ML19220C622

From kanterella
Jump to navigation Jump to search
Assesses Impact of TMI Incident on Existing Emergency Control Ctr Bypass Programs.Analysis & Reporting Expected to Slip Due to Diversion of Key Staff
ML19220C622
Person / Time
Site: Crane 
Issue date: 04/11/1979
From: Beckner W
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Serkiz A
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
NUDOCS 7905110328
Download: ML19220C622 (1)


Text

-

~

Distribution Subfecl Chron Cir AFR 111979 Branch R/F

^

RD3eckner WDBeckner R/F NEHCRAhiMt FOR: Aleck h. Serkiz, Acting Chief Separate Lffects Ecsearch branch Division of Reactcr Safety Research FR0h:

William D. beckner Separate Effects Research Branch Division of heactor Lafety kescarch SOLJECT:

IMFACT OF THREE HILE ISLNiD ACCIDENT CH EXISTIhG ECC bYh55 PROLIJ,t 5 Battelle Colur. bus Laboratories is providing assistance to RES in analyzing t:.e Tnree F.ile Islanc acciut.nt thrcut;n u.e techi.ical assistar.ce tasi uf the existing LLC dypass Frosrac. A separate accounting of this expenciture is Leir.g u di..

The iuract of this work or. the ongeins prograr. is difficult to estimate cus to the uncertainty in effort rewired. Facility r.cGificaticns and testic.9 will r ut de delayed. bewcycr, it is expected tnat analysis anc refortir.5 will slip due to civersien of Ley staff. he funding for this wcrk has been budcett-c.

Creare is providin5 assistar.cc to the industry in analyzint the accident.

Tr,is ir. pacts i.kC prograc.s through the diversior, of key staff. The iuudiutc is;act is a slippage of Creare input. for the Ei.L oypass RIL.

This slippap. is currently estiutec tc only te a fev, acys.

An estis. ate of progra= and funding icpact will be prcvided when it is availacli.. This uc.c is proviced fcr ycur preliriinary notification.

D

'# bY#

c Willias L. Bectner Sep6 rate Effects Research Branch Division of xeccter Safety Research cc:

L. S. Tent C. E. Johnson RSR:W:SE WD5eckner:bsd 1032g 98 063

?

'"