Confirmation of Revision to Regulatory Issue Summary 2011-004: Preparation and Scheduling of Operator Licensing Examinations: Palisades Nuclear Plant
ML12128A493
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/04/2012
From: Charles Phillips
Operations Branch III
To: Vitale A
Entergy Nuclear Operations
References
Download: ML12128A493 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 4, 2012 Mr. Anthony Vitale Vice-President, Operations Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

CONFIRMATION OF REVISION TO REGULATORY ISSUE

SUMMARY

2011-004: PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS: PALISADES NUCLEAR PLANT

Dear Mr. Vitale:

We have received your Letter PNP 2012-031, dated April 11, 2012. In that letter, you included a revised NRC Form 536, Operator Licensing Examination Data sheet for the Palisades Nuclear Plant. You requested initial operator licensing examinations in October 2012, September 2014, and August 2016.

In response, we have previously rescheduled an initial operator licensing exam for the weeks of October 1 and October 8, 2012, with an on-site validation date scheduled for the week of September 3, 2012. Additionally, we had already scheduled you for an initial operator licensing exam the weeks of September 8 and 15, 2014, with an on-site validation scheduled for the week of August 18, 2014. This date has not changed. For 2016, we moved the initial operator licensing exam from May 2016 to the weeks of August 1 and 8, 2016, with an on-site validation date of the week of July 4, 2016.

We understand that your staff will develop these examinations. Because your previous corporate letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

A. Vitale In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Charles Phillips, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-255 License Nos. DPR-20 cc: Distribution via ListServ'

A. Vitale In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Charles Phillips, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-255 License Nos. DPR-20 cc: Distribution via ListServ' DISTRIBUTION:

Shawn Williams RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 050412 Palisades Exam Change 2012 KW.docx G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII N NAME RKWalton:ls CPhillips DATE 4/30/12 5/04/12 OFFICIAL RECORD COPY