Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Discusses B&W Requalification Training Program". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML16245A394  + (Discusses B Mcdermott 790514 Memo Re Safety of B&W Plants. Disagrees W/B Mcdermott Position Favoring Shutdown)
  • ML16245A395  + (Discusses B Mcdermott 790514 Memo Re Safety of B&W Plants. Disagrees W/B Mcdermott Position Favoring Shutdown)
  • ML20236X628  + (Discusses B Shelton Concurrence on M Au Pr Package on 980212.Informs That Package Does Not Have to Be Sent to Both B Shelton & a Galante Since Shelton Now Part of Ofc of Chief Info Officer.Future Packages Will Be Sent to Shelton Only)
  • ML20105D076  + (Discusses B Stamiris 820915 Request That Ofc of Investigation Be Made Aware of Attachment a to Stamiris Motion for Partial Initial Decision on QA Adequacy in Soil Remedial Work Prior to Remedial Underpinning Evaluations)
  • ML19323D801  + (Discusses B&R-002A,Revision 3, QA Program for Nuclear Power Plants. Agrees W/Assessment That Changes Are Nonsubstantial & Acceptable)
  • ML19329C132  + (Discusses B&W 761202 Proposed Revision to ECCS Evaluation Model in Response to NRC Re Compliance w/10CFR50 App K)
  • ML19326C630  + (Discusses B&W 780503 & 05 Notification That Incore Detector Previously Used May Be Too Small.Util Evaluation of Analysis Awaits B&W Response to Request for Addl Info)
  • ML19211D026  + (Discusses B&W 791210 Request for Extension of Completion Date Re Conditions 12 & 37 of License SNM-414.Action Considered Administrative Amend & Will Not Affect License Renewal)
  • ML19310A507  + (Discusses B&W Allegation Re Possible Conflict of Interest During Instrumentation & Control Sys Branch Review of BAW-1564.Matter Will Be Investigated by R Satterfield.No Further Action Required)
  • ML19310A505  + (Discusses B&W Allegation of Possible Conflict of Interest in Instrumentation & Control Sys Branch Review of BAW-1564. Info Reveals That Reviewers Were Not Involved in Rept Preparation While Employed W/B&W)
  • ML20077S335  + (Discusses B&W Commenting on Use of Furmanite in body-to-bonnet Joint of DHV-1,per Request.Reported Levels of Chlorides,Fluorides & Sulfur in Furmanite Used on DHV-1 Not Cause for Concern.Furmanite Can Be Left in Place)
  • ML19322C526  + (Discusses B&W Containment Isolation Sys.Plans Implementation of Acceptance Criteria Re Parameter Diversity in Containment Isolation Initiation)
  • ML20151Z070  + (Discusses B&W Design Requirements Review.List of Individuals Identified as Contacts for Respective Regions or Ofcs & Draft Program Plan Encl for Comment)
  • ML19308C949  + (Discusses B&W Hot Channel Thermal Hydraulic Analysis for Steam Line Break Accident.Concludes Resulting Doses Acceptable.Recommends Investigation of Steam Line Break for B&W Rodded Plants to Ensure Fuel Failure Doses Acceptable)
  • ML19340B838  + (Discusses B&W Integrated Reactor Vessel Matls Surveillance Program.Present Reactor Vessel Matl Irradiation Tech Specs Remain Valid & Limits Will Be Modified Prior to Expiration)
  • ML20062P044  + (Discusses B&W Overfeed Transient Analysis Using IRT Deck Simulating Facilities.Figures 1-9 Re Computed Transient Results Encl)
  • ML20045G756  + (Discusses B&W Owners Group Integrated Plant Assessment Process Flowchart,Presented at 930511 Meeting)
  • ML19347D876  + (Discusses B&W Owners Group Multiphase Program Demonstrating Compliance w/10CFR50,App G Requirements Re Reactor Vessel Matls Fracture Toughness adequacy.CR-3 Reactor Vessel Welds Usage Predicted for 16 Yrs or More)
  • ML20147B759  + (Discusses B&W Owners Group Program to Evaluate Util Dispositions of Safety & Performance Improvement Program (Spip) Recommendations.Completion of Implementation of Spip Recommendations Will Increase Plant Safety)
  • 1CAN078804, Discusses B&W Owners Group Safety & Performance Improvement Program (Spip) Recommendations Status.Quarterly B&W Owners Group Recommendation Tracking Sys Rept Method Intended to Keep NRC Informed of Util Progress  + (Discusses B&W Owners Group Safety & Performance Improvement Program (Spip) Recommendations Status.Quarterly B&W Owners Group Recommendation Tracking Sys Rept Method Intended to Keep NRC Informed of Util Progress)
  • ML19260E914  + (Discusses B&W Plant Owners Response to NUREG-0578.Position That No Addl Instrumentation Is Required for Detection of Core Cooling Is Unacceptable.Evaluation Detailing Basis for Conclusions Encl)
  • ML20080J538  + (Discusses B&W Preliminary Safety Concern Re Potential for Pressurized Thermal Shock Through Possible Misinterpretation of Small Break Operating Guidelines in B&W Document 74-1123094-2)
  • ML19221A465  + (Discusses B&W Recommendation That Addl Boron Be Added to Primary Coolant Sys)
  • ML20076D441  + (Discusses B&W Rept BAW-1543,Rev 3, Master Integrated Reactor Vessel Surveillance Program)
  • ML19308D058  + (Discusses B&W Rept,In Response to NRC .Agrees W/Rept Conclusion That No Voiding Occurs in RCS During Anticipated Transients.No Data Found to Support Proposed Voiding Phenomena)
  • ML20024B894  + (Discusses B&W Requalification Training Program)
