MONTHYEARML18030A7422017-07-14014 July 2017 Irrevocable Standby Letter of Credit (Redacted) Project stage: Request ML18054A0772018-03-0808 March 2018 Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Other ML18092A0872018-03-27027 March 2018 Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Request ML18087A3892018-03-28028 March 2018 Meeting Slides for the April 3, 2018, Public Meeting Between Shine Medical Technologies. Inc. and the NRC Project stage: Request ML18162A0542018-03-28028 March 2018, 29 March 2018, 3 April 2018, 18 June 2018 Shine Medical Technologies, Inc. April 3, 2018 Public Meeting Project stage: Request ML18096A6882018-04-0303 April 2018 Confirmatory Action Letter (CAL) No. NRR-2011-001 Project stage: Request ML18096A4552018-04-0303 April 2018 Shine Operating License Pre-Application Meeting (Environmental Presentation Slides) Project stage: Meeting ML18087A3402018-04-0303 April 2018 Response to Request for Extension of Time to Respond to Letter Regarding Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Other ML18096A6892018-04-0303 April 2018 Arrr Restart Plan (4/3/2018) Approach to Critical, Control Rod and Power Calibrations Project stage: Request ML18130A5782018-05-0707 May 2018 Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Request ML18162A1362018-05-11011 May 2018, 18 June 2018 Shine Medical Technologies, Inc. May 23, 2018 Public Meeting Project stage: Request ML18138A2912018-05-16016 May 2018 Shine Medical Technologies, Inc. - Submittal of Meeting Slides for the May 23 and 24, 2018 with NRC Project stage: Request ML18128A0342018-05-16016 May 2018 Response to Second Request for Extension of Time to Respond to Letter Regarding Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Other ML18156A1302018-06-0101 June 2018 Inc. - Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Request ML18155A6032018-06-0707 June 2018 Response to Third Request for Extension of Time to Respond to Letter Regarding Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Other ML18162A1172018-06-18018 June 2018 Shine Medical Technologies Acknowledgment of Receipt of 2016 Annual Financial Report Project stage: Other ML18162A0552018-06-18018 June 2018 Shine Medical Technologies April 3, 2018 Public Meeting Summary Project stage: Meeting ML18162A1162018-06-18018 June 2018 Shine Medical Technologies Annual Financial Report Project stage: Request ML18162A1182018-06-18018 June 2018 Shine Medical Technologies Response to Request for Withholding Letter for 2016 Annual Financial Report Project stage: Other ML18162A1292018-06-18018 June 2018 Shine Medical Technologies, Inc. - Acknowledgment of Receipt of Periodic Reports on Construction Permit Conditions Project stage: Other ML18162A1382018-06-18018 June 2018 May 23-24, 2018, Summary of Meeting with Shine Medical Technologies, Inc Project stage: Meeting ML18127B7062018-06-21021 June 2018 Closure of NRC Confirmatory Action Letter No. NRR-2011-001 Project stage: Other ML18221A4532018-06-27027 June 2018, 17 August 2018 Shine Medical Technologies, Inc. June 2018 Public Meeting Project stage: Request ML18187A2162018-07-0202 July 2018 Resubmittal of Meeting Slides for the June 28, 2018, Public Meeting Between Shine Medical Technologies, Inc. and the NRC Project stage: Request ML18197A0802018-07-10010 July 2018 Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Request ML18193A1412018-07-16016 July 2018 Response to Fourth Request for Extension of Time to Respond to Letter Regarding Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Other ML18277A1962018-07-17017 July 2018 Amendment to Standby Letter of Credit (Redacted) Project stage: Request ML18206A7262018-07-18018 July 2018 Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor (Redacted) Project stage: Request ML18221A4542018-08-17017 August 2018 Summary of Meeting with Shine Medical Technologies, Inc Project stage: Meeting ML18221A4552018-08-17017 August 2018 Shine Medical Technologies, Inc. Request for Withholding Information from Public Disclosure of Proprietary Information Project stage: Withholding Request Acceptance ML18239A2192018-08-27027 August 2018 Request for Confirmation of the 10 CFR Part 140 Financial Protection Requirements for the Shine Facility Project stage: Request ML18268A3442018-10-0202 October 