MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] Category:Schedule and Calendars
MONTHYEARWBL-23-026, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2023-01 - Preparation and Scheduling of Operator Licensing Examinations2023-05-18018 May 2023 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2023-01 - Preparation and Scheduling of Operator Licensing Examinations ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections WBL-21-023, Preparation and Scheduling of Operator Licensing Examination2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examination ML15110A4052015-05-21021 May 2015 Summary of Category 1 Public Meeting with Tennessee Valley Authority on the Fire Protection Report for Watts Bar Nuclear Plant, Unit 2 IR 05000391/20146062014-09-0303 September 2014 Mid-Cycle Assessment Letter Watts Bar Nuclear Plant, Unit 2 (NRC Inspection Report 05000391/2014606) ML12307A1042012-10-29029 October 2012 Tennessee Valley Authority - Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML0921705872009-08-14014 August 2009 Confirmation of Schedule for Submission of Information to Support Operating Licence Application Review ML0916106382009-06-12012 June 2009 Confirmation of Schedule for Submission of Information to Support Operating License Application Review ML0821206382008-07-28028 July 2008 NRC Regulatory Issue Summary (RIS) 2008-16 - Preparation and Scheduling of Operator Licensing Examinations 2023-05-18
[Table view] |
Text
June 12, 2009 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT UNIT 2 - CONFIRMATION OF SCHEDULE FOR SUBMISSION OF INFORMATION TO SUPPORT OPERATING LICENSE APPLICATION REVIEW
Dear Mr. Bhatnagar:
The Tennessee Valley Authority (TVA) has recently updated its schedule reflecting the remaining topics to be submitted in support of the operating license application for Watts Bar Nuclear Plant, Unit 2. The schedule provides the anticipated dates that TVA will provide information amending the final safety analysis report to the Nuclear Regulatory Commission (NRC). On the basis of its review of the schedule, the NRC anticipates receiving information on the topic sections listed in the enclosure to this letter before August 30, 2009. Therefore, the NRC staff requests that TVA verify the Safety Evaluation Report sections to be provided on August 27, 2009, will include all anticipated items.
If you should have any questions, please contact Ayanna Rice at 301-415-5490.
Sincerely,
/RA/
Patrick D. Milano, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Status of Submittal Items for June-August 2009 cc w/encl: Distribution via Listserv
Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT UNIT 2 - CONFIRMATION OF SCHEDULE FOR SUBMISSION OF INFORMATION TO SUPPORT OPERATING LICENSE APPLICATION REVIEW
Dear Mr. Bhatnagar:
The Tennessee Valley Authority (TVA) has recently updated its schedule reflecting the remaining topics to be submitted in support of the operating license application for Watts Bar Nuclear Plant, Unit 2. The schedule provides the anticipated dates that TVA will provide information amending the final safety analysis report to the Nuclear Regulatory Commission (NRC). On the basis of its review of the schedule, the NRC anticipates receiving information on the topic sections listed in the enclosure to this letter before August 30, 2009. Therefore, the NRC staff requests that TVA verify the Safety Evaluation Report sections to be provided on August 27, 2009, will include all anticipated items.
If you should have any questions, please contact Ayanna Rice at 301-415-5490.
Sincerely,
/RA/
Patrick D. Milano, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391
Enclosure:
Status of Submittal Items for June-August 2009 cc w/encl: Distribution via Listserv DISTRIBUTION: RidsOgcRp Resource RidsRgn2MailCenter Resource PUBLIC RidsNrrDorlLpwb Resource A. Rice LPWB Reading File RidsNrrLABClayton Resource RidsNrrDorlDpr Resource RidsNrrPMWattsBar2 Resource RidsRgn2MailCenter Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No.: ML091610638 OFFICE DORL/CPA/PPM LPWB/PM LPWB/LA LPWB/BC NAME ARice/PMilano for PMilano BClayton LRaghavan DATE 06/ 11 /09 06/ 11 /09 06/ 11 /09 06/ 12 /09 OFFICIAL AGENCY RECORD
Expected Submittal of Topic Items Related to the Safety Evaluation Report (SER)
Between June and August 2009 SER Section Title Expected Due Date 1.
1.0 INTRODUCTION
8/27/2009 1.1.1 METRICATION 8/27/2009 1.1.2 PROPRIETARY INFORMATION 8/27/2009 1.1.4 ADDITIONAL INFORMATION 8/27/2009 1.3.0 COMPARISON W/ SIM FACILITY DESIGNS 8/27/2009 1.3.1 COMPARISON W/ THE SEQUOYAH NUC PLANT 8/27/2009 1.3.2 COMPARISON WITH OTHER FACILITIES 8/27/2009 1.4.0 IDENTIFY OF AGENTS & CONTRACTORS 8/27/2009 1.7.0
SUMMARY
OF OUTSTANDING ISSUES 8/27/2009 1.9.0 LICENSE CONDITIONS 8/27/2009 1.10.0 UNRESOLVED SAFETY ISSUES 8/27/2009 2.1.0 GEOGRAPHY & DEMOGRAPHY 8/27/2009 2.1.1 SITE LOCATION & DESCRIPTION 8/27/2009 2.1.2 EXCLUSION AREA AUTHORITY & CONTROL 8/27/2009 2.1.1 POPULATION DISTRIBUTION 8/27/2009 2.
1.4 CONCLUSION
S 8/27/2009 2.2.0 NEARBY INDUST, TRANS, & MIL FACILITY 8/27/2009 2.2.1 TRANSPORTATION ROUTES 8/27/2009 2.2.2 NEARBY FACILITIES 8/27/2009 2.
2.3 CONCLUSION
S 8/27/2009 2.3.0 METEOROLOGY 8/27/2009 2.3.1 REGIONAL CLIMATOLOGY 8/27/2009 2.3.2 LOCAL METEOROLOGY 8/27/2009 2.3.3 ONSITE METEOROLOGICAL MEASUREMENTS 8/27/2009 2.3.4 SHORT-TERM (ACCIDENT) DIFFUSION EST 8/27/2009 2.3.5 LONG-TERM (ROUTINE) DIFFUSION EST 8/27/2009 2.5.0 GEOLOGICAL, SEISMOLOGICAL, GEOTECH 8/27/2009 2.5.1 GEOLOGY 8/27/2009 2.5.2 SEISMOLOGY 8/27/2009 2.5.3 SURFACE FAULTING 8/27/2009 2.5.4 STABILITY OF SUBSURFACE MATERIALS 8/27/2009 2.5.5 STABILITY OF SLOPES 8/27/2009 2.
6.0 REFERENCES
8/27/2009 3.4.0 FLOOD LEVEL (FLOOD) DESIGN 8/27/2009 3.4.1 FLOOD PROTECTION 8/27/2009 6.2.6 CONTAINMENT LEAKAGE TESTING 8/27/2009 7.5.0 SAFETY-RELATED DISP INSTRUMENTATION 8/27/2009 7.5.1 SYSTEM DESCRIPTION 8/27/2009 7.5.2 POST-ACCIDENT MONITORING SYSTEM 8/27/2009 7.5.3 IE BULLETIN 79-27 8/27/2009 7.
5.4 CONCLUSION
S 8/27/2009 7.9.0 DATA COMMUNICATION SYS (SRPTOC) 8/27/2009 Enclosure