Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Assessment Follow-Up". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19220C622  + (Assesses Impact of TMI Incident on Existing Emergency Control Ctr Bypass Programs.Analysis & Reporting Expected to Slip Due to Diversion of Key Staff)
  • ML20080Q607  + (Assesses Operability of Purge & Vent Valves in Light of Concerns Outlined in Ser.Valves Will Be Opened to No More than 30 Degrees & Will Close from 30 Degrees Open Position in Event of DBA-LOCA)
  • ML20235C944  + (Assesses Plant Application for Ol,Per 740821 Agreement to Render Technical Assistance.No Const or Licensing Delays Anticipated Pending Resolution of Concern Re Dynamic Loads on Containment Resulting from LOCA & Relief Valve Action)
  • ML20050D043  + (Assesses Probable Consequences If Commission Decides to Review ALAB-590,eliminating Bases Requirement for Admission of Contention)
  • ML19350B956  + (Assesses R&D Associates, Some Hydrogen Control Considerations for Ice-Condenser Nuclear Plants. Test Results Confirm Statepoint Determinations in Steam Test Series.Fog Coagulation Needs More Research)
  • ML19221A479  + (Assesses RCS Behavior in Percolating Mode Before Buildup of Large Amounts of Noncondensibles)
  • ML19338F474  + (Assesses Util Capability to Implement near-term NRC Action Plan Requirements (NUREG 0660) & Proposed Schedule.Plan Items Re Implementation Status,Proposed Implementation Plan & Current Shift Technical Advisor Training Program Encl)
  • ML19276E424  + (Assessing Impact of Nuclear Power Plants on Environ, Second Annual Research Progress Rept)
  • ML25072A129  + (Assessing Independence from Human Performance: Considerations for Functional Requirements Analysis and Function Allocation)
  • ML20006D514  + (Assessing Need for Containment Performance Design Objectives for Us Nuclear Reactors, Minority Rept from Containment Performance Design Objective Workshop)
  • ML20059L029  + (Assessing Organizational Climate in Nuclear Industry for Employee Reporting of Safety Concerns)
  • ML20198J818  + (Assessing Performance & Organizational Roles)
  • ML23305A231  + (Assessing the Ability to Monitor the National Materials Program Performance Considerations and Recommendations)
  • ML20070B163  + (Assessing the Environmental Availability of Uranium in Soils and Sediments)
  • ML24292A145  + (Assessing the Impact of Nonlinearity and Liquefaction on the Local Seismic Hazard Using CPT-Calibrated Soil Models)
  • ML23276B406  + (Assessing the Impact of the Inflation Reduction Act on Nuclear Plant Power Uprate and Hydrogen Cogeneration)
  • ML20210S186  + (Assessment & Application of Thermal-Hydraulic Phenomena for Severe Accident Decisions, Technical Proposal)
  • ML12275A481  + (Assessment - Mid Cycle 2012)
  • ML082840099  + (Assessment -Davis-Besse Nuclear Power Station, Unit No. 1 - Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications (TAC 6398))
  • ML20077J031  + (Assessment Against RHR Safety/Relief Valve Discharge Steam Condensation Loads)
  • ML102790438  + (Assessment Checklist for Internal Control)
  • ML080180337  + (Assessment F/U Letter)
  • ML102280386  + (Assessment Follow Up Letter)
  • ML13310A318  + (Assessment Follow Up Letter - 11/6/13)
  • ML041030274  + (Assessment Follow Up Letter-oyster Creek Nuclear Power Plant)
  • ML030280523  + (Assessment Follow-Up - Sequoyah Nuclear Plant, Unit 2)
  • ML070300206  + (Assessment Follow-Up - Turkey Point Nuclear Plant, Unit 3)
  • ML12220A393  + (Assessment Follow-Up Letter)
  • ML042250413  + (Assessment Follow-Up Letter)
  • ML051230530  + (Assessment Follow-Up Letter (Palo Verde Station))
  • IR 05000352/2014009  + (Assessment Follow-Up Letter (Report 05000352/2014009 and 05000353/2014009))
  • ML101110748  + (Assessment Follow-Up Letter - Browns Ferry Nuclear Station Units 1, 2 and 3)
  • ML063210050  + (Assessment Follow-Up Letter - Calvert Cliffs Nuclear Power Plant)
  • ML063120257  + (Assessment Follow-Up Letter - Dresden Nuclear Power Station, Unit 2)
  • ML071280711  + (Assessment Follow-Up Letter - Duane Arnold Energy Center Dated May 8, 2007)
  • ML070450011  + (Assessment Follow-Up Letter - Farley Nuclear Plant)
  • ML071000034  + (Assessment Follow-Up Letter - Nine Mile Point Nuclear Power Station)
  • ML031490125  + (Assessment Follow-Up Letter - Nine Mile Point Nuclear Station, Unit 1)
  • ML071360118  + (Assessment Follow-Up Letter - R.E. Ginna Nuclear Power Plant)
  • ML101200565  + (Assessment Follow-Up Letter - St. Lucie, Unit 1)
  • ML101790479  + (Assessment Follow-Up Letter - Turkey Point, Unit 3)
  • ML101590249  + (Assessment Follow-Up Letter - Wolf Creek Generating Station)
  • ML15128A166  + (Assessment Follow-Up Letter 150504)
  • ML16315A169  + (Assessment Follow-Up Letter 2016)
  • ML14211A053  + (Assessment Follow-Up Letter for Arkansas Nuclear One, Units 1 and 2)
  • IR 05000318/2024007  + (Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007))
  • ML14302A082  + (Assessment Follow-Up Letter for Clinton Power Station)
  • ML14037A328  + (Assessment Follow-Up Letter for Clinton Power Station)
  • ML17320A265  + (Assessment Follow-Up Letter for Columbia Generating Station)
  • ML18151A379  + (Assessment Follow-Up Letter for Columbia Generating Station)