ML19329C132
| ML19329C132 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/03/1977 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8002120865 | |
| Download: ML19329C132 (2) | |
Text
NRd co;u 195 u.s. NuCLEAa r.EGULATORY M MISSION OOC KET NUM BE H
^
50-346 82 h '
NRC DISTRIBUTION FoR PART 50 DOCKET MATERI AL T"'.
FROM:
DATE OF DCCUMENT Toledo Edison Company 1/3/77 Mr. John F. Stolz Toledo, Ohio o4TE RECEivEo Lowell E. Roe 1/5/77 MLETTER ONOTORf 2ED PRCP INPUT FORM NUMBER OF COPIES RECEIVED MRIGINAL
[UNC LASSt FIE D One signed OcoPv DE SC7tt P TION ENCLOSURE Ltr. re our 12/20/76 Itr....Concerning B&W's ECCS Evaluation Model.
(1-P)
ACKNOW'LEDGED DO NOT REMOVE
'""' "^***
D:,vis-Besse SAFETY FOR ACTION /INFORMATION v'Nton 1/11/77 RJL
>dASSIGNED AD:
Vassallo A eTr rn An.
BD AECILC11IEF-Stolz (6) nnern, m Trv.
PJLOJF4T F% NAGER:
L. Engle PROJECT PANAGER:
I LIC._ ASST. :
Hylton LIC. ASST. :
i i
INTERNAL DISTRIBUTION GIG fill)
SYSTEMS SAFETY l
PLANT SYSTEMS SIF mSA RTY &
X NRC*TDR" HEINEMAN X
TERE _S_C0 E?NIRO M'ALYSTS k I&E (2 )
SCIIRGEDER l
BENAROYA DE!iTON & M"TUR MOELD M
LATNAM GOSSICK & STAFF ENGINEERING IPPOLUO
[IMIPC ENVIRO TECH.
+
MACA_RRY I
KIRl;'dQOD ERNST M CASE KNICHT l
t BALLARD t
HANAUER I SI}NEIL OPERATING REACTORS I SPANGLER i
HARLESS I PA'JLICKI STELLO I
i i SITE TECH.
I l
PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH,
! CAPMILL gBOYD X ROSS X
EISENHUT ISTEPP i
P. COLLINS D(
NOVAK (3)
SHA0 I
HULMAN HOUSTON V
ROSZTOCZY k
BAER PETERSON CHECK BITTLER SITE ANALYSIS MELTZ CRIMES VOLLMER HELTEMES AT & I BUNCH I
SKCVHOLT l
SALTZMAN J. COLLINS i
i RUTBERG l
KREGER EXTERN AL UlSTRIBUTION CONTROL NUMBE R l
gI,PDR :
Pt. Clinton.Ohin i NAT. LAB:
B&QCKILWEN MAT. I_AM.
X TIC:
% NSIC:
LA PDR
/g ASLB:.
CONSULTA!TTS :
, /
, s XACKS }b CYS C~ ';^NGl3ETT *. fx A f////87I)
^ '
^
i I i N.C FGRM 195(2 76) 800219n8 N
ur TULEDO
%mm EDISON January 3, 1977 LOWELL E. RCE v <. u.....
, g[!","*
Docket No. 50-346 Serial No. 178 AO w l c q%.),
i/
A f
S M 5 5 " $__
Mr. John F. Stolz H1 Chief Light Water Reactors k,
..,g ry.pt M,Q Branch No. 1 Division of Project Management Gjj
~
United States Nuclear Regulatory Commission Washington, D.C.
20555 s
Dear Mr. Stolz:
This is in response to your letter of December 20, 1976, regarding compliance with 10 CFR Part 50, Appendix K, for our Davis-Besse Nuclear Power Station Unit No. 1.
By means of a transmittal letter dated December 20, 1976, from The Babcock & Wilcox Company to Mr. S. A. Varga of the NRC staff, B&W has submitted a proposed revision to the B&W ECCS Evaluation Model refer-
/
enced in NRC's letter of December 2, 1976, as attached to your letter to us.
As identified in B&W's transmittal, the proposed revision is not a significant ECCS Evaluation Model change, since the revision results in calculated peak cladding temperatures within 20 F of those reported in related Topical Reports such as BAW-10105, Revision 1, "ECCS Evaluation of B&W's 177-FA Raised-Loop NSS."
Topical Report BAW-10105 addresses analyses run for the Davis-Besse facility.
Upon NRC approval of B&W's proposed Model revision, Topical Report BAW-10104A, Revision 1, "B&W's ECCS Evaluation Model," will be revised accordingly. Subj ect to the acceptability of the Model revision, the lacking of significant evaluation changes, and in accordance with the provisions of Appendix K to 10 CFR Part 50, no submittal or reanalyses specific to our application (i.e., BAW-10105, Revision 1) is planned.
It is our understanding that only the NRC approval of B&W's proposed revision to the Evaluation Model, and subsequent inclusion in 1 'g evaluation of the 4n BAW-10104A, remain as open items in th em performance.
Davis-Besse Unit No. 1 emergency c
.m.
Yours very truly,
/?
I~
'}.
Se20!ato0' Doc O,
' Q 3 g / glk %
- b s /
4
/ 9}
M,,
Q W
7 134 k<!qq s dh a/9 THE TCLEDO EDISON CCMPANY ECISCN PLAZA 300 MACISCN AVLNUE TCLECO, CHO 43652