  • ML20141F673  + (Discusses B&W Request for Exemption from 10CFR11 SNM Applications.D Kasun Opposes Granting Exemption & Would Not Support Change in Regulation.B Nulsen Agrees W/Proposed Change Re Duplication of Paperwork for NRC & DOE)
  • ML19208D622  + (Discusses B&W Requested Administrative Change to Matl/ Byproduct License SNM-414.License Can Be Amended W/O Undue Risk to Public)
  • ML19208C464  + (Discusses B&W Requesting Administrative Change to License SNM-414 to Clarify Procedures for Implementing Replacement of Personnel in Key Operations Mgt & Supervisory Positions in PA Facility)
  • ML19309A327  + (Discusses B&W Revised Specific Heat Curve for U Dioxide Incorporated Into Affected Computer Transient Codes for Plant Safety Analyses.Results of Rapid Transient Investigations Outlined)
  • ML19326B427  + (Discusses B&W Revision to Specific Heat Curve for U Dioxide Utilized in Transient Computer Codes.Forwards New Specific Heat Curve.Provides Results of Modeled Safety Implications of Transients)
  • ML20037A335  + (Discusses B&W Vent Valve Type Plants & Failure of Internal Components During Hot Functional Testing.Provides Review & Present Status of Unresolved Safety Issues for Licensing)
  • ML19254E521  + (Discusses B&W-1564 Re Integrated Control Sys Reliability Analysis.Rept Is Responsive to Recommended long-term Requirements of Commission 790809 Order Re Restart)
  • ML20034G777  + (Discusses B&Wog Request for Withholding Info from Public Disclosure Per 10CFR2.790.Informs That NRC Unable to Conclude That Use of Info by Nonmember Would Decrease Expenditures,Time & Resources & Designing of Product)
  • ML20092E051  + (Discusses B1R07 SG Insp to Verify Load Path Necessary to Support 3 Volt Interim Plugging Criteria)
  • ML19296D195  + (Discusses BAW-1597, Effects of Asymmetric LOCA Loading- Phase II Status. Endorses Results of Test & Concludes That Results Are Applicable to TMI-1)
  • ML17249A881  + (Discusses BNL Fire Protection Safety Evaluation.Forwards Summary of Requirements to Resolve Issues.Overall Evaluation of Item 3.2.1 Re Safe Shutdown Analysis Will Not Be Complete Until SEP Input Is Received)
  • IA-85-427, Discusses BNL Study of Need for Independent Agency to Investigate Incidents at NRC Licensed Facilities. Documentation Requested for Each Substantive Change to Draft Rept  + (Discusses BNL Study of Need for Independent Agency to Investigate Incidents at NRC Licensed Facilities. Documentation Requested for Each Substantive Change to Draft Rept)
  • ML20209D374  + (Discusses BNL Study of Need for Independent Agency to Investigate Incidents at NRC Licensed Facilities. Documentation Requested for Each Substantive Change to Draft Rept)
  • ML19322C447  + (Discusses BSAR-205 Subcommittee 770727 Meeting Disclosing Two Instances of Single Failure Criterion Misapplication)
  • ML20155F019  + (Discusses BWR 6/Mark III Containment Blowdown.Reactor Safety Will Provide Comparison of Results of GE Recirculation Line Blowdown to Those Performed Using RELAP-4)
  • ML17174A440  + (Discusses BWR Automatic Depressurization Sys Operability Requirements for Facilities.Automatic Depressurization Sys Must Meet Seismic Category I Requirements.Electromatic Valves Would Survive Earthquake)
  • ML19338F272  + (Discusses BWR Fuel Failure Experience & Fuel QA Insp Rept on 730927-29.Impact of Projected Fuel Failure Experience & Generic Implications Should Be Discussed, & Facility Reconstitution & Refueling Should Be Closely Monitored)
  • ML20150C771  + (Discusses BWR Mark I Containment Performance Workshop on 880224-26 in Baltimore,Md.Need to Close Severe Accident Issue Expressed)
  • ML20050B746  + (Discusses BWR Owners Group Actions to Address Final Interim Hydrogen Control Rule.Addl Time to Respond to Recombiner Requirement Requested)
  • ML20235D058  + (Discusses BWR Pressure Suppression Designs Based on Peak Pressure Prediction on Computer Codes Developed from Tests Performed at Humboldt & Bodega Bay)
  • ML20148D648  + (Discusses BWR Transient Margins.Believes That Substantial Margin Exists in Licensing Basis Analysis on File W/Nrc Using Redy & Results of Tests at Peach Bottom & Kkm. Recommends Continuing Current Odyn Qualification Program)
  • ML20141H853  + (Discusses BWR Util Commitments to BWR Vessel & Internals Project Re Issue of Intergranular Stress Corrosion Cracking of BWR Components.Encourages Licensee to Continue Efforts & Frank Open Communications W/Nrc Staff)
  • ML20035C227  + (Discusses BWROG Experiments to Quantify Effects of Noncondensible Gases During Depressurization & to Test Adequacy of Potential Mods.Requests Response to Concerns Stated by 930331)
  • ML17059A316  + (Discusses BWROGs Submittal of NEDO-31558 Position on NRC Regulatory Guide 1.97,Rev 3,Requirements for Post-Accident Neutron Monitoring Sys, in Regard to Section 6.2 of GL 82-33)
  • ML17059A317  + (Discusses BWROGs Submittal of NEDO-31558, Position on NRC Regulatory Guide 1.97,Rev 3,Requirements for Post-Accident Neutron Monitoring System, in Regard to Section 6.2 of GL 82-33)