Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML093100546 + (Confirmation of Requested Initial Operator License Examinations for Catawba Nuclear Station)
- ML14069A506 + (Confirmation of Requested Initial Operator License Examinations for Vogtle Nuclear Plant)
- ML12307A310 + (Confirmation of Requested Initial Operator License Examinations for Vogtle Nuclear Plant)
- ML120300523 + (Confirmation of Requested Initial Operator License Examinations for Vogtle Nuclear Plant)
- ML093100620 + (Confirmation of Requested Initial Operator License Examinations for Vogtle Nuclear Plant)
- ML093100583 + (Confirmation of Requested Initial Operator License Examinations for Browns Ferry Nuclear Plants)
- ML102770029 + (Confirmation of Requested Initial Operator License Examinations for Edwin I. Hatch Nuclear Plant - Hatch)
- ML120300362 + (Confirmation of Requested Initial Operator License Examination for Catawba Nuclear Station)
- ML102770108 + (Confirmation of Requested Initial Operator License Examination - Vogtle)
- ML102740318 + (Confirmation of Requested Initial Operator License Examinations - Harris)
- ML102770113 + (Confirmation of Requested Initial Operator License Examinations - Oconee)
- ML091690413 + (Confirmation of Retake Initial Operator License Examination: Kewaunee Power Station)
- ML19184A238 + (Confirmation of Revision to Kairos Power LLC, Principal Design Criteria for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431))
- ML19255H234 + (Confirmation of Revision to Kairos Power LLC Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled, High Temperature Reactor Topical Report (CAC No. 000431))
- ML12128A493 + (Confirmation of Revision to Regulatory Issue Summary 2011-004: Preparation and Scheduling of Operator Licensing Examinations: Palisades Nuclear Plant)
- ML091610638 + (Confirmation of Schedule for Submission of Information to Support Operating License Application Review)
- ML090830178 + (Confirmation of Schedule for Submission of Information to Support Operating License Application Review)
- ML092170587 + (Confirmation of Schedule for Submission of Information to Support Operating Licence Application Review)
- ML003676899 + (Confirmation of Selected Sump Design Survey Responses)
- L-2017-052, Confirmation of Submittal of 2016 Individual Monitoring Report + (Confirmation of Submittal of 2016 Individual Monitoring Report)
- 2CAN081004, Confirmation of Submittal of Additional Optimized ZIRLO Data + (Confirmation of Submittal of Additional Optimized ZIRLO Data)
- ML021300105 + (Confirmation of Telephone Conversation Between Mr. Brian Dolan & Robert C. Haag on 02/20/2002, Concerning McGuire self-assessment Meeting Scheduled for 06/06/2002)
- ML040500446 + (Confirmation of Telephone Conversation Regarding Preliminary Significance Determination, Concerning Inspection Report 50-315/316-2003016 (DRS))
- ML081630218 + (Confirmation of Telephone Report of a Prior Notice of the Need for a Bypass Per Part III, Section 11.B, NPDES Permit, No. 31B00016 Id)
- ML060760281 + (Confirmation of Temporary Verbal Relief)
- GO2-04-188, Confirmation of Verbal Agreement for Extension of Response Due Date + (Confirmation of Verbal Agreement for Extension of Response Due Date)
- ML23088A052 + (Confirmation of the Implementation of Category III Special Nuclear Material Requirements for American Centrifuge Operating, LLCs American Centrifuge Plant - HALEU Program)
- ML16347A637 + (Confirmation of the Initial License Reexamination)
- ML20163A680 + (Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications)
- ML20045C521 + (Confirmative Action Ltr,Rev 1,confirming That Vendor Will Not Use Model BU-7 Packaging W/O Prior NRC Approval,Except for Type & Form of Matl & Max Quantity of Matl Per Package Listed,Based on Vendor)
- ML071720526 + (Confirmatory Action CAL-4-07-004 Letter Dated 6/21/07)
- ML080280294 + (Confirmatory Action Closure Letter)
- ML16169A193 + (Confirmatory Action Letter)
- ML070800327 + (Confirmatory Action Letter)
- ML070800017 + (Confirmatory Action Letter)
- ML070790113 + (Confirmatory Action Letter)
- ML070780413 + (Confirmatory Action Letter)
- ML070780319 + (Confirmatory Action Letter)
- ML070780206 + (Confirmatory Action Letter)
- ML070670264 + (Confirmatory Action Letter)
- ML070660103 + (Confirmatory Action Letter)
- ML070660025 + (Confirmatory Action Letter)
- 0CAN061604, Confirmatory Action Letter + (Confirmatory Action Letter)
- ML041130447 + (Confirmatory Action Letter)
- ML070820079 + (Confirmatory Action Letter)
- ML030310263 + (Confirmatory Action Letter)
- ML082350676 + (Confirmatory Action Letter (1-08-005))
- ML052710221 + (Confirmatory Action Letter (3-05-001))
- ML12296A937 + (Confirmatory Action Letter (4-12-004) - Comanche Peak Nuclear Power Plant, Units 1 and 2, Commitments Regarding Spent Fuel Pool Storage Practices)
- ML101730329 + (Confirmatory Action Letter (CAL 2-10-003), Commitments to Address External Flooding Concerns)
- ML070730269 + (Confirmatory Action Letter (CAL No. NRR-07-002))
- ML070800449 + (Confirmatory Action Letter (CAL No. NRR-07-023) Palisades Nuclear Plant)
- ML18096A688 + (Confirmatory Action Letter (CAL) No. NRR-2011-001)
- ML13177A280 + (Confirmatory Action Letter (CAL) Revision 1 - Palisades Nuclear Plant Commitments to Address Safety Injection Refueling Water Tank (SIRWT) and Control Room Concrete Support Structure Leakage)
- IR 05000293/2018012 + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012)
- IR 05000293/2017010 + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2017010)
- IR 05000293/2018013 + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018013)
- IR 05000293/2018011 + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018011)
- IR 05000293/2018010 + (Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018010)
- ML19280D881 + (Confirmatory Action Letter (EA-19-097) - Fermi Power Plant, Unit 2 Commitment to Address Degraded Torus Coatings)
- ML12285A263 + (Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation)
- ML033510264 + (Confirmatory Action Letter - Aerotest Radiography and Research Reactor - Site Specific Compensatory Measures Implementation Plan)
- ML070740294 + (Confirmatory Action Letter - Braidwood, Units 1 and 2)
- ML13232A105 + (Confirmatory Action Letter - Browns Ferry Nuclear Plant, Units 1, 2, and 3, Commitments Related to the Integrated Improvement Plan)