2018 Letter of Appreciation for the Tour of the Research Test Reactor Fuel Fabrication Facility Provided to the U.S. Nuclear Regulatory Commission on August 21, 2018 EPID No. L-2017-PMP-0014 Project stage: Other ML18340A1712018-12-10010 December 2018 Shine Medical Technologies, Inc. - Acknowledgement of Receipt of Periodic Report on Construction Permit Conditions Project stage: Other ML18340A2762018-12-19019 December 2018 Shine Medical Technologies, Inc. - Acknowledgment of Receipt of Request for Confirmation of Applicable Financial Protection Requirements Project stage: Other ML19025A2642019-01-22022 January 2019 Shine Medical Technologies, Inc. Submittal of Meeting Slides for the January 29 and 30, 2019 Meeting with the NRC Project stage: Request ML19024A3522019-01-22022 January 2019 Shine Medical Technologies - Meeting Slides for the January 31, 2019 Public Meeting Between Shine Medical Technologies, Inc. and the NRC Project stage: Request ML19025A2752019-01-22022 January 2019 Shine Medical Technologies, Inc. Submittal of Meeting Slides for the January 29 and 30, 2019 Meeting with the NRC Project stage: Request ML19015A3522019-02-15015 February 2019 Irrevocable Standby Letter of Credit for the Aerotest Radiography and Research Reactor Project stage: Other ML19071A1852019-03-22022 March 2019 Shine Medical Technologies, Inc. - Request for Withholding from Public Disclosure Project stage: Other ML19071A1812019-03-22022 March 2019 Shine Medical Technologies, Inc. - January 31, 2019 Public Meeting Summary Project stage: Meeting ML19071A1792019-03-22022 March 2019 Shine Medical Technologies, Inc. January 31, 2019 Public Meeting Project stage: Request ML19071A1802019-03-22022 March 2019 Shine Medical Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2018-06-18
[Table View] |
Text
AEROTEST OPERATIONS, INC.
3455 FOSTORIA WAY* SAN RAMON, CA 94583 * (925) 866-1212
- FAX (925) 866-1716 April 3, 2018 ATTENTION: Document Control Desk U.S. Nuclear Regulatory Commission White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 AEROTEST RADIOGRAPHY AND RESEARCH REACTOR DOCKET NO. 50-228/LICENSE NO. R-98.
Confirmatory Action Letter (CAL) no NRR-2011-001 Ladies and Gentlemen:
I request that the Confirmatory Action Letter (CAL) no. NRR-2011-001 dated February 26, 2011 be rescinded. The terms listed are no longer relevant and provide no safety protections for Aerotest workers, the ARRR or to the general public. The intent of the document allowed necessary operations for regulatory compliance (i.e. reactor thermal power, control rod calibrations, etc.). This limited operation allowed to maintain reactor readiness and to assure required level and operation proficiency of Aerotest staff. The CAL also suspended the use of the reactor for research and service operations until Aerotest can obtain necessary approvals.
The other requirements listed specifically are out of date due to the completion of the indirect transfer.
The current circumstance places Aerotest in non-compliance of the CAL as written. The reactor core is currently defueled and the required TS surveillances and Requalification reactivity manipulations are not being performed. The other terms have not been completed by the schedule presented in the document.
Let me also clearly state, the ARRR-core was defueled in 2012, and the required ARRR TS surveillances concerning reactor performance (thermal power and rod worth calibrations, rod-drop times, core reactivity limits etc.) were suspended. The same can be said for the portion of operator requalification program performing the quarterly minimal number of reactivity
manipulations. Both of these issues will be remediated in the ARRR Restart Plan (dated 4/3/2018). Also provided in the ARRR Restart Plan, the condition that no movement of fuel for an approach to criticality measurement will be attempted until the necessary RSC and NRC approvals are granted.
Should you have any questions or require additional information regarding this submission, please contact AO President David M. Slaughter, Ph.D. at (801) 631 5919 or dmsraven@gmail.com.
I declare under penalty of perjury that the statements made are correct and truthful.
Si~t-y_o_u_r_s,~~~
David M. Slaughter, Ph.D.
President and Reactor Admin.
Aerotest Operations, Inc.