Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Confirmatory Action Letter". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML093100546  + (Confirmation of Requested Initial Operator License Examinations for Catawba Nuclear Station)
  • ML14069A506  + (Confirmation of Requested Initial Operator License Examinations for Vogtle Nuclear Plant)
  • ML12307A310  + (Confirmation of Requested Initial Operator License Examinations for Vogtle Nuclear Plant)
  • ML120300523  + (Confirmation of Requested Initial Operator License Examinations for Vogtle Nuclear Plant)
  • ML093100620  + (Confirmation of Requested Initial Operator License Examinations for Vogtle Nuclear Plant)
  • ML093100583  + (Confirmation of Requested Initial Operator License Examinations for Browns Ferry Nuclear Plants)
  • ML102770029  + (Confirmation of Requested Initial Operator License Examinations for Edwin I. Hatch Nuclear Plant - Hatch)
  • ML120300362  + (Confirmation of Requested Initial Operator License Examination for Catawba Nuclear Station)
  • ML102770108  + (Confirmation of Requested Initial Operator License Examination - Vogtle)
  • ML102740318  + (Confirmation of Requested Initial Operator License Examinations - Harris)
  • ML102770113  + (Confirmation of Requested Initial Operator License Examinations - Oconee)
  • ML091690413  + (Confirmation of Retake Initial Operator License Examination: Kewaunee Power Station)
  • ML19184A238  + (Confirmation of Revision to Kairos Power LLC, Principal Design Criteria for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431))
  • ML19255H234  + (Confirmation of Revision to Kairos Power LLC Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431))
  • ML12128A493  + (Confirmation of Revision to Regulatory Issue Summary 2011-004: Preparation and Scheduling of Operator Licensing Examinations: Palisades Nuclear Plant)
  • ML091610638  + (Confirmation of Schedule for Submission of Information to Support Operating License Application Review)
  • ML090830178  + (Confirmation of Schedule for Submission of Information to Support Operating License Application Review)
  • ML092170587  + (Confirmation of Schedule for Submission of Information to Support Operating Licence Application Review)
  • ML003676899  + (Confirmation of Selected Sump Design Survey Responses)
  • L-2017-052, Confirmation of Submittal of 2016 Individual Monitoring Report  + (Confirmation of Submittal of 2016 Individual Monitoring Report)
  • 2CAN081004, Confirmation of Submittal of Additional Optimized ZIRLO Data  + (Confirmation of Submittal of Additional Optimized ZIRLO Data)
  • ML021300105  + (Confirmation of Telephone Conversation Between Mr. Brian Dolan & Robert C. Haag on 02/20/2002, Concerning McGuire self-assessment Meeting Scheduled for 06/06/2002)
  • ML040500446  + (Confirmation of Telephone Conversation Regarding Preliminary Significance Determination, Concerning Inspection Report 50-315/316-2003016 (DRS))
  • ML081630218  + (Confirmation of Telephone Report of a Prior Notice of the Need for a Bypass Per Part III, Section 11.B, NPDES Permit, No. 31B00016 Id)
  • ML060760281  + (Confirmation of Temporary Verbal Relief)
  • GO2-04-188, Confirmation of Verbal Agreement for Extension of Response Due Date  + (Confirmation of Verbal Agreement for Extension of Response Due Date)
  • ML23088A052  + (Confirmation of the Implementation of Category III Special Nuclear Material Requirements for American Centrifuge Operating, LLCs American Centrifuge Plant - HALEU Program)
  • ML16347A637  + (Confirmation of the Initial License Reexamination)
  • ML20163A680  + (Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications)
  • ML20045C521  + (Confirmative Action Ltr,Rev 1,confirming That Vendor Will Not Use Model BU-7 Packaging W/O Prior NRC Approval,Except for Type & Form of Matl & Max Quantity of Matl Per Package Listed,Based on Vendor)
  • ML071720526  + (Confirmatory Action CAL-4-07-004 Letter Dated 6/21/07)
  • ML080280294  + (Confirmatory Action Closure Letter)
  • ML082350676  + (Confirmatory Action Letter (1-08-005))
  • ML052710221  + (Confirmatory Action Letter (3-05-001))
  • ML12296A937  + (Confirmatory Action Letter (4-12-004) - Comanche Peak Nuclear Power Plant, Units 1 and 2, Commitments Regarding Spent Fuel Pool Storage Practices)
  • ML101730329  + (Confirmatory Action Letter (CAL 2-10-003), Commitments to Address External Flooding Concerns)
  • ML070730269  + (Confirmatory Action Letter (CAL No. NRR-07-002))
  • ML070800449  + (Confirmatory Action Letter (CAL No. NRR-07-023) Palisades Nuclear Plant)
  • ML18096A688  + (Confirmatory Action Letter (CAL) No. NRR-2011-001)
  • ML13177A280  + (Confirmatory Action Letter (CAL) Revision 1 - Palisades Nuclear Plant Commitments to Address Safety Injection Refueling Water Tank (SIRWT) and Control Room Concrete Support Structure Leakage)
  • IR 05000293/2018012  + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012)
  • IR 05000293/2017010  + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2017010)
  • IR 05000293/2018013  + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018013)
  • IR 05000293/2018011  + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018011)
  • IR 05000293/2018010  + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018010)
  • ML19280D881  + (Confirmatory Action Letter (EA-19-097) - Fermi Power Plant, Unit 2 Commitment to Address Degraded Torus Coatings)
  • ML12285A263  + (Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation)
  • ML033510264  + (Confirmatory Action Letter - Aerotest Radiography and Research Reactor - Site Specific Compensatory Measures Implementation Plan)
  • ML070740294  + (Confirmatory Action Letter - Braidwood, Units 1 and 2)
  • ML13232A105  + (Confirmatory Action Letter - Browns Ferry Nuclear Plant, Units 1, 2, and 3, Commitments Related to the Integrated Improvement Plan)