Text

June 12, 2009 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

WATTS BAR NUCLEAR PLANT UNIT 2 - CONFIRMATION OF SCHEDULE FOR SUBMISSION OF INFORMATION TO SUPPORT OPERATING LICENSE APPLICATION REVIEW

Dear Mr. Bhatnagar:

The Tennessee Valley Authority (TVA) has recently updated its schedule reflecting the remaining topics to be submitted in support of the operating license application for Watts Bar Nuclear Plant, Unit 2. The schedule provides the anticipated dates that TVA will provide information amending the final safety analysis report to the Nuclear Regulatory Commission (NRC). On the basis of its review of the schedule, the NRC anticipates receiving information on the topic sections listed in the enclosure to this letter before August 30, 2009. Therefore, the NRC staff requests that TVA verify the Safety Evaluation Report sections to be provided on August 27, 2009, will include all anticipated items.

If you should have any questions, please contact Ayanna Rice at 301-415-5490.

Sincerely,

/RA/

Patrick D. Milano, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

Status of Submittal Items for June-August 2009 cc w/encl: Distribution via Listserv

Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

WATTS BAR NUCLEAR PLANT UNIT 2 - CONFIRMATION OF SCHEDULE FOR SUBMISSION OF INFORMATION TO SUPPORT OPERATING LICENSE APPLICATION REVIEW

Dear Mr. Bhatnagar:

The Tennessee Valley Authority (TVA) has recently updated its schedule reflecting the remaining topics to be submitted in support of the operating license application for Watts Bar Nuclear Plant, Unit 2. The schedule provides the anticipated dates that TVA will provide information amending the final safety analysis report to the Nuclear Regulatory Commission (NRC). On the basis of its review of the schedule, the NRC anticipates receiving information on the topic sections listed in the enclosure to this letter before August 30, 2009. Therefore, the NRC staff requests that TVA verify the Safety Evaluation Report sections to be provided on August 27, 2009, will include all anticipated items.

If you should have any questions, please contact Ayanna Rice at 301-415-5490.

Sincerely,

/RA/

Patrick D. Milano, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-391

Enclosure:

Status of Submittal Items for June-August 2009 cc w/encl: Distribution via Listserv DISTRIBUTION: RidsOgcRp Resource RidsRgn2MailCenter Resource PUBLIC RidsNrrDorlLpwb Resource A. Rice LPWB Reading File RidsNrrLABClayton Resource RidsNrrDorlDpr Resource RidsNrrPMWattsBar2 Resource RidsRgn2MailCenter Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No.: ML091610638 OFFICE DORL/CPA/PPM LPWB/PM LPWB/LA LPWB/BC NAME ARice/PMilano for PMilano BClayton LRaghavan DATE 06/ 11 /09 06/ 11 /09 06/ 11 /09 06/ 12 /09 OFFICIAL AGENCY RECORD

Expected Submittal of Topic Items Related to the Safety Evaluation Report (SER)

Between June and August 2009 SER Section Title Expected Due Date 1.

1.0 INTRODUCTION

8/27/2009 1.1.1 METRICATION 8/27/2009 1.1.2 PROPRIETARY INFORMATION 8/27/2009 1.1.4 ADDITIONAL INFORMATION 8/27/2009 1.3.0 COMPARISON W/ SIM FACILITY DESIGNS 8/27/2009 1.3.1 COMPARISON W/ THE SEQUOYAH NUC PLANT 8/27/2009 1.3.2 COMPARISON WITH OTHER FACILITIES 8/27/2009 1.4.0 IDENTIFY OF AGENTS & CONTRACTORS 8/27/2009 1.7.0

SUMMARY

OF OUTSTANDING ISSUES 8/27/2009 1.9.0 LICENSE CONDITIONS 8/27/2009 1.10.0 UNRESOLVED SAFETY ISSUES 8/27/2009 2.1.0 GEOGRAPHY & DEMOGRAPHY 8/27/2009 2.1.1 SITE LOCATION & DESCRIPTION 8/27/2009 2.1.2 EXCLUSION AREA AUTHORITY & CONTROL 8/27/2009 2.1.1 POPULATION DISTRIBUTION 8/27/2009 2.

1.4 CONCLUSION

S 8/27/2009 2.2.0 NEARBY INDUST, TRANS, & MIL FACILITY 8/27/2009 2.2.1 TRANSPORTATION ROUTES 8/27/2009 2.2.2 NEARBY FACILITIES 8/27/2009 2.

2.3 CONCLUSION

S 8/27/2009 2.3.0 METEOROLOGY 8/27/2009 2.3.1 REGIONAL CLIMATOLOGY 8/27/2009 2.3.2 LOCAL METEOROLOGY 8/27/2009 2.3.3 ONSITE METEOROLOGICAL MEASUREMENTS 8/27/2009 2.3.4 SHORT-TERM (ACCIDENT) DIFFUSION EST 8/27/2009 2.3.5 LONG-TERM (ROUTINE) DIFFUSION EST 8/27/2009 2.5.0 GEOLOGICAL, SEISMOLOGICAL, GEOTECH 8/27/2009 2.5.1 GEOLOGY 8/27/2009 2.5.2 SEISMOLOGY 8/27/2009 2.5.3 SURFACE FAULTING 8/27/2009 2.5.4 STABILITY OF SUBSURFACE MATERIALS 8/27/2009 2.5.5 STABILITY OF SLOPES 8/27/2009 2.

6.0 REFERENCES

8/27/2009 3.4.0 FLOOD LEVEL (FLOOD) DESIGN 8/27/2009 3.4.1 FLOOD PROTECTION 8/27/2009 6.2.6 CONTAINMENT LEAKAGE TESTING 8/27/2009 7.5.0 SAFETY-RELATED DISP INSTRUMENTATION 8/27/2009 7.5.1 SYSTEM DESCRIPTION 8/27/2009 7.5.2 POST-ACCIDENT MONITORING SYSTEM 8/27/2009 7.5.3 IE BULLETIN 79-27 8/27/2009 7.

5.4 CONCLUSION

S 8/27/2009 7.9.0 DATA COMMUNICATION SYS (SRPTOC) 8/27/2009 Enclosure