through 4, PSC requires a minimum of four weeks for internal review by the Plant Operations Review Committee and the Nuclear Facilities Safety Comi ttee.

PSC will continue our efforts to complete this program at the earliest feasible date, and hereby commits to submit the Setpoint Reevaluation Program proposed amendment to the Technical Specifications on or before March 8,1985.

Please call H. H. Holmes of my staff at (303) 571-8409 if you have any questions.

Very truly yours, hWW H. L. Brey Executive Staff Assistant Electric Production HLB /NH:pa l