ML093100583
| ML093100583 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 11/06/2009 |
| From: | Kennedy K Division of Reactor Safety II |
| To: | Swafford P Tennessee Valley Authority |
| References | |
| Download: ML093100583 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 November 6, 2009 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR BROWNS FERRY NUCLEAR PLANTS
Dear Mr. Swafford:
In a letter dated August 17, 2009, your staff responded to Regulatory Issue Summary 2009-011 and requested we schedule initial license operator examinations for Browns Ferry Nuclear Plants. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:
Plant / Station 2010 2011 Date Applicants Date Applicants Browns Ferry 6/7 12 2/7 20 8/8 19 On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change.
Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
A supplementary letter will be sent to each stations training manager approximately 120 days prior to the initial examination. The letter will provide the training manager with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch, at 404-562-4550.
TVA 2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Kriss M. Kennedy, Director Division of Reactor Safety Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68 cc: (See page 3)
X SUNSI REVIEW COMPLETE MTW OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE PGC /RA/
MTW /RA/
KMK /RA/
NAME PCapehart MWidmann KKennedy DATE 11/03/2009 11/04/2009 11/06/2009 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
TVA 3
cc w/encl:
Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority Electronic Mail Distribution Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority Electronic Mail Distribution William R. Campbell Senior Vice President Fleet Engineering Tennessee Valley Authority 6A Lookout Place 1101 Market Place Chattanooga, TN 37402-2801 Keith J. Polson Vice President Nuclear Operations Support Tennessee Valley Authority Electronic Mail Distribution R. G. (Rusty) West Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Frederick Russell Godwin Manager, Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 James J. Randich Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 General Counsel Tennessee Valley Authority Electronic Mail Distribution Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority Electronic Mail Distribution Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority Electronic Mail Distribution Michael J. Lorek Vice President - Nuclear Oversight Tennessee Valley Authority Electronic Mail Distribution Fredrick C. Mashburn (Acting) Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution R. M. Krich Vice President Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Robert J. Whalen Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-280 Kirksey E. Whatley Director Office of Radiation Control Alabama Dept. of Public Health Electronic Mail Distribution (cc continued next page)
TVA 4
cc continued:
Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Dr. D. E. Williamson State Health Officer Alabama Dept. of Public Health Electronic Mail Distribution Mr. Donald Grissette Acting Training Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Decatur, AL 35609-2000
TVA 5
Letter to Preston D. Swafford from Kriss M. Kennedy dated November 6, 2009
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR BROWNS FERRY NUCLEAR PLANTS Distribution w/encl:
RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerry Resource ORA, RII K. Kennedy H. Christensen M. Widmann P. Capehart J. Vincent E. Guthrie J